Tender Value
₹2.6 L
EMD Value
₹5,200
Closing Date
13 Feb 2026, 1:30 pmClosed
PRADHAN PGSD-I
NIGALAY ,PO MIRIK,PS-MIRIK
Construction of water reservoir tank at 9no Gaon (2nd call)
2026_GTA_987820_6
05/PRA/PGSD-I/15THFC/T/25-26
Open Tender
CIVIL WORKS
9NO OKAYTI
Please refer Tender documents.
4 documents required · 4 mandatory
₹500
₹5,200
22 Feb 2026
6 Feb 2026
17 Feb 2026
6 Feb 2026
13 Feb 2026
6 Feb 2026
Earth work in excavation of foundation trenches or drains in all sorts of soil (including mixed soil but excluding laterite or sand stone) including removing, spreading or stacking the spoils within a lead of 75m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete (a) Depth of excavation not exceeding 1.500 mm.
Laying 150 mm. to 200 mm. boulder soling including rough dressing hand packing and ramming down small pieces in the interstics without rolling but including ramming.
Cost of stone boulder 150 mm size delivered ans stacked at site.
Ordinary cement concrete (mix 1:2:4) with graded stone chips (20mm nominal size) excluding shuttering and reinforcement, if any, in ground floor as per relevant codes. (ii) River bazree
Plum Concrete work with 40 % Cement Concrete with 30 mm down graded stone metal and 60% stone boulder of size 150 mm and above, placed in position as directed excluding shuttering if any.(i) (1:3:6) proportion.
Ordinary cement concrete (mix 1:1.5:3) with graded stone chips (20mm nominal size) excluding shuttering and reinforcement, if any, in ground floor as per relevant codes. (ii) River bazree
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc. initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at inter-section, complete as per drawing and direction. (a) For works in foundation, basement and up to roof of ground floor/up to 4m. Tor steel/Mild steel. Other SAIL/TATA/RINL/JSW/JSPL/Shyam/SRMB/ISSL/BMASL/Electrosteel
Hire and labour charge for shuttering with centreing and necessary staging up to 4 m. using approved stout props and thick hard wood planks of approved thick ness with required bracing for concrete slabs, beams, columns, lintels curved or staight including fitting fixing and striking out after complection of works. (up to roof of ground floor). (a) 25 mm. to 30 mm. thick wooden shuttering as per decision & direction of the Engineer-in-charge. .
Plaster ( to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering conrners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (ground floor). [Excluding cost of chipping over concrete surface].(ii) With 1:4 cement mortar(b) 15 mm. thick plaster
Neat cement punning about 1.5 mm thick in wall,dado,windowsill,floor etc. NOTE:CEMENT 0.152 CU.M PER 100 sq. M
Citizen information board
Add 18 % GST on Total Amount
Add 1%labour cess on (Total Amount + GST)
Please Enable Macros to View BoQ information
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.48 MB
BOQ_2413284.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid