| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.0 LAdmitted-Finance | -0.02% | ₹3.0 L | L1 | Admitted-Finance |
| 2 | L2₹3.0 L+₹3,498.27 (1.17%)Admitted-Finance BROOKSHABAD ROAD CARBYN S CHOWK 1 PORT BLAIR ANDAMAN PORT BLAIR SOUTH ANDAMAN ANDAMAN NICOBAR 744111 | 744111 | +1.15% | ₹3.0 L+₹3,498.27 (1.17%) | L2 | Admitted-Finance |
| 3 | L3₹3.0 L+₹5,680.95 (1.90%)Admitted-Finance | +1.88% | ₹3.0 L+₹5,680.95 (1.90%) | L3 | Admitted-Finance |
Tender Value
₹3.0 L
EMD Value
₹6,000
Closing Date
12 Sept 2026, 2:00 pmClosed
EE,W/S,GRWW
OFFICE OF THE EXECUTIVE ENGINEER (WATER SUPPLY) GARDEN REACH WATER WORKS, BIDHANGARH, KOL-66
REPAIRING OF TWO NOS LEAKY PORTION ON PSC PRIMARY GRID INCLUDING ONE MS CLEAT ON 1600 MM SS LINE ALONGWITH TWO NOS. CI SERVICE LINE OF 150 MM AND 100 MM DIA NEAR VESIVIOUS INDIA LTD. AND TRACTOR IND. LTD. WITH ANCILLARY WORKS.
2026_KMC_1039991_1
EEWS/KMC/GRWW/26-27/61
Open Tender
MECHANICAL
Percentage
15 days
ON TARATALA ROAD
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹6,000
14 Sept 2026
1 Sept 2026
14 Sept 2026
1 Sept 2026
12 Sept 2026
1 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches levelling, dressing and
ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm | - | CUBIC METER PERCENT | 119.27 | - |
| 2 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches levelling, dressing and ramming the bottom, bailing out water as required complete (b) Depth of excavation for additional depth beyond 1,500 mm. and upto 3,000 mm. but not requiring shoring | 0.92 | CUBIC METER PERCENT | 192.38 | ₹176.99 |
| 3 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches levelling, dressing and
ramming the bottom, bailing out water as required complete (c)Depth of excavation for additional depth
beyond 3000 mm. upto 4000mm. excluding cost of shoring as necessary. | 1 | CUBIC METER PERCENT | 234.7 | ₹234.7 |
| 4 | Hire and labour charges for shoring work (including necessary close plank walling, framing, Eucalyptus/Jhou bulla piling, strutting etc) complete as
per direction of the Engineer-in charge for foundation excavation (vertical surface are in contact with supported earth is to be measured.) (This item should be executed on specific direction of the Enginner in charge).(a) Depth upto 1.5 m. | 46.65 | SQUARE METER | 386 | ₹18,006.9 |
| 5 | Hire and labour charges for shoring work (including necessary close plank walling, framing, Eucalyptus/Jhou bulla piling, strutting etc) complete as
per direction of the Engineer-in charge for foundation excavation (vertical surface are in contact with supported earth is to be measured.) (This item should be executed on specific direction of the Enginner in charge).(b) Depth upto 1.5 m. upto 3.0 m | 0.2 | SQUARE METER | 439 | ₹87.8 |
| 6 | Hire and labour charges for shoringwork (including necessary close plank walling, framing, Eucalyptus/Jhou bulla piling, strutting etc) complete as
per direction of the Engineer-in charge for foundation excavation (vertical surface are in contact with supported earth is to be measured.) (This item should be executed on specific direction of the Enginner in charge)(c) For additional depth beyond 3.00 m. | - | SQUARE METER | 498 | - |
| 7 | Hire and labour charges for 100 mm dia bamboo railing on 150 mm dia Jhau/Eucalyptus or other approved timber posts each 2.0 m in length, tied 2 number post strongly with coir ropes in the fashion of a scissor with a spacing of 1.8 m over pacca road without damaging the surface and tying strongly 3 (three) rows of bamboo railing on each leg and 1 (one) railing connecting all the pivot junctions including cost of loading unloading, stacking & carriage of all materials and labour complete, and maintaining barricading for a period beyond 5 (five) days after the reported & recorded time of completion of the entire work to the satisfaction of Engineer-in- Charge. (Note: This work should not be executed without specific permission of Superintending Engineer). (100 mm. dia bamboo railing & 150mm. dia Jhau/Eucalyptus/other approved timber posts @ 1.80m apart). (ii) Railing 3 row on each leg and 1 at pivot point. | 44 | METER | 178 | ₹7,832 |
| 8 | Sealing of uneven gap in PSC Socket/spigot joint by insertion of 19 mm thick asbestos graphite packing (AMP-32) including supplying. fitting and fixing all complete | 1 | METER | 870 | ₹869.13 |
| 9 | Cutting to requisite length or shape departmental R.S.Joists, channels, angles, tees, plates etc. (Payment to be made on area of cut surface) | 2,251.83 | SQUARE CENTIMETER | 8 | ₹18,014.64 |
| 10 | Welding in M.S.structural work with gas or electric: (a) Tack weld | 105 | POINT | 9 | ₹945 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.29 MB
tbid.pdf
Tender Documents • 0.61 MB
OIDDETAILS.pdf
Additional Documents • 0.68 MB
BOQ_2553960.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .