Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.4 LAccepted-AOC | ₹22.4 L Quoted ₹19.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹19.1 LRejected-Finance | ₹19.1 L | L2 | Rejected-Finance L2 |
| 3 | L3₹20.7 LRejected-Finance 4 C 13 SIDCO INDUSTRIAL ESTATE METTUR DAM 636 402 SALEM DT | SALEM | TAMIL NADU | 636402 | ₹20.7 L | L3 | Rejected-Finance L3 |
| 4 | L4₹24.1 LRejected-Finance 07 THALAIYUR KARUPPUREDDIYUR PO PN PATTY METTUR DAM 636 404 | SALEM | TAMIL NADU | 636404 | ₹24.1 L | L4 | Rejected-Finance L4 |
| 5 | Rejected-Technical 5 151 B DR SUBRAYAN NAGAR EAST MAIN ROAD METTUR DAM 636401 | METTUR DAM | SALEM | TAMIL NADU | 636401 | - | - | Rejected-Technical Technical Bid not Satisfied |
| Sl No | Description | Qty | Unit | VASAN ENGINEERING L2 | metturassociates L3 | ASS&CO L1 | PMP&CO L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Charges for Cleaning & Clearing the spilled Red hot bottom ash from DRYCON screw conveyor, surrounding bottom ash hoppers area and Crusher house area, transporting the ash to upper ash dyke by using the contractors vehicles of JCB & Tractors and unloading the same & return., including the charges of consumables, Personal Protective equipments, JCB, Vehicle and other T&P’s required as per the direction of the engineer in charge. | 11,500 | MT | 166 ₹19.1 L | 179.95 ₹20.7 L | 165 ₹19.0 L | 209.9 ₹24.1 L |
Tender Value
Refer Docs
EMD Value
₹38,200
Closing Date
20 Jan 2026, 2:00 pmClosed
CE/MTPS-II
O/o CE MTPS II
Cleaning and Clearing the spilled Red hot bottom ash from DRYCON screw conveyor surrounding bottom ash hoppers area and Crusher house area transporting the ash to upper ash dyke by using the contractors vehicles of JCB and Tractors
2026_EB_639744_1
OT 216 Red hot
Open Tender
Maintenance Works
SE/M-I/MTPS-II
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹38,200
Yes
26 May 2026
6 Jan 2026
21 Jan 2026
6 Jan 2026
20 Jan 2026
6 Jan 2026
Charges for Cleaning & Clearing the spilled Red hot bottom ash from DRYCON screw conveyor, surrounding bottom ash hoppers area and Crusher house area, transporting the ash to upper ash dyke by using the contractors vehicles of JCB & Tractors and unloading the same & return., including the charges of consumables, Personal Protective equipments, JCB, Vehicle and other T&P’s required as per the direction of the engineer in charge.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.63 MB
BOQ_765928.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid