Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.8 CrAccepted-AOC | L1 | Accepted-AOC Lowest Bidder | |
| 2 | L2₹19.0 Cr+₹91.1 L (5.03%)Rejected-AOC | L2 | Rejected-AOC Highest Bidder | |
| 3 | Rejected-Technical 176 ASHOK NAGAR 1ST STREET MADURAI 625 018 | MADURAI | MADURAI | TAMIL NADU | 625018 | - | Rejected-Technical Not qualified |
| Sl No | Description | Qty | Unit | HEADWAY CONSTRUCTION L1 | SUBASH BUILDERS L2 |
|---|---|---|---|---|---|
| 1.00 | Earthworkexcavation in all classes of soils, except rock not requiring blasting and depositing on bank,with all leads and lifts as per SS20B, including all other incidental charges such as bailing out water,shoring, strutting, walling & forming protectivebunds wherevernecessary, etc., complete, as per relevant standard specifation, for DRESSING THE BED UPTO SILL LEVEL RL(+)95.800 (for bridge ventway portion only). | 500 | cum | 123.14 ₹61,570 Lowest | 129.42 ₹64,710 |
| 2.00 | Earthwork excavation in all classes of soil and depositing on bank with all leads and lifts as per SS20B, including cost of all labour,equipments and all incidental charges such as baling outwater,providing and maintaining necessary cofferdams,sheeting,shoring,bracing and their subsequent removal,removal of all logs,stumps, grubs and other deleterious matter and obstructions, trimming bottomof excavation, backfilling and clearing up the site and the disposal of all surplus material etc., complete as per relevant standard specification for FOUNDATION-FOOTING OF ABUTMENTS,RETURNS AND PIERS, as per section 300 of MORT&H Specifications (FifthRevision)( including 600mm from the face of footing as per Cl. 4.2.5.1 of IS: 1200 (Part 1) - 1992). | 6,310.91 | cum | 446.95 ₹28,20,661.22 Lowest | 469.77 ₹29,64,676.19 |
| 3.00 | Compacted Cement Concrete of Grade M15 ( Nominal Mix) using 40mm ISS size HBG graded metal including cost and conveyance of all materials to site, including cement at site including cost of formwork, soft water, labour charges for mixing, transporting laying and curing concrete , working at depths , tools and plants, and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specification for LEVELLING COURSE UNDER FOOTINGS as per section 2100 of MoRT &(H) specifications ( Fifth Revision). | 106.99 | cum | 6,565.43 ₹7,02,422.22 Lowest | 6,900.6 ₹7,38,281.39 |
| 4.00 | Vibrated cement concrete of grade M25 (Design mix ) using 40mm ISS HBG graded metal including cost and conveyance of all materials to site,including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting laying and curing concrete , working at depths , tools and plants, and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specification for FOOTING OF ABUTMENTS, RETURNS & PIERS as per section 1500, 1700 & 2100 of MORT&(H) Specifications Vth Revision . | 2,196.97 | cum | 9,743.79 ₹2,14,06,833.8 Lowest | 10,241.22 ₹2,24,99,673.59 |
| 5.00 | Vibrated cement concrete of grade M25 (Design mix ) using 40mm ISS size HBG graded metal including cost and conveyance of all materials to site,including cost of cement at site ,including cost of formwork, soft water, labour charges for mixing, transporting laying and curing concrete , working at depths , tools and plants, and including all other incidental charges etc., complete as per relevant standard specification for SUBSTRUCTURE OF ABUTMENTS, RETURNS & PIERS as per section 1500, 1700 & 2100 of MORT&(H) Specifications Vth Revision . | 991.12 | cum | 11,323.17 ₹1,12,22,620.25 Lowest | 11,901.23 ₹1,17,95,547.08 |
| 6.00 | Vibrated Reinforced Cement Concrete of grade M30 (Design Mix) using 20mm ISS size HBG graded metal including cost and conveyance of all materials to site, including cost of cement at site, including cost of form work, soft water, labour charges for mixing, transporting, lating and curing concrete , working at heights, tools and plants, including all incidental charges etc., complete as per relevant standard specificationsfor BED BLOCK cum DIRT WALL OVER ABUTMENTS & PIERS as per section 1500, 1600, 1700, 2200 of MORT&(H) Specifications Vth Revision. | 34.21 | cum | 12,874.11 ₹4,40,449.05 Lowest | 13,531.35 ₹4,62,934.55 |
| 7.00 | Providing weep holes with Class I PVCpipes of100mm dia. of required lengths for abutments and wings including cost and conveyance of all materials to work site, cost and labour for 900mm dia. semi spherical back fill arrangements with100mm size broken granite chips at the periphery and labour charges for fixing, etc.,to drain of the backfill in the ABUTMENTS AND RETURNS. | 107.19 | Rm | 210 ₹22,509.9 | 202.13 ₹21,666.31 Lowest |
| 8.00 | Providing and fixing KRAFT PAPER for full width of seating of deck slab and including cost and conveyance to worksite labour for fixing the same in correct position and all other incidental charges etc., complete. | 115.08 | sqm | 109.89 ₹12,646.14 Lowest | 115.5 ₹13,291.74 |
| 9.00 | Vibrated Reinforced Cement Concrete of grade M30 (Design Mix) using 20mm ISS HBG graded metal including cost and conveyance of all materials to site, including cost of cement at site, including cost of form work, soft water, labour charges for mixing, transporting, lating and curing concrete , working at heights, tools and plants, including all incidental charges etc., complete as per relevant standard specifications for DECK SLAB, KERB & FOOTPATH as per MORT&H Vth Revision 1500, 1700, 2300 of MoRT&(H) Specifications ( V revision). | 1,085.31 | cum | 12,315.67 ₹1,33,66,356.75 Lowest | 12,944.4 ₹1,40,48,725.6 |
| 10.00 | Vibrated Reinforced cement concrete of M30 (Design mix) using 20mm ISS size HBG graded metal as the max. size of coarse aggregate including cost and conveyance of all materials to site and cost of cement at site excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying and curing concrete, working at heights, soft water, hire charges for tools and plants including all other incidental charges etc., complete for Hand Rails and Posts as per section 2703 of MoRT&(H) Specifications ( V revision). | 228.8 | Rm | 1,311.29 ₹3,00,023.15 Lowest | 1,378.23 ₹3,15,339.02 |
Tender Value
₹9.8 Cr
EMD Value
₹5.0 L
Closing Date
16 Jul 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer, NH,Madurai
O/o Superintending Engineer, National Highways, No.5, Besant Road, ChinnaChokkikulam Madurai 02
Construction of High Level Bridge in lieu of Piped causeway at Km 30/2 of Mudhukalathur -Veeracholan road to meet Km99/4 of SH42 road Km 25/925 - 35/725 (M638)
2025_MoRTH_866698_1
TN No 06/2025-26/HDO/NH/Dt. 27.06.2025
Open Tender
Civil Works - Highways
Item Rate
210 days
Madurai
As per Tender document
4 documents required · 4 mandatory
₹17,700
Divisional Engineer NH Madurai
₹5.0 L
O/o Superintending Engineer, NH,Madurai
22 Sept 2025
30 Jun 2025
17 Jul 2025
30 Jun 2025
16 Jul 2025
30 Jun 2025
7 Jul 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthworkexcavation in all classes of soils, except rock not requiring blasting and depositing on bank,with all leads and lifts as per SS20B, including all other incidental charges such as bailing out water,shoring, strutting, walling & forming protectivebunds wherevernecessary, etc., complete, as per relevant standard specifation, for DRESSING THE BED UPTO SILL LEVEL RL(+)95.800 (for bridge ventway portion only). | 500 | cum | 100 | ₹50,000 |
| 2 | Earthwork excavation in all classes of soil and depositing on bank with all leads and lifts as per SS20B, including cost of all labour,equipments and all incidental charges such as baling outwater,providing and maintaining necessary cofferdams,sheeting,shoring,bracing and their subsequent removal,removal of all logs,stumps, grubs and other deleterious matter and obstructions, trimming bottomof excavation, backfilling and clearing up the site and the disposal of all surplus material etc., complete as per relevant standard specification for FOUNDATION-FOOTING OF ABUTMENTS,RETURNS AND PIERS, as per section 300 of MORT&H Specifications (FifthRevision)( including 600mm from the face of footing as per Cl. 4.2.5.1 of IS: 1200 (Part 1) - 1992). | 6,310.91 | cum | 10 | ₹63,109.1 |
| 3 | Compacted Cement Concrete of Grade M15 ( Nominal Mix) using 40mm ISS size HBG graded metal including cost and conveyance of all materials to site, including cement at site including cost of formwork, soft water, labour charges for mixing, transporting laying and curing concrete , working at depths , tools and plants, and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specification for LEVELLING COURSE UNDER FOOTINGS as per section 2100 of MoRT &(H) specifications ( Fifth Revision). | 106.99 | cum | 10 | ₹1,069.88 |
| 4 | Vibrated cement concrete of grade M25 (Design mix ) using 40mm ISS HBG graded metal including cost and conveyance of all materials to site,including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting laying and curing concrete , working at depths , tools and plants, and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specification for FOOTING OF ABUTMENTS, RETURNS & PIERS as per section 1500, 1700 & 2100 of MORT&(H) Specifications Vth Revision . | 2,196.97 | cum | 10 | ₹21,969.72 |
| 5 | Vibrated cement concrete of grade M25 (Design mix ) using 40mm ISS size HBG graded metal including cost and conveyance of all materials to site,including cost of cement at site ,including cost of formwork, soft water, labour charges for mixing, transporting laying and curing concrete , working at depths , tools and plants, and including all other incidental charges etc., complete as per relevant standard specification for SUBSTRUCTURE OF ABUTMENTS, RETURNS & PIERS as per section 1500, 1700 & 2100 of MORT&(H) Specifications Vth Revision . | 991.12 | cum | 10 | ₹9,911.2 |
| 6 | Vibrated Reinforced Cement Concrete of grade M30 (Design Mix) using 20mm ISS size HBG graded metal including cost and conveyance of all materials to site, including cost of cement at site, including cost of form work, soft water, labour charges for mixing, transporting, lating and curing concrete , working at heights, tools and plants, including all incidental charges etc., complete as per relevant standard specificationsfor BED BLOCK cum DIRT WALL OVER ABUTMENTS & PIERS as per section 1500, 1600, 1700, 2200 of MORT&(H) Specifications Vth Revision. | 34.21 | cum | 10 | ₹342.12 |
| 7 | Providing weep holes with Class I PVCpipes of100mm dia. of required lengths for abutments and wings including cost and conveyance of all materials to work site, cost and labour for 900mm dia. semi spherical back fill arrangements with100mm size broken granite chips at the periphery and labour charges for fixing, etc.,to drain of the backfill in the ABUTMENTS AND RETURNS. | 107.19 | Rm | 10 | ₹1,071.9 |
| 8 | Providing and fixing KRAFT PAPER for full width of seating of deck slab and including cost and conveyance to worksite labour for fixing the same in correct position and all other incidental charges etc., complete. | 115.08 | sqm | 10 | ₹1,150.8 |
| 9 | Vibrated Reinforced Cement Concrete of grade M30 (Design Mix) using 20mm ISS HBG graded metal including cost and conveyance of all materials to site, including cost of cement at site, including cost of form work, soft water, labour charges for mixing, transporting, lating and curing concrete , working at heights, tools and plants, including all incidental charges etc., complete as per relevant standard specifications for DECK SLAB, KERB & FOOTPATH as per MORT&H Vth Revision 1500, 1700, 2300 of MoRT&(H) Specifications ( V revision). | 1,085.31 | cum | 10 | ₹10,853.13 |
| 10 | Vibrated Reinforced cement concrete of M30 (Design mix) using 20mm ISS size HBG graded metal as the max. size of coarse aggregate including cost and conveyance of all materials to site and cost of cement at site excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying and curing concrete, working at heights, soft water, hire charges for tools and plants including all other incidental charges etc., complete for Hand Rails and Posts as per section 2703 of MoRT&(H) Specifications ( V revision). | 228.8 | Rm | 10 | ₹2,288 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tenderdocument.rar
Tender Documents • 1.71 MB
BOQ.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .