| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical ok |
| 2 | Accepted-Technical 86 KATRA PURANI BASTI ETA | Accepted-Technical ok |
| 3 | Accepted-Technical | Accepted-Technical OK |
Tender Value
₹10.2 L
EMD Value
₹1.0 L
Closing Date
19 Jun 2026, 5:00 pmClosed
PO DUDA BUDAUN
PO DUDA BUDAUN
REFER TENDER DOCUMENT
2026_SUDA_1157904_8
342/DUDA/26-27Date05062026
Open Tender
Civil Works - Roads
Fixed-rate
90 days
BUDAUN
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,400
PD JILA NAGARIYA GARIBI UNMOOLAN NIDHI BUDAUN
₹1.0 L
23 Jun 2026
8 Jun 2026
20 Jun 2026
8 Jun 2026
19 Jun 2026
8 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Carted Earth work in filling or in embankment in ordinary soil, excavation to be in the regular pits not exceeding 0.5m in depth and earthwork in embankment to be in 20cm. layers, including ramming and dessing the including cartage of 5 klm | - | Cum | 250 | - |
| 2 | Concrete with 4cm(1½"). Gauge brick ballast, fine sand of 1.25 fineness modulous and cement in proportion of 1:4:8 in foundation and under floor, including supply of all material Iabour and T&P etc.required for proper completion of the work. SI No. 275 | - | Cum | 4,131 | - |
| 3 | First class brick work in 1:3 cement and coarse sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work. S.I. No. 307 | 1 | Cum | 5,780 | ₹5,774.22 |
| 4 | 12 mm thick plaster 1:3 cement cousand mortar including supply of all materials, labour and T&P etc. required for proper completion of the work. S.I. No. 583 | - | Sqm | 230 | - |
| 5 | Cement concrete with 2 cm. (1") gauge approved stone, grit approved coarse sand and cement in the proportion of 3:1.5:1 including supply of all materials, labour and T&P etc. required for proper completion of the work. | - | Cum | 8,725 | - |
| 6 | Reinforced Cement concrete with 2 cm. gauge approved stone, grit approved coarse sand and cement in the proportion of 3:1.5:1 including supply of all materials, labour and T&P etc. required for proper completion of the work. SI No. 279(ii) | - | Cum | 9,325 | - |
| 7 | Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in an over ….of all steel and wastage and over lapping & hooks.(S.I.NO.504) | - | QTL | 7,600 | - |
| 8 | Sign board | - | Job | 5,000 | - |
| 9 | Shashan deduction (less 5%) | - | Less | 53,433.07 | - |
stage.html
html • 0.02 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.95 MB
BOQ_2170089.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .