Loading…
Loading…
Tender Value
₹11.0 L
EMD Value
₹22,040
Closing Date
15 Jun 2026, 12:00 pm
EE
VIKAS BHAWAN VARANASI
Gram sabha benipur sajoi mainar par kundariya lakshirampur border par puliya nirman karya
2026_REDUP_1139652_3
12 DATE 02-04-2026
Open Tender
Civil Works
90 days
EE RED VARANASI
Please refer Tender documents.
2 documents required · 2 mandatory
₹766
₹22,040
Yes
14 May 2026
14 May 2026
15 Jun 2026
14 May 2026
15 Jun 2026
14 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation in ordinary soil including lift up or 1.50m and lead up to 30m and including lilling, watering and ramming excavated earth in to trenches or in to the space between the structure and sides of foundation SI No. 251 | 0.8 | cum | - | - | BI01010001010000000000000515BI0100001113 |
| 2 | Providing and Laying CC 1:3:6 with cement, Coarse sand, brick ballast (53-22.4) mm size including all cost of materials. T&P and Lab our etc SI. No. 280 | 1 | cum | - | - | BI01010001010000000000000515BI0100001114 |
| 3 | Providing & constructing 1st class brick work with 1:3 cement mortar including all cost of materials, scaffolding. T&P and labours etc as per PWD SOR ch 6 item no 307 | - | cum | - | - | BI01010001010000000000000515BI0100001115 |
| 4 | Providing & constructing 1st blass brick work with 1:3 cement mortar in superstructre including all cost of materials. scaffolding. T&P and labours etc as per PWD SOR ch 6 item no 307+309 | - | cum | - | - | BI01010001010000000000000515BI0100001116 |
| 5 | Providing and laying R.C.C. slab (1:1:5:3) with cement, coarse sand and stone grit (25-10)mm size including all cost of materials T&P and lab our etc SI No. 284b | 1 | cum | - | - | BI01010001010000000000000515BI0100001117 |
| 6 | P/L Cement concreate Bed block & Wearing Coat 1:2:4 in slab all cost of materials. T&P and Lab our etc SI No. 279 a | 1 | cum | - | - | BI01010001010000000000000515BI0100001118 |
| 7 | Providing Cutting, Bending, Binding, Placing of reinforcement including all cost of material T&P and labour etc SI No 504 | 1 | Qtl | - | - | BI01010001010000000000000515BI0100001119 |
| 8 | Struck Deep pointing in 1:*2 cm, including cost of all materials and lab ours T&P etc SI No. 574 | 1 | M2 | - | - | BI01010001010000000000000515BI0100001120 |
| 9 | Supplying and Fixing Drainage Pipe 110 mm i/c 12.5% cp | - | RM | 0.6 | - | BI01010001010000000000000515BI0100001121 |
| 10 | Class M-150 Brick Ballast 40mm gauge i/c 12.5% CP | 1 | cum | - | - | BI01010001010000000000000515BI0100001122 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.01 MB
sbd.pdf
Tender Documents • 2.01 MB
BOQ_2127899.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid