Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹9.0 LAccepted-AOC SHUKIA MORE MORWA DISTT SINGRAULI MP | MORWA | SINGRAULI | MP | L-1 | Accepted-AOC on resultant L-1 basis in OTE |
Tender Value
₹9.0 L
EMD Value
₹11,200
Closing Date
13 Nov 2023, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GENERAL MANAGER (EXCV)
GM(Excv) Nigahi Area NCL, PO Nigahi, Dist Singrauli, MP-486884
Repairing of 05 nos. Rotor and 05 nos. Hub of crowd/swing/propel Brake system and repairing of 02 nos. Rotor of Hoist Brake system of 182M Marion Shovel at Nigahi Project.
2023_NCL_292194_1
NGH/EXCV/TENDERS/23-24/056
Open Tender
Excavation Department Work
Item Rate
20 days
Nigahi Project
As per NIT
4 documents required · 4 mandatory
₹11,200
2 Mar 2024
28 Oct 2023
14 Nov 2023
28 Oct 2023
13 Nov 2023
29 Oct 2023
28 Oct 2023 - 1 Nov 2023
Amount
Scope of Work: Repairing of 05 nos. Rotor and 05 nos. Hub of crowd/swing/propel brakes system and repairing of 02 nos. Rotor of Hoist Brake system of 182M Marion Shovel at Nigahi Project.
Repairing of 02 nos. Rotor of hoist brake system :
Cost/Charges for undercutting on heavy duty lathe machine for 64 Hrs. each rotor assembly. Total for 02 Nos. Rotor hoist brake system repair work.
Cost/ charges for rebuilding of Rotor of hoist brake system including labour charges, contractor profit etc. (labour consisting of Skilled Fitter, Skilled Welder and Semi skilled Helper manpower). Total for 02 Nos. rotor of hoist brake system repair work.
Cost of welding electrode 660NH (size -4mm)- 10Kg.for each Rotor assembly for 02 Nos. rotor hoist brake system. Repair work
Charges for machining of rebuilded portion on heavy duty lathe machine for 64 Hrs. each rotor assembly. Total for 02 Nos. rotor hoist brake system repair work.
Charges for teeth cutting on gear milling machine for 80 Hrs. for each rotor assembly. Total for 02 Nos. rotor of hoist brake system repair work
Charges for DP Test (after root layer & every 2-3 layer) for 04 nos. position for each rotor assembly. Total for 02 Nos. rotor hoist brake system repair work.
Repairing of 05 nos.Rotor of crowd / swing/propel brake system :
Cost/ Charges for undercutting on heavy duty lathe machine for 32 Hrs. each rotor assembly. Total for 05 Nos. rotor of crowd / swing/propel brake system repair work.
Cost/ charges for rebuilding of rotor of crowd /swing/propel brake system including labour charges, contractor profit etc. (labour consisting of Skilled Fitter, Skilled Welder and Semi skilled Helper manpower). Total for 05 Nos. rotor of crowd / swing/propel brake system repair work..
Cost of welding electrode 660NH ( size -4mm) for 06Kg. Each rotor assembly. Total for 05 Nos. rotor of crowd / swing/propel brake system repair work.
Charges for machining of rebuilded portion on heavy duty lathe machine for 32 Hrs. each rotor assembly. Total for 05 Nos. rotor of crowd / swing/propel brake system repair work..
Charges for teeth cutting on gear milling machine for 48 Hrs. each rotor assembly. Total for 05 Nos. rotor of crowd / swing/propel brake system repair work.
Charges for DP Test ( after root layer & every 2-3 layer) for 04 nos. location for each rotor assembly. Total for 05 Nos. rotor of crowd / swing/propel brake system.
Repairing of 05 nos. Hub of Crowd/swing/propel brake system :
Charges for undercutting on heavy duty lathe machine for 48 Hrs. each hub assembly. Total for 05 Nos. Hub of crowd / swing/propel brake system repair woirk.
Cost/ charges for rebuilding of Hub of crowd / swing/propel brake system including labour charges, contractor profit etc. (labour consisting of Skilled Fitter, Skilled Welder and Semi skilled Helper manpower). Total for 05 Nos. Hub of crowd / swing/propel brake system repair work.
Cost of welding electrode 660NH ( size -4mm) for 8 Kg. for repair of each rotor assembly. Total for 05 Nos. Hub of crowd / swing/propel brake system repair work
Charges for machining of rebuilded portion on heavy duty lathe machine for 64 Hrs. each Hub assembly. Total for 05 Nos. Hub of crowd / swing/propel brake system repair work.
Charges for teeth cutting in gear milling machine for 80 Hrs. each Hub assembly. Total for 05 Nos. Hub of crowd / swing/propel brake system repair work.
Charges for DP Test ( after root layer & every 2-3 layer) for 04 location in each Hub assembly. Total for 05 Nos. Hub of crowd / swing/propel brake system.
Total impact of GST for the purpose of CTC
techsummary_302665.pdf
PDF • 0.22 MB
finsummary_302665.pdf
PDF • 0.22 MB
EWO167.pdf
PDF • 4.61 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .