Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 01 AGNI AUTOMATION AND SECURITY 01 KUNDAN BHAWAN SHIVAM VIHAR COLONY OPP KIET ENGG COLLEGE MURADNAGAR GHAZIABAD 201206 U P INDIA MURADNAGAR | GHAZIABAD | UTTAR PRADESH | 201206 | Admitted-Finance |
| 2 | Admitted-Finance 863 JOSHI ROAD KAROL BAGH NEW DELHI DELHI 110005 | CENTRAL DELHI | DELHI | 110005 | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Admitted-Finance 1008 A PREMIER ENGINEERING COMPANY PURVI RITHANI MEERUT DELHI ROAD MEERUT UTTAR PRADESH 250103 INDIA | MEERUT | UTTAR PRADESH | 250103 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹25,000
Closing Date
8 Apr 2022, 3:00 pmClosed
EE(SDW)VI
DJB WSTP Keshopur New Delhi
Replacement of ACBs and allied works at 40 MGD Aeration plant at STP Keshopur
2022_DJB_220020_2
NIT NO. 19 (2021-2022) EE(SDW)VI
Open Tender
Miscellaneous Works
Works
45 days
DJB WSTP Keshopur New Delhi
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
As per NIT
₹25,000
Yes
29 Apr 2022
1 Apr 2022
8 Apr 2022
1 Apr 2022
8 Apr 2022
1 Apr 2022
Dismantling the existing complete Incomer ACB of 4000 Amp from the chambers of the main L T Panel including thier cradles and disconnecting the bus bar connections with the main bus bars, disconnecting the outgoing cables etc. Dismantling the ACB in the complete shut down and safe conditions.
Dismantling the existing complete outgoing ACBs of 1250 Amp from the chambers of the main L T Panel including thier cradles and disconnecting the bus bar connections with the main bus bars, disconnecting the outgoing cables etc. Dismantling the ACBs in the complete shut down and safe conditions.
Supply of Air Circuit Breaker, 4 Pole, 415V, AC of Rating 4000 Amperes, MDO type, 75 KA or more with microprocessor release. Make- L&T / Siemens / C&S
Supply of Air Circuit Breaker, 3 Pole, 415V, AC of Rating 1250 Amperes, MDO type, with microprocessor release, 50 KA or more, Make- Make- L&T / Siemens / C&S
Installation of the cradle of the ACB as above at the panel in proper alignment for making the connections after proper cleaning of the chamber for removing any carbon etc. including modification / making mounting arrangement for fixing of new ACBs.
Fixing the ACB in the cradle in proper drawable condition including checking the movement along with making control connections as suitbale for operating the new ACBs
Connecting the bus ducts and the incoming sides of new 4000 Amp ACBs by rearrangement/ modification / extension / addition of Bus Bar lengths in Aluminium construction of similar cross section as per exisitng as required for retrofitting of ACB and making the required joints including bending / cutting / shaping of the bus bars as required including providing of material, other consumables and tools and tackles as per site requirement.
Connecting the main bus bars of the L T panel and the outgoing sides of new 4000 Amp ACBs by rearrangement/ modification / extension / addition of Bus Bar lengths in Aluminium construction of similar cross section as per exisitng as required for retrofitting of ACB and making the required joints including bending / cutting / shaping of the bus bars as required including providing of material, other consumables and tools and tackles as per site requirement.
Connecting the main bus bars of the panel and the incoming sides of new 1250 Amp ACBs by rearrangement/ modification / extension / addition of Bus Bar lengths in Aluminium construction of similar cross section as per exisitng as required for retrofitting of ACB and making the required joints including bending / cutting / shaping of the bus bars as required including providing of material, other consumables and tools and tackles as per site requirement.
Making the outgoing cable connections provisions at outgoing sides of new 1250 Amps ACB by rearrangement/ modification / extension / addition of Bus Bar lengths in Aluminium construction of similar cross section as per exisitng and making required the joints including bending / cutting / shaping of the bus bars as required. Connecting the existing cables to the ACBs after checking and restoration of the end terminations including providing of material, other consumables and tools and tackles as per site requirement.
Dismantling the existing doors of the outgoing 4000 Amp Acbs. Fabrication, supply and fixing of the new door of suitble size and provisions for the operation of the ACBs made with CRCA Sheet duly painted complete with all accessories as required.
Dismantling the existing doors of the outgoing 1250 Amp Acbs. Fabrication, supply and fixing of the new door of suitble size and provisions for the operation of the ACBs made with CRCA Sheet duly painted complete with all accessories as required.
Testing and commissioning of the 4000 ACB for operations first at NO load and then at ON load including operation, testing of charging system etc. as per the satisfaction of the engineer in charge.
Testing and commissioning of the 1250 ACB for operations first at NO load and then at ON load including operation, testing of charging system etc. as per the satisfaction of the engineer in charge.
Premier Engineering Company
BPS Control Servicing Consultancy Pvt. Ltd
TIMEX ENTERPRISES
AGNI AUTOMATION AND SECURITY
Avon Electricals
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .