Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.4 LAccepted-Finance 1380 DNP DUMKA JHARKHAND | DUMKA | JHARKHAND | 814101 | L1 | Accepted-Finance L1 | |
| 2 | L2₹21.9 L+₹53,407.93 (2.50%)Rejected-Finance | L2 | Rejected-Finance L2 |
Tender Value
₹22.1 L
EMD Value
₹44,300
Closing Date
28 Jul 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE OFFICER, NAGAR PARISHAD DUMKA
EXECUTIVE OFFICER, NAGAR PARISHAD DUMKA
Construction of RCC drain from Pradip Pandit house towards Main Nala ward no 08
2026_UDD_116232_1
UDD/DNP/03/2026-27 (2ND CALL) GR 16
Open Tender
Civil Works
Percentage
90 days
NAGAR PARISHAD DUMKA
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
₹44,300
7 Nov 2026
17 Jul 2026
29 Jul 2026
17 Jul 2026
28 Jul 2026
17 Jul 2026
180 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation trench in Hard soil (Vide classification of Soil item B) and disposal of excavated earth as obtained to a distance upto 50 M. including all lifts, levelling, ramming the foundation trenches, removing roots of trees, shurbs all complete as per approved design, building specification and direction of E/I.(5.1.1) | 307.89 | M3 | 151.82 | ₹46,743.86 |
| 2 | Providing coarse clean sand filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials, labour, royalty and taxes all complete as per building specification and direction of E/I. ( 5.1.10) | 25.66 | M3 | 589.51 | ₹15,126.83 |
| 3 | Providing designation 75B one B/F/Soling joints filled with local sand including cost of watering taxes royalty all complete as per building specification and direction of E/I. (5.6.3) | - | M2 | 330.34 | - |
| 4 | P/V and laying in position specification grade of RCC M-200 excluding the cost of centering ,shuttering , finishing and reinforcement all work plinth level in bed 5.3.9 BCD | 33.17 | M3 | 5,218 | ₹1,73,081.06 |
| 5 | Providing R.C.C. M-200 nominal mix of (1:1.5:3) in various component of canal structure with approved quality of stone chips 20mm to 6mm size graded and clean coarse sand of F.M 2.5 to 3 including screening, shuttering, mixing cement concrete in mixer and placing in position, vibrating, striking, curing, taxes and royalty all complete as per building specification and direction of E/I. (5.3.10) wall | 39.73 | M3 | 6,082.45 | ₹2,41,655.74 |
| 6 | Centaring and Shuttering including struting,Proping etc.and removal of from for Foundation, Footing, based of columns,etc for mas concrete do-do E/I (5.3.17.2)BCD | 686 | M3 | 372.72 | ₹2,55,685.92 |
| 7 | Providing 12mm cement plaster (1:3) with clean coarse sand of F.M 1.5 including screening, curing with all leads and lilftsof water. Scaffolding taxes and royalty all complete as per specification and direction of E/I. (5.7.1) | 504.41 | M2 | 180.6 | ₹91,096.45 |
| 8 | Providing 1.5 mm cement punning including curing ,carriage of water with all leads and lifts as per building specification and Direction of E/I | 310.41 | M2 | 54.43 | ₹16,895.62 |
| 9 | Providing and laying R.C.C M-200 with nominal mix of (1:11/2:3) in deck slab BEAMS, Suspended floors roofs having slop up to 15° landings, balconies ,shelves, chajjas, lintel ,bands plain window sills, staircases and spiral stair cases above plinth level up to floor, excluding the cost of centering , shuttering , finishing and reinforcement , job as per specification and direction of E/I. (5.3.11) | 26.06 | M3 | 6,308.87 | ₹1,64,409.15 |
| 10 | Providing TMT bar reinforcement (tor) steel) as per approved design drawing, removal of rust, cutting, bending, including supplying annealed wire, placing M.S rods in position all complete job as per specification and direction of E/I.( 5.5.5) 10MM | 1 | MT | 82,096.54 | ₹82,014.44 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_157109.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.44 MB
BOQ_157109.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .