Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.5 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹4.7 L+₹18,584 (4.14%)Rejected-Finance | L2 | Rejected-Finance L3 | |
| 3 | L2₹4.7 L+₹18,584 (4.14%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 4 | L3₹4.7 L+₹23,474 (5.23%)Rejected-Finance | L3 | Rejected-Finance L2 |
Tender Value
₹4.9 L
EMD Value
₹48,905
Closing Date
2 Sept 2026, 3:00 pmClosed
KMC Motijheel
KMC Motijheel Kanpur
imp.C.C. Road Around of Babupurwa in Pakka akhada in ward 105 Zone 3
2026_NNKAN_1179816_1
844/A.A.3/25-26
Open Tender
Civil Works
Fixed-rate
imp.C.C. Road Around of Babupurwa in Pakka akhada
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
₹48,905
9 Oct 2026
25 Aug 2026
2 Sept 2026
25 Aug 2026
2 Sept 2026
25 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismentalling of B.O.E soling/inter locking tiles including Stacking of servicable direction of EL/C ( Labour only) material and disposal etc all comp | - | sqm | 11 | - |
| 2 | Class-150 brick work in 1:4 cement C.Sand in foundation and pilnth etc all comp | - | Cum | 6,600 | - |
| 3 | Plaster and painting 15 mm cement plaster on rough side of single or half brick wall finished with a floating coat of neat cement of mix 1:4 ?( 1 cement :4 fine sand) 15 mm cement plaster etc all comp. | - | Sqm | 255 | - |
| 4 | Construction of granular sub base (GSB)by providing Well graded material spreading in uniform layers with motor grader on prepared surface etc all comp. | - | Cum | 3,671 | - |
| 5 | R.C.C.Work 4.1.3 providing and laying in position and laying in position cement concrete of specified grade concrete etc all comp | - | Cum | 6,750 | - |
| 6 | Water supply material construction of M.H chamber 0.60x0.60x1.20 etc all comp | - | Cum | 8,687 | - |
| 7 | Earth Work Disposal of earth upto 3 km including loading & unloading etc all comp Disposal of earth up to 3 km including etc all comp | - | Cum | 116.96 | - |
| 8 | Add 18% GST | - | GST | 74,600.89 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.88 MB
BOQ_2218489.xls
BOQ • 0.22 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .