Loading…
Loading…
| # | Company | Offered Item | Amount | Rank |
|---|---|---|---|---|
| 1 | L1₹4.2 L AR and MO to General Pool Residential building GPRA Kaithu, Dormer SIB and Railway Board Building during 2023-24 SH Painting and distempering works. | AR and MO to General Pool Residential building GPRA Kaithu, Dormer SIB and Railway Board Building during 2023-24 SH Painting and distempering works. | L1 | |
| 2 | L2₹4.4 L+₹25,635.11 (6.17%) AR and MO to General Pool Residential building GPRA Kaithu, Dormer SIB and Railway Board Building during 2023-24 SH Painting and distempering works. | AR and MO to General Pool Residential building GPRA Kaithu, Dormer SIB and Railway Board Building during 2023-24 SH Painting and distempering works. | L2 | |
| 3 | L3₹6.3 L+₹2.1 L (51.5%) AR and MO to General Pool Residential building GPRA Kaithu, Dormer SIB and Railway Board Building during 2023-24 SH Painting and distempering works. | AR and MO to General Pool Residential building GPRA Kaithu, Dormer SIB and Railway Board Building during 2023-24 SH Painting and distempering works. | L3 | |
| 4 | L4₹6.4 L+₹2.3 L (55.3%) AR and MO to General Pool Residential building GPRA Kaithu, Dormer SIB and Railway Board Building during 2023-24 SH Painting and distempering works. | AR and MO to General Pool Residential building GPRA Kaithu, Dormer SIB and Railway Board Building during 2023-24 SH Painting and distempering works. | L4 | |
| 5 | L5₹6.8 L+₹2.6 L (63.6%) AR and MO to General Pool Residential building GPRA Kaithu, Dormer SIB and Railway Board Building during 2023-24 SH Painting and distempering works. | AR and MO to General Pool Residential building GPRA Kaithu, Dormer SIB and Railway Board Building during 2023-24 SH Painting and distempering works. | L5 |
| Sl No | Description | Qty | Unit | Kamlesh Kumar Sharma L8 | MOHD SAJID L5 | Sourav Contractor L4 | PARDEEP KUMAR L9 | Vikas Kumar L6 | Vikas Kumar L7 | Nand Kishore L3 | PANKAJ SHARMA L10 | MANU MOHINDRA L1 | MOHD NASIM L2 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Civil Work | - | - | -53.63 ₹7,29,263.77 | -56.81 ₹6,79,251.72 | -58.99 ₹6,44,966.73 | -46.99 ₹8,33,691.45 | -55 ₹7,07,717.7 | -55 ₹7,07,717.7 | -60 ₹6,29,082.4 | 10 ₹17,29,976.6 | -73.6 ₹4,15,194.38 Lowest | -71.97 ₹4,40,829.49 |
Tender Value
₹15.7 L
EMD Value
₹31,454
Closing Date
29 May 2023, 3:00 pmClosed
EE-Shimla-II
Bharat Bhardwaj
EXECUTIVE ENGINEER SHIMLA DIVN-2 CPWD KENNEDY COTTAGE SHIMLA-4
AR and MO to General Pool Residential building GPRA Kaithu, Dormer SIB and Railway Board Building during 2023-24 SH Painting and distempering works.
42255
27/EE/SD-II/AE-III/2023-24
OPEN
Repair and Maintenance
NCB
10 months
Shimla, Himachal Pradesh
10 documents required · 10 mandatory
₹31,454
Not Applicable
29 May 2023
20 May 2023
29 May 2023
29 May 2023
27 May 2023
stage.html
html • 0.08 MB
boq_comp_chart.xls
xls
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
INDEX.pdf
document • 0.19 MB
NIT.pdf
document • 8.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .