Loading…
Loading…
Tender Value
₹35 L
EMD Value
₹70,000
Closing Date
9 Oct 2026, 6:00 pm
GE CHANDIGARH
GE CHANDIGARH, HQ N area Chandigarh.
REPAIR TO ROOF TREATMENT, CHAJJAS, BEAMS, BALCONIES, RCC SLABS, MUMTY ROOFS, PVC RAIN WATER PIPES IN PCDA OFFICE BLDG SECTOR-09 UNDER GE CHANDIGARH.
2026_MES_789993_1
GE/CHD/T-62/2026-27
Open Tender
Civil Works
Item Rate
180 days
CHANDIGARH
class D and category a(i) for contractor enlisted in MES.
8 documents required · 8 mandatory
₹500
GE CHANDIGARH
₹70,000
Yes
18 Sept 2026
18 Sept 2026
12 Oct 2026
18 Sept 2026
9 Oct 2026
2 Oct 2026
18 Sept 2026 - 25 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Taking down Cement plaster or cement lime plaster on brick or stone walls including raking out joints, hacking for key & scrubbing down with water etc complete including disposal of unservicable rubbish off the premises complete all as specified and directed by Engineer-in-Charge.
Note:- Debris will be disposed as per UT norms and Contractor will laise with UT athority for the same and rates quoted shall be deemed to include this aspect. | 30 | SQUARE METRE | 100 | ₹3,000 |
| 2 | Taking down steel tubing and connections of 15 mm bore in pipe with all fittings from walls,ceilings and floors and removal from site complete including disposal of unservicable rubbish off the premises complete all as specified and directed by Engineer-in-Charge.
Note:- Debris will be disposed as per UT norms and Contractor will laise with UT athority for the same and rates quoted shall be deemed to include this aspect. | 20 | RUNNING METRE | 100 | ₹2,000 |
| 3 | Taking down steel tubing and connections of 20 mm bore in pipe with all fittings from walls,ceilings and floors and removal from site complete including disposal of unservicable rubbish off the premises complete all as specified and directed by Engineer-in-Charge.
Note:- Debris will be disposed as per UT norms and Contractor will laise with UT athority for the same and rates quoted shall be deemed to include this aspect. | 20 | RUNNING METRE | 10 | ₹200 |
| 4 | Taking down chowkhats with shutters (without taking off shutter from frame) n exc 1.5 Sqm each with mongry including Cutting holes into through brick wall and making good to dismantled portion in CM (1:3) or PCC (1:2:4) complete including disposal of unservicable rubbish off the premises complete all as specified and directed by Engineer-in-Charge.
Note:- Debris will be disposed as per UT norms and Contractor will laise with UT athority for the same and rates quoted shall be deemed to include this aspect. | 7 | EACH | 10 | ₹70 |
| 5 | Taking down chowkhats with shutters (without taking off shutter from frame)exc 1.5 Sqm but n exc 4 sqm each with mongry including Cutting holes into through brick wall and making good to dismantled portion in CM (1:3) or PCC (1:2:4) complete including disposal of unservicable rubbish off the premises complete all as specified and directed by Engineer-in-Charge.
Note:- Debris will be disposed as per UT norms and Contractor will laise with UT athority for the same and rates quoted shall be deemed to include this aspect. | 10 | EACH | 10 | ₹100 |
| 6 | Raking out joints/ pointing to brick work or brick tiles, laid flat, in floors, paving and flush pointing in cement mortar 1:3 (upto 6th floor) complete including disposal of unservicable rubbish off the premises complete all as specified and directed by Engineer-in-Charge.
Note:- Debris will be disposed as per UT norms and Contractor will laise with UT athority for the same and rates quoted shall be deemed to include this aspect | 1 | 10 SQUARE METRE | 10 | ₹10 |
| 7 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing), complete including disposal of unservicable rubbish off the premises complete all as specified and directed by Engineer-in-Charge.
Note:- Debris will be disposed as per UT norms and Contractor will laise with UT athority for the same and rates quoted shall be deemed to include this aspect | 345 | SQUARE METRE | 10 | ₹3,450 |
| 8 | Demolition of entire Asbestos cement (corrugated, semicorrugated, etc.) sheets in roof coverings etc complete including disposal of unservicable rubbish off the premises complete all as specified and directed by Engineer-in-Charge.
Note:- Debris will be disposed as per UT norms and Contractor will laise with UT athority for the same and rates quoted shall be deemed to include this aspect | 40 | SQUARE METRE | 10 | ₹400 |
| 9 | Dismantling timber scantlings in fillets, rails, posts, rafters, purlins, etc. under 40 sq. cm in section complete including disposal of unservicable rubbish off the premises complete all as specified and directed by Engineer-in-Charge.
Note:- Debris will be disposed as per UT norms and Contractor will laise with UT athority for the same and rates quoted shall be deemed to include this aspect | 50 | RUNNING METRE | 10 | ₹500 |
| 10 | Demolition of Cement concrete unreinforced as in Ground Floor and paving n. exc. 15cm thick (above or below G.L.) complete including disposal of unservicable rubbish off the premises complete all as specified and directed by Engineer-in-Charge.
Note:- Debris will be disposed as per UT norms and Contractor will laise with UT athority for the same and rates quoted shall be deemed to include this aspect | 1 | CUBIC METRE | 10 | ₹10 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.34 MB
tender62.pdf
Tender Documents • 1.96 MB
BOQ_885580.xls
BOQ • 5.63 MB
corrigendum1merged.pdf
PDF • 0.55 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .