Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.9 LAccepted-AOC BIBIPUR JATTAN BRANCH POST OFFICE 132041 | KARNAL | HARYANA | 132041 | ₹30.9 L Quoted ₹32.2 L | L1 | Accepted-AOC wa |
| 2 | L2₹33.2 L+₹94,405.73 (2.93%)Rejected-AOC PRESIDENT RAJESH KUMAR R O VPO CHUHARMAJRA DISTT KAITHAL | ₹33.2 L+₹94,405.73 (2.93%) | L2 | Rejected-AOC wna |
| 3 | Not Admitted-Fee/PreQual/Technical H NO 446 NEAR RADHEY KRISHAN MANDIR VPO DAHAR 132145 | PANIPAT | HARYANA | 132145 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical VILLAGE BIBIPUR JATTAN 65 BIBIPUR JATTAN INDRI KARNAL HARYANA 132041 | KARNAL | KARNAL | HARYANA | 132041 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹32.6 L
EMD Value
₹65,100
Closing Date
23 Feb 2026, 3:00 pmClosed
DHARAM VIR
DIV Karnal
Removal, re-laying and fixing of interlocking tiles, thermoplastic paints and road furniture etc. complete in all respect
2026_HBC_502595_1
2026D988D12E 6F33 493C 8558 B18FA74B91E4240HSV
Open Tender
Civil Works
Works
60 days
Karnal
2 documents required · 2 mandatory
₹1,000
₹65,100
Yes
23 May 2026
14 Feb 2026
24 Feb 2026
14 Feb 2026
23 Feb 2026
14 Feb 2026
[17.26.2]Tack Coat 2. Providing and applying tack coat with penetration grade bitumen VG - 10 using bitumen pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous/ granular surface cleaned with mechanical broom as per technical clause 503 of MORT&H specifications [Through Rate]
[17.31.2]Bituminous Concrete with Batch type HMP 2. Bituminous Concrete 30 mm to 45 mm thickness (grading II) with 100-120 TPH batch type HMP Providing and laying 30mm - 45 mm bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder VG - 30 @ 5.4% per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction complete as per technical clause 507 of per MORTH specifications Note-If bitumen required is more than 5.4% as per job mix formula, no extra payment will be paid. Extra bitumen required will be considered as incidental to work. [Through Rate]
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.90 MB
BOQ_581271.xls
BOQ • 0.32 MB
CO2.pdf
PDF • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .