Tender Value
₹13.7 L
EMD Value
₹27,000
Closing Date
10 Feb 2021, 6:00 pmClosed
Superintending Engineer O and MC-II,3X200MW,BTPS
Office of Superintending Engineer O and MC-II,3X200MW,BTPS
Annual breakdown / running maintenance of H.P. Heater, Aux. PRDS system, fabrication / replacement of bends, O/H of control valve and etc. work of unit no. 9, 10, 11, 12 and 13 of 5X200 MW, BTPS, Obra
2020_RVUNL_521020_1
T- 15/SE-II/BTPS/TMD-I/2020-21
Open Tender
Miscellaneous Works
Fixed-rate
365 days
Unit no. 9, 10, 11, 12 and 13of 5X200MW, BTPS, Obra
As per PQC
3 documents required · 3 mandatory
₹1,180
Dy. Chief Account Officer, CFA and BO, BTPS, Obra
₹27,000
5 Jun 2021
15 Oct 2020
15 Feb 2021
15 Oct 2020
10 Feb 2021
15 Oct 2020
15 Oct 2020 - 10 Feb 2021
Amount
Overhauling of HP heater & attending of flange leakage.
Attending the shell joint of HPH
Attending the spot leakage of HPH shell joint. (44 studs to be removed.
O/H of DSS of Aux. PRDS
Overhauling of Safety valve:
Safety valve of flange & stud heating.
Safety valve of L.P. heater.
Safety valve of H.P. heater
Safety valve of CBD tank.
Safety valve of worm up line.
Safety valve of aux. PRDS system/ deaerator.
Fabrication of bend from H.P. Pipe.
SIZE- Día – 25 to 50mm
SIZE – Día – 51 to 60mm.
Cutting/welding of joint of H.P. Pipe.
SIZE- 15 to 50mm.
SIZE – 51 to 100mm.
O/H of special valve in H.P. Line.
NRV of extraction line of PCV-14 line connected to deaerator i.e. V2-52
NRV of Aux. RRDS line connected to deaerator i.e.V2-53.
NRV of feed line i.e. V2-80.
NRV of HP drip to deaerator line connecting to deaerator and NRV of condensate pump discharge line i.e. MC-4,5 &6
NRV in the line of Aux. RPDS heating line to FST i.e.V6-3
NRV in the line of re-circulation line of BFP at 27meter V2-88.
NRV in the spindle leak off line connected to deaerator
Fabrication of bend 63.5 X 5.5mm pipe with jacketing at bend.
O/H of group protection valve i.e. FW-1
O/H of H.P. Valve & NRV.
O/H of H.P. Steam drain line valve.
Cutting of old/damaged NRV of HPH drip to deaerator line and replacement it by re-welding of new/ repaired NRV by H.P. welding.
Welding of crack in HPH /CRH pipe line by grinding of crack and welding of the same:
Fabrication of bend for re-circulation line connected to deaerator.
Fabrication of bend for HPH drip line connected to deaerator.
CCutting / replacement of old and damaged bend of HPH drip line connected to deaerator and re-welding by new bend by H.P. Welding technique.
Cutting/replacement of old and damaged bend of re-circulation line connected to deaerator and re-welding by new bend by H.P. Welding technique.
Fabrication of bend of LPH drip line connected to drip pump/ condenser.
Cutting/ replacement of old and damaged bend of LPH drip line connected to drip pump/ condenser.
O/H of feed pump energy absorber.
Cutting / welding of H.P. Valve.
Size - 15 to 50mm
Size – 51 to 100mm
Size – 101 to 150mm
Size – 151 to 300mm
Removal of chocking of shell and coil drain of H.P. Heater no.5,6 & 7.
Overhauling of control valves:
LCV-3,4,5,6,7, 8A, 8B,9,10,11,12, & 15, PCV-5, 14, 16 & 17, TCV – 8, 10, 11 & 12
M/s Varghese Contractor
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .