Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹96,750Accepted-Finance NOT AVAILABLE | L1 | Accepted-Finance Lowest | |
| 2 | L2₹1.1 L+₹10,550 (10.9%)Accepted-Finance | L2 | Accepted-Finance higher than L1 | |
| 3 | L3₹1.1 L+₹15,600 (16.1%)Accepted-Finance BHAGWATI NAGAR JAMMU | L3 | Accepted-Finance higher than L1 |
Tender Value
Refer Docs
Closing Date
10 May 2021, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer MICD Jammu
Office of Executive Engineer MICD Jammu
maintenance and providing/fitting of new parts/materials at LIS Miari, LIS Gurah Banara and LIS Thanger chowdhrialla of MICSD Jammu
2021_IFC_123466_1
MICD/J/8 dated 29/04/2021
Open Tender
Machineries/ Mechanical Engg Items
Lump-sum
15 days
Jammu
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
Executive Engineer MICD Jammu
Exempted
11 Jun 2021
29 Apr 2021
11 May 2021
29 Apr 2021
10 May 2021
1 May 2021
180 days
Amount
maintenance and providing/fitting of new parts/materials at LIS Miari, LIS Gurah Banara and LIS Thanger chowdhrialla of MICSD Jammu
LIS MIARI Complete servicing /greasing of installed pumping machinery at LIS Miari for upkeepment purpose by way of dismantling of complete bearing bracket assembly including its covers of HC pumpset . Extracting of damaged bearing from the bracket assembly of the pump with the help of puller. The job includes p/f on 1 no new bearing as per sample including complete greasing and refitting back. Job also includes p/f of new gland packing of 12mm dia. complete job to be executed at site which includes cost of labour and material charges
Repair to oil tank to avoid leakage by way of soldering and refitting back by way of Providing and Topping up of deficit T.Oil 90 litres (approx) in the repaired tank of voltage stabilizer also providing and fitting the new drain plug. Complete job includes cost of material, labour charges (skilled and semi skilled)/ carriage of material required at site of LIS. Complete Job
Repair to 2HP Mono-block priming pump installed at LIS Miari. The job involves dismantling of priming pump from the 50mm suction line and 40mm delivery line, disconnection of power supply, extraction of rotor from stator. Varnishing the stator with varnish in two coats and then drying the same. Providing/fitting of new bearing in place of damaged and greasing properly. Reassembling the motor. Providing/ fitting of 1No.control valve in place of old damaged valve. Providing/fitting of 50mm dia. foot valve, worn out nuts, bolts, rubber sheet. Complete job includes cost of material, labour charges at site of LIS. The rebate on old parts/ materials has to be provided by the executing agency. Complete Job
Repairs to 1 no. chocked foot valve of 200 mm diameter of unit I. by way of dismantling of foot valve using required tools and tackles and then providing and fitting of new leather washers cut to size, adjustment of flaps with repairs to hinges if required. Reassembling the foot valves and fitting the same with suction pipes by providing and fitting of new R.I sheets and nuts and bolts etc.The job also includes the replacement of damaged foot valve of unit II at LIS Miari. The job involves extraction of damaged Foot valve and then providing/fitting of new foot valve for 200mm dia. suction pipe in place of damaged one .Complete job includes the cost of material used and labour charges for skilled and semi skilled labour employed at site of execution of job. The rebate on old parts/ materials has to be provided by the executing agency. Complete Job
LIS GURAH BANARA Upkeepment/Servicing/Greasing of pumping machinery installed at LIS Gurah Banara The job includes servicing/greasing of 2Nos 3 cusec discharge along with40 H.P motors. The job involves the providing and fitting of new gland packings in place of damaged one. The job further includes the decoupling of motor of unit II from the pump and extraction of rotors out of stators. Providing/fitting of new bearing as per sample at DE and NDE, cleaning of stators with petrol and then applying varnish in alternate coats. Fitting of rotor and side cover in stators and making electrical connections and testing at full load. The Job involves the topping up of deficit T.Oil 10 litres (approx) in Auto Transformer Starters. The job also includes the cleaning of machinery to make them rust and dust free. Complete job includes cost of material, labour charges (skilled and semi skilled) required at site of LIS. The rebate on old parts/ materials has to be provided by the executing agency. Complete Job
Upkeepment of pumping machinery installed at LIS Thanger Chowdhrialla. The job involves servicing of the 2 nos. 5 cusec discharge pumps along with 120H.P motors, greasing to bearings of pumps,motors.Providing/fitting of gland packings to HC Pumps.The job also involves topping up of deficit T.Oil 30 litres in starters. The job also includes the cleaning of machinery to make them dust free.Complete job includes cost of material, skilled and semi skilled labour charges required at site. Complete Job
Amit Electrical and Engineering Works
M/S FASTTRACK ENGINEERS
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .