Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.7 LAccepted-AOC | ₹25.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹26.8 LRejected-AOC | ₹26.8 L | L2 | Rejected-AOC L2 |
| 3 | L3₹27.2 LRejected-AOC | ₹27.2 L | L3 | Rejected-AOC L3 |
| 4 | L4₹28.6 LRejected-AOC | ₹28.6 L | L4 | Rejected-AOC L4 |
| 5 | L5₹29.6 LRejected-AOC | ₹29.6 L | L5 | Rejected-AOC L5 |
| Sl No | Description | Qty | Unit | P.Athimoolam L2 | M KULANTHAISAMY L3 | ROJA CONSTRUCTION L4 | AK CONSTRUCTION L6 | L.Arivazhagan L1 | SAKTHI CONTRACTORS L5 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00Construction of New Two Class Room School building at PUM Palikadu H/o Arakashanahalli Panchayat | |||||||||
| 2.00 | Earthwork excavation for foundation (for narrow excavation) to full depth as per designed in all soils and sub soils except soft disintegrated rock not requiring blasting and hard rock requiring blasting and bailing water wherever necessary. Refilling the sides of foundation with excavated earth other than sand in layers of well rammed and compacted and depositing the surplus earth in places shown by the departmental officers with an initial lead of 10m and initial lift of 2m and clearing and leveling the site etc. complete complying with standard specification. | 108.4 | Cum | 197.24 ₹21,380.82 | 197 ₹21,354.80 | 236.52 ₹25,638.77 | 245.29 ₹26,589.44 | 189.2 ₹20,509.28 | 200 ₹21,680 |
| 3.00 | Supplying and filling in foundations and basement with filling M- sand in layers not exceeding 15 cm.thick,well watered,rammed and consolidated etc. complete complying with standard specifications. | 16.07 | Cum | 1,505.42 ₹24,192.10 | 1,353 ₹21,742.71 | 1,281.54 ₹20,594.35 | 1,872.13 ₹30,085.13 | 1,444.08 ₹23,206.37 | 1,800 ₹28,926 |
| 4.00 | Plain Cement Concrete 1 : 4 :8 ( one part of cement, four parts of sand and eight parts of hard broken stone ) using 40 mm gauge hand broken hard broken granite stone jelly complying with standard specifications in foundations and basement. | 17.05 | Cum | 4,286.35 ₹73,082.27 | 5,100 ₹86,955 | 4,357.27 ₹74,291.45 | 5,330.48 ₹90,884.68 | 4,111.7 ₹70,104.49 | 5,000 ₹85,250 |
| 5.00 | Refilling the approved good quality earth in plinths, area development etc. wherever specified in layers is not exceeding 200 mm thick, with available earth at site. | 70.29 | Cum | 34.28 ₹2,409.54 | 34 ₹2,389.86 | 42.85 ₹3,011.93 | 42.64 ₹2,997.17 | 32.89 ₹2,311.84 | 40 ₹2,811.60 |
| 6.00 | Supplying and filling of good earth filling locally available earth transported from the outside including consolidation, leveling specified in layers of not exceeding 200 mm thick., etc. complete. | 68.96 | Cum | 422.13 ₹29,110.08 | 566 ₹39,031.36 | 527.6 ₹36,383.30 | 524.96 ₹36,201.24 | 404.93 ₹27,923.97 | 430 ₹29,652.80 |
| 7.00 | Supplying and erecting Centering and Shuttering for soffits including necessary supports and strutting up to 3 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at about 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specification.(Payment for centering shall be given after the concrete is laid).
Footing, Plinth Beam, etc. | 71.61 | Sqm | 413.25 ₹29,592.83 | 414 ₹29,646.54 | 416.5 ₹29,825.57 | 513.92 ₹36,801.81 | 396.41 ₹28,386.92 | 450 ₹32,224.50 |
| 8.00 | Plain surfaces such as roof slab, floor slab, beams, lintels, loft, sill slab, staircase waist, portico slab and other similar works. | 171.8 | Sqm | 826.5 ₹1.4 L | 827 ₹1.4 L | 1,033 ₹1.8 L | 1,027.84 ₹1.8 L | 792.83 ₹1.4 L | 850 ₹1.5 L |
| 9.00 | Square and rectangular columns and small quantities such as sunshades, parapet cum drops, window boxing, fin projections and other similar works. | 144.19 | Sqm | 909.15 ₹1.3 L | 910 ₹1.3 L | 836.3 ₹1.2 L | 1,130.62 ₹1.6 L | 872.11 ₹1.3 L | 1,000 ₹1.4 L |
| 10.00 | Providing and laying in position, M-25 Grade in accordance with IS:456-2000, using 20mm and down grade hard broken granite stone jelly for all RCC Items of works with minimum cement content of 350kg/m3 and maximum water cement ratio of 0.50, including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS:9130 to accelerate, rated setting of concrete, improve workability without impairing strength and durability with about (5.0 cu.m) 7730kg. of 20mm machine crushed stone jelly and with about (3.3cum) 5156 kg. of 10-12mm machine crused stone jelly and with about (4.79cum) 7670 kg of sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with Mechanical vibrators, finishing, curing, etc.,and providing fixtures like fan clamps in the RCC Floor / roof slabs wherever necessary without claiming extra, etc., Complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS Standards. (No Separate payment will be made by the Department for the excess usage of materials).
Foundation & Basement | 24.12 | Cum | 7,322.36 ₹1.8 L | 7,541 ₹1.8 L | 9,151.8 ₹2.2 L | 9,106.04 ₹2.2 L | 7,024.01 ₹1.7 L | 7,500 ₹1.8 L |
Tender Value
₹34 L
EMD Value
₹34,000
Closing Date
30 Jul 2025, 3:00 pmClosed
Block Development Officer (BP), Pennagaram Block
Block Development Officer (BP), Pennagaram Block
Construction of New Two Class Room School Building at PUMS Palikadu H/o Arakashanahalli Panchayat
2025_RDTN_584833_1
Re Roc.No.2951/2024/A3 CFSIDS-2025-2026 P03
Open Tender
Civil Works
120 days
Block Development Officer (BP), Pennagaram Block
Pre Qualification Documents
2 documents required · 2 mandatory
₹0
₹34,000
Yes
Block Development Officer (BP), Pennagaram Block
24 Jan 2026
23 Jul 2025
30 Jul 2025
23 Jul 2025
30 Jul 2025
23 Jul 2025
23 Jul 2025
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid