| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.7 CrAdmitted-Finance 306 B 2 SOUTH BLOCK BAHU PLAZA JAMMU 180004 | JAMMU | JAMMU | JAMMU AND KASHMIR | 180004 | -40.99% | ₹6.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹9.3 Cr+₹2.6 Cr (38.9%)Admitted-Finance | -18.05% | ₹9.3 Cr+₹2.6 Cr (38.9%) | L2 | Admitted-Finance |
| 3 | L3₹10.1 Cr+₹3.4 Cr (51.2%)Admitted-Finance 0 TRESPONE KARGIL JAMMU KASHMIR 194105 | KARGIL | LADAKH | 194105 | -10.79% | ₹10.1 Cr+₹3.4 Cr (51.2%) | L3 | Admitted-Finance |
| 4 | L4₹11.3 Cr+₹4.6 Cr (69.5%)Admitted-Finance GYAMDU HOUSE OLD ROAD SHANAM LEH LADHAKH UT PIN 194101 | LEH LADAKH | LADAKH | 194101 | +0.00% | ₹11.3 Cr+₹4.6 Cr (69.5%) | L4 | Admitted-Finance |
| 5 | L5₹12.0 Cr+₹5.3 Cr (79.4%)Admitted-Finance | +5.89% | ₹12.0 Cr+₹5.3 Cr (79.4%) | L5 | Admitted-Finance |
Tender Value
₹11.3 Cr
EMD Value
₹26.7 L
Closing Date
10 Apr 2026, 4:00 pmClosed
Executive Engineer Construction Division Leh
Office of the Executive Engineer Construction Division Leh
Widening and up gradation of Hemis Chomoling Habitation road (Under CRIF)
2026_PWD_18589_1
CDL 178 of Leh of 2025-26
Open Tender
Civil Works - Roads
Percentage
1095 days
leh
Please refer Tender documents.
3 documents required · 3 mandatory
₹13,400
Executive Engineer Construction Division Leh
₹26.7 L
Chief Engineer PWD (RnB) Department UT Ladakh
18 Apr 2026
10 Mar 2026
13 Apr 2026
11 Mar 2026
10 Apr 2026
11 Mar 2026
16 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. a) All Kinds of Soil | 6,209.26 | Cum | 208.42 | ₹12,94,133.97 |
| - | b) Ordinary Rock | 3,656.49 | Cum | 383.89 | ₹14,03,689.95 |
| - | c) Hard Rock (requiring blasting) | 2,437.79 | Cum | 781.55 | ₹19,05,254.77 |
| - | Earth work in excavation by mechanical means (Hydraulic excavator) in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All Kinds of Soil | 2,785.25 | Cum | 278.09 | ₹7,74,550.17 |
| - | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 2,123.38 | Cum | 220.41 | ₹4,68,014.19 |
| - | Scarifying metalled (water-bound) road surface including disposal of rubbish lead upto 50m and consolidation of the aggregate received from scarifying with power road roller of 8 to 10 tonne capacity. | 9,592.5 | Sqm | 24.24 | ₹2,32,522.2 |
| - | Extra for compaction of earth work in embankment under optimum moisture conditions to give at least 95% of the maximum dry density | 6,030.95 | Cum | 18.43 | ₹1,11,150.41 |
| - | Construction of granular sub-base by providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions ofEngineer-in-Charge.With material conforming to Grade-I (size range 75 mm to 0.075 mm) having CBR Value-30 | 2,276.63 | Cum | 1,852.15 | ₹42,16,660.25 |
| - | Providing, laying, spreading and compacting graded stone aggregate (size range 53 mm to 0.075 mm ) to wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, for all leads & lifts, laying in uniform layers with mechanical paver finisher in sub- base / base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge | 2,095.14 | Cum | 1,825.12 | ₹38,23,881.92 |
| - | Providing and applying tack coat using bitumen emulsion conforming to IS:8887 using emulsion pressure distributer including preparing the surface and cleaning with mehanical broom. With rapid setting bitumen emulsion On W.B.M. /W.M.M. @ 0.4 Kg/sqm. | 27,935.25 | Sqm | 52.3 | ₹14,61,013.58 |
stage.html
html • 0.03 MB
techsummary_44594.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.20 MB
BOQ_44594.xls
BOQ • 0.30 MB
ExtendedCRIF.pdf
PDF • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .