Installation of Shed for garbage disposal plant in Panjab University Campus, Chandigarh
2026_PU_95434_1
6904/EE/Mtc.
Open Tender
Civil Works
Percentage
150 days
P.U. Campus Sector-14
As per NIT
2 documents required · 2 mandatory
₹0
₹50,000
14 Sept 2026
14 Sept 2026
9 Oct 2026
14 Sept 2026
8 Oct 2026
14 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. | |||||
| 1.01 | All kinds of soil (Ref:- 2.6.1) | 101.3 | Cum | 171 | ₹17,322.37 |
| 2Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : | |||||
| 2.01 | 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) (Ref:- 5.1.2) | 46.17 | Cum | 8,946 | ₹4,13,047.56 |
| 3Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. | |||||
| 3.01 | Thermo-Mechanically Treated bars (75Kg per Cum x RCC=46.17Cum) (Ref:- 5.22.6) | 2,770 | Kg | 102 | ₹2,82,540 |
| 4 | Prividing and fixing Bolts including nuts and washers Complete.(4 Bolts for each PAD of 20mm dia) (Ref:- 10.20) | 90 | Kg | 225 | ₹20,250 |
| 5Steel work in built up tubular ( round, square or rectanglar hollow tubes etc. ) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. it also includes Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position In gratings, frames, guard bar, ladder, railings, brackets, gates and similar workscomplete. | |||||
| 5.01 | Hot finished seamless type tubes (Ref:- 10.16.2) | 10,745 | Kg | 125 | ₹13,43,125 |
| 6Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete. | |||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 7.31 MB
BOQ_117221.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .