| 1 | Renovation and Repair of work in the cabin of Commissioner Import II at 2nd Floor Old Building New Customs House | Fabricating of customised Plank false ceiling.plank ceilings�usually consist of wood panels which are then joined together with standard commercial false ceiling systems. Marking out the desired height of your ceiling design from the floor along the walls and add wooden struts to support the structure. Then installing the wooden panels and using choice of paints and finishes to complete the look | 316 | Sq Ft | akashs.c091701 | 15 |
| 2 | Renovation and Repair of work in the cabin of Commissioner Import II at 2nd Floor Old Building New Customs House | Supply and commissioning of AC power point 5/15 amp with circuit breaker including modular switches, socket, internal box with face plate . 4 sqmm polycab make wire with PVC conduit of precission make pipe. 1.5 sq mm green earthing wire in the PVC conduit.all complete as per requirement. | 1 | Piece | akashs.c091701 | 15 |
| 3 | Renovation and Repair of work in the cabin of Commissioner Import II at 2nd Floor Old Building New Customs House | Existing partition dismantling for making wall paneling. Dismantling carefully removing all plywood structure and filling in sacks. Throwing out the debis out of site. | 1 | Piece | akashs.c091701 | 15 |
| 4 | Renovation and Repair of work in the cabin of Commissioner Import II at 2nd Floor Old Building New Customs House | Pdg and Fixing of electrical points 5/15 AMP circuit of 2x2.5sqmm including modular switches, socket, internal box with face plate 1.5 SQMM wire green earthing wire in the PVC conduit .all complete with electrical wiring work as per requirement | 1 | Piece | akashs.c091701 | 15 |
| 5 | Renovation and Repair of work in the cabin of Commissioner Import II at 2nd Floor Old Building New Customs House | | 18 | Piece | akashs.c091701 | 15 |
| 6 | Renovation and Repair of work in the cabin of Commissioner Import II at 2nd Floor Old Building New Customs House | | 15 | Piece | akashs.c091701 | 15 |
| 7 | Renovation and Repair of work in the cabin of Commissioner Import II at 2nd Floor Old Building New Customs House | Pdg and fixing customized strip light with concealed LED light. Consisting of row of lamps. This single striplight is wired internally into either 3 or 4 circuits. Lights fixing with concealed wiring work with all eletrical cables, including modular switches and socket etc. | 1 | Piece | akashs.c091701 | 15 |
| 8 | Renovation and Repair of work in the cabin of Commissioner Import II at 2nd Floor Old Building New Customs House | Existing partition remodification work. removing old plywood and applying both sides plywood.12mm thick Plywood applying laminte with good quality adhesive both sides of the partition. finished with BTC lipping in melamine polish from inner side, including fixing & sealing of wooden partition with all complete as per site requirement. Fixing necessary locks, handles etc. Fixing the partition carefully as per requirement and direction. | 1 | Piece | akashs.c091701 | 15 |
| 9 | Renovation and Repair of work in the cabin of Commissioner Import II at 2nd Floor Old Building New Customs House | Existing data cables wires reinstallation .laying of LAN/VAN circuit of CAT6 cable of D-Link make in Aluminium Raceway from server to each LAN port. laying of circuit of RJ6 cable of Polycab make in Aluminium Raceway for Telephone Duct . All wires laying in accurate lining. | 1 | Piece | akashs.c091701 | 15 |
| 10 | Renovation and Repair of work in the cabin of Commissioner Import II at 2nd Floor Old Building New Customs House | Painting Sand papering, cleaning the surface to smooth texture, filling the holes and cracks with putty and sanding them until they are smooth. applying primer and other sealers with lambi patti using necessary tools to full surface in layers, thereafter applying coats of paint finished in approved shade and colour. Roller to be applied on all surface etc. | 1,487 | Sq FT | akashs.c091701 | 15 |