Loading…
Loading…
Tender Value
₹29.3 L
EMD Value
₹2.9 L
Closing Date
14 Jul 2026, 5:00 pm6d left
EO
EO NP BHAGWANT NAGAR
Construction of C.C. road and drain from Teeno Shivala to Amrit lal house in ward no 6 at Nagar Panchayat Bhagwant Nagar.
2026_DOLBU_1162777_3
932/CMNSY/26-27
Open Tender
Civil Works
180 days
BHAGWANT NAGAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,197
EO
₹2.9 L
22 Jun 2026
22 Jun 2026
15 Jul 2026
22 Jun 2026
14 Jul 2026
22 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth Work in Excavation for foundations in (silty,garbege, panni) soil including dressing and ramming of bottom and disposal of surplus excavated earth as directed by Engg.-In-Ch.SI 251 | 103.2 | M3 | 135 | ₹13,932 |
| 2 | Providing and laying P.C.C. 1:4:8 (cement,finesand, 40mm gauge b/ballast) etc all complet. SI 275 | 41.28 | M3 | 3,608 | ₹1,48,938.24 |
| 3 | M-150 class Brick work 1:3 including all amterial labour, T&P etc. comple in all respect. In foundation | 82.8 | M3 | 5,510 | ₹4,56,228 |
| 4 | 12/15 mm thick Plaster with 1:3 mix (cement& C/sand mortor) etc all complet . SI 587(3) | 360 | M2 | 190 | ₹68,400 |
| 5 | Pro & Laying of C.C. work with 1:2:4 cement, coarse sand and 20 mm guage approved stone grite over drain etc all complet.si (279b) | 13.68 | M3 | 7,185 | ₹98,290.8 |
| 6 | R.C.C. work with 1:2:4 cement, coarse sand and 20 mm guage approved stone grit to cover the crossing over drain etc all complet.SI NO.284 | 39.37 | M3 | 8,315 | ₹3,27,344.92 |
| 7 | M.S. Iron work for R.C.C. cover with cutting and bindining etc all complet.SI NO 504 | 30.9 | Qt | 6,700 | ₹2,07,056 |
| 8 | S/L/R/C of G-3 stone grite with water and dust 22.4-53 mm gauge consolidation including road roller 8-10 K-N etc all complet. | 120 | M3 | 4,000 | ₹4,80,000 |
| 9 | Providing and laying of C.C. road with 1:2:4 cement, coarse sand and 20 mm s/grite on prepair surface etc all complet. | 150 | M3 | 7,250 | ₹10,87,500 |
| 10 | Head loading of material 3 chain loading unloading etc all complete | 447.13 | M3 | 90 | ₹40,241.5 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.63 MB
BOQ_2179704.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid