| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.0 LAccepted-AOC NA NA NA | NA | NA | 121004 | ₹8.0 L | L1 | Accepted-AOC Lowest Amount Quoted |
| 2 | L2₹8.0 LRejected-Finance TAMIL NADU TN | TUTICORIN | TAMIL NADU | 626202 | ₹8.0 L | L2 | Rejected-Finance Highest Amount Quoted |
| Sl No | Description | Qty | Unit | Mr. K. Abdulkather, Contractor L1 | Mr. K. Ganesan, Contractor L2 |
|---|---|---|---|---|---|
| 1.00 | Dismantling, clearing away and carefully stacking material useful for reuse for any thickness of brick or stone masonry in Cement Mortar walls under 3 (Three) metres high complying with standard specification and as directed by the Engineer. | 33.39 | Cum | 302.95 ₹10,115.5 Lowest | 302.96 ₹10,115.83 |
| 2.00 | Dismantling, clearing away and carefully stacking material useful for reuse for any thickness of Plain cement concrete complying with standard specification and as directed by the Engineer. | 7.05 | Cum | 520.22 ₹3,667.55 Lowest | 520.23 ₹3,667.62 |
| 3.00 | Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers wi | 106.66 | Cum | 131.88 ₹14,066.32 Lowest | 131.89 ₹14,067.39 |
| 4.00 | Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers wi | 80.83 | Cum | 263.78 ₹21,321.34 Lowest | 263.78 ₹21,321.34 Lowest |
| 5.00 | Collection and supply of Msand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications | 8.31 | Cum | 1,630.83 ₹13,552.2 Lowest | 1,630.84 ₹13,552.28 |
| 6.00 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc., complete | 23.52 | Cum | 5,434.35 ₹1,27,815.91 Lowest | 5,434.36 ₹1,27,816.15 |
| 7.00 | Centering shuttering the sides with necessary supports as per standard specifications including all labour charges etc., Complete. | 281.03 | Sqm | 547.5 ₹1,53,863.93 Lowest | 547.5 ₹1,53,863.93 Lowest |
| 8.00 | Deck slab | 19.77 | Sqm | 1,094.95 ₹21,647.16 Lowest | 1,095 ₹21,648.15 |
| 9.00 | Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc., complete | 48.39 | Cum | 6,725.41 ₹3,25,442.59 Lowest | 6,725.41 ₹3,25,442.59 Lowest |
| 10.00 | Supplying and fabrication of steel including cost and conveyance of bending to shape and tying in position and forming grills for all RCC works including cost and conveyance of all materials to site. | 530.67 | Kgs | 91.86 ₹48,747.35 Lowest | 91.86 ₹48,747.35 Lowest |
Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
27 Jan 2026, 3:00 pmClosed
BDO (B.Pt.)
Panchayat Union, Manur.
Sluice work
2026_RDTN_644307_3
A2/5647/2025
Open Tender
Civil Works - Water Works
Item Rate
180 days
Manur
Refer tender doc
2 documents required · 2 mandatory
₹0
₹10,000
11 Jul 2026
17 Jan 2026
28 Jan 2026
17 Jan 2026
27 Jan 2026
17 Jan 2026
Dismantling, clearing away and carefully stacking material useful for reuse for any thickness of brick or stone masonry in Cement Mortar walls under 3 (Three) metres high complying with standard specification and as directed by the Engineer.
Dismantling, clearing away and carefully stacking material useful for reuse for any thickness of Plain cement concrete complying with standard specification and as directed by the Engineer.
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers wi
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers wi
Collection and supply of Msand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc., complete
Centering shuttering the sides with necessary supports as per standard specifications including all labour charges etc., Complete.
Deck slab
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc., complete
Supplying and fabrication of steel including cost and conveyance of bending to shape and tying in position and forming grills for all RCC works including cost and conveyance of all materials to site.
Reinforces cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc., complete.
Refilling with excavated earth (other than sand) available at site with all leads and lifts for filling the open cut cut where ever necessary compacting as directed by the Engineer complete complying with standard specification complying with standard specification.
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.70 MB
BOQ_772047.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].