Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | h1₹44.8 LAccepted-AOC | ₹44.8 L Quoted ₹45 L | h1 | Accepted-AOC AOC |
| 2 | H2₹46 LRejected-Finance | ₹46 L | H2 | Rejected-Finance Highest |
| Sl No | Description | Qty | Unit | GOVERDHAN SINGH H2 | Satya Prakash H1 |
|---|---|---|---|---|---|
| 2.00Description | |||||
| 3.00Lifting and supplying of water for different localities by operating valves etc. for 24 months including repairing of pump, rewinding of motors i/c repair of all electric items of panel board, minor and major welding of rising main, common header ,distribution lines, providing grease, gland dori , P/F of G.I union , elbow, tee, wheel valve of various dia, cleaning and white washing of civil structures such as storage tank, sump well filter bed etc. once in year for smooth functioning of scheme for stage I&II . The time schedule shall be as directed by the Engineer-in-Charges complete in all respect).The techn ical details of the scheme are given below:- | |||||
| 4.00 | Pumping Machinery | 1 | Job | 45,00,000 ₹45,00,000 Lowest | 46,00,000 ₹46,00,000 |
| 5.00i)No. of stages :- Ist stgae 2nd stage. | |||||
| 6.00ii)Location of pump house :- At Chalailly Nallah. At Rapra. | |||||
| 7.00iii) Pump make:- Mather & Platt. Becon FN 8/9 | |||||
| 8.00iv) Model :- CHR -8 stages. Becon. | |||||
| 9.00v) Total head:- 287.92 mtr. 200 mtr. | |||||
| 10.00vi) Discharge:- 6 LPS LPS 3 LPS | |||||
| 11.00vii) H.P. 80 HP 30 HP | |||||
Tender Value
₹45.3 L
EMD Value
₹91,000
Closing Date
1 Dec 2025, 11:00 amClosed
EE JAl Shakti Shimla Rural Division at Sunni
EE JAl Shakti Shimla Rural Division at Sunni
lifting and supplying of water for different localities by operating valves etc. for 24 months
2025_HPIPH_120884_1
SNN-SML-003-740-Tdr-25-63-73 dt 17.11.25
Open Tender
Civil Works - Water Works
Item Rate
730 days
Suni
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,500
EE Suni
₹91,000
24 Jun 2026
18 Nov 2025
1 Dec 2025
18 Nov 2025
1 Dec 2025
18 Nov 2025
18 Nov 2025 - 1 Dec 2025
Description
Lifting and supplying of water for different localities by operating valves etc. for 24 months including repairing of pump, rewinding of motors i/c repair of all electric items of panel board, minor and major welding of rising main, common header ,distribution lines, providing grease, gland dori , P/F of G.I union , elbow, tee, wheel valve of various dia, cleaning and white washing of civil structures such as storage tank, sump well filter bed etc. once in year for smooth functioning of scheme for stage I&II . The time schedule shall be as directed by the Engineer-in-Charges complete in all respect).The techn ical details of the scheme are given below:-
i)No. of stages :- Ist stgae 2nd stage.
ii)Location of pump house :- At Chalailly Nallah. At Rapra.
iii) Pump make:- Mather & Platt. Becon FN 8/9
iv) Model :- CHR -8 stages. Becon.
v) Total head:- 287.92 mtr. 200 mtr.
vi) Discharge:- 6 LPS LPS 3 LPS
vii) H.P. 80 HP 30 HP
viii) Pumping Hours :- 12 Hours 8 Hours.
ix) Length of rising main :- 1140 Mtrs 585 mtr.
x) Dia :- 1255 mm dia 80 mm
xi) Distribution system
Length :- 62500 Rmt.
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.19 MB
FORM-8.pdf
Tender Documents • 0.67 MB
terms.pdf
Tender Documents • 0.08 MB
BOQ_177209.xls
BOQ • 0.34 MB
FORM6.pdf
Tender Documents • 0.16 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].