Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.4 LAdmitted-Finance | -12.56% | ₹4.4 L | L1 | Admitted-Finance |
| 2 | L2₹4.7 L+₹33,939.55 (7.77%)Admitted-Finance NAWABHAT G T ROAD PO FAGUPUR BURDWAN | BURDWAN | PURBA BARDHAMAN | WEST BENGAL | -5.77% | ₹4.7 L+₹33,939.55 (7.77%) | L2 | Admitted-Finance |
| 3 | L3₹5.2 L+₹87,772.98 (20.1%)Admitted-Finance | +5.00% | ₹5.2 L+₹87,772.98 (20.1%) | L3 | Admitted-Finance |
Tender Value
₹5 L
EMD Value
₹10,000
Closing Date
14 Aug 2026, 6:00 pmClosed
Executive Engineer PWD Dn., Bali
Office of the Executive Engineer PWD Dn., Bali
Ordinary Repair Work of Sadri to Parsuram Mahadev Road
2026_CEPWD_582165_11
NIT No. 06 of 2026-27 PWD Division, Bali
Open Tender
Civil Works - Roads
Percentage
30 days
Bali
Please refer Tender documents.
4 documents required · 4 mandatory
₹500
18937-XEn PWD Dn. Bali/MD RISL Jaipur egras chalan
₹10,000
Yes
18 Aug 2026
5 Aug 2026
16 Aug 2026
5 Aug 2026
14 Aug 2026
5 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. By Mechanical Means In area of non-thorny jungle | - | Hect | 10,374 | - |
| 2 | Granular Sub-base with Well Graded Material (Table 400-1) Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per MoRTH Specification Clause 401. For Grading III Material | - | Cum | 407 | - |
| 100 | Add 18% GST on Construction Cost | - | Total | 1 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.87 MB
Tendernotice_2.pdf
PDF • 7.42 MB
Tendernotice_3.pdf
PDF • 24.68 MB
Tendernotice_4.pdf
PDF • 30.29 MB
Tendernotice_5.pdf
PDF • 1.04 MB
BOQ_1034381.xls
BOQ • 0.23 MB
Date-Extension-Bali-06.pdf
PDF • 0.14 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .