Loading…
Loading…
| # | Company | Offered Item | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.9 LFinancial bid opened MOEI & Fans, R/M of water supply pump sets, street light, compound lights and substation etc. at GPOA, Kendriya Sadan, Port Blair, A & N Islands. SH: Providing EPABX and UPS at CBI Office and Replacement of old obsolete out door Starter panel at GPOA Campus. | MOEI & Fans, R/M of water supply pump sets, street light, compound lights and substation etc. at GPOA, Kendriya Sadan, Port Blair, A & N Islands. SH: Providing EPABX and UPS at CBI Office and Replacement of old obsolete out door Starter panel at GPOA Campus. | L1 | Financial bid opened | |
| 2 | L2₹6.1 L+₹16,778.89 (2.82%)Financial bid opened MOEI & Fans, R/M of water supply pump sets, street light, compound lights and substation etc. at GPOA, Kendriya Sadan, Port Blair, A & N Islands. SH: Providing EPABX and UPS at CBI Office and Replacement of old obsolete out door Starter panel at GPOA Campus. | MOEI & Fans, R/M of water supply pump sets, street light, compound lights and substation etc. at GPOA, Kendriya Sadan, Port Blair, A & N Islands. SH: Providing EPABX and UPS at CBI Office and Replacement of old obsolete out door Starter panel at GPOA Campus. | L2 | Financial bid opened | |
| 3 | - | - | - | ||
| 4 | - | - | - |
| Sl No | Description | Qty | Unit | A K Engineerinig Services, Chennai L1 | M/S.POWERPOINT,Chennai-28. L2 |
|---|---|---|---|---|---|
| 1 | ELECTRICAL SCHEDULE | - | - | 9.51 ₹5,94,645.87 Lowest | 12.6 ₹6,11,424.76 |
Tender Value
₹5.4 L
EMD Value
₹10,860
Closing Date
27 Oct 2023, 4:30 pmClosed
ACESD, Port Blair
BASANTA KUMAR SAHOO
O/o Assistant Engineer (E)
MOEI & Fans, R/M of water supply pump sets, street light, compound lights and substation etc. at GPOA, Kendriya Sadan, Port Blair, A & N Islands. SH: Providing EPABX and UPS at CBI Office and Replacement of old obsolete out door Starter panel at GPOA Campus. Subwork/Packages: Providing EPABX and UPS at CBI Office and Replacement of old obsolete outdoor starter panel at GPOA Campus.
57294
80/EE(E)/CED-II/CHENNAI/ACESD/2023-24
OPEN
Electrical Works
NCB
3 months
South Andamans, Andaman And Nicobar Islands
8 documents required · 8 mandatory
₹10,860
Not Applicable
27 Oct 2023
20 Oct 2023
27 Oct 2023
27 Oct 2023
27 Oct 2023
stage.html
html • 0.08 MB
boq_comp_chart.xls
xls
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
DNIT+FOR+EPABX+and+MISC+WORK+AT+GPOA.pdf
document • 0.53 MB
Approved-List-Materials-Electrical-02-12-2020-CE-Chennai.pdf
document • 3.56 MB
SDG+Make+of+Materials.pdf
document • 5.12 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .