Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.7 LAccepted-AOC | ₹24.7 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹24.7 LSame as L1Rejected-AOC | ₹24.7 LSame as L1 | L2 | Rejected-AOC Rejected |
| 3 | L2₹24.7 LSame as L1Rejected-AOC AT TINIGHARIA NUA SAHI PO NAYA BAZAR DIST CUTTACK | CUTTACK | CUTTACK | ODISHA | ₹24.7 LSame as L1 | L2 | Rejected-AOC Rejected |
| 4 | L2₹24.7 LSame as L1Rejected-AOC | ₹24.7 LSame as L1 | L2 | Rejected-AOC Rejected |
| 5 | L2₹24.7 LSame as L1Rejected-AOC | ₹24.7 LSame as L1 | L2 | Rejected-AOC Rejected |
Tender Value
₹24.7 L
EMD Value
₹24,700
Closing Date
8 Apr 2026, 5:00 pmClosed
Executive Engineer, CD-I
At Bikash Bhawan, Jagannathlane, Badambadi, Cuttack 753012
Construction and laying underground drainage pipeline with chamber from Justice Chakka to Sairam Food Plaza CDA Sec-10 in Ward No. 3.
2026_ORULB_127649_4
MC(CMC)CTC_Div-I_No.26/2025-26
Open Tender
Civil Works - Others
Percentage
60 days
CMC
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,080
₹24,700
Yes
11 Sept 2026
30 Mar 2026
13 Apr 2026
30 Mar 2026
8 Apr 2026
30 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Dismantling & removing old damaged cement concrete including stacking the useful materials for reuse and removing lead including all cost, conveyance, cost of all labour, T&P etc. as required for the work complete and as per direction of Engineer in charge. | |||||
| 2Earthwork in excavtion of foundation in all kinds of soil within initial lead and lift including dressing and levelling the bed and depositing the soil as directed. | |||||
| 3Sand Filling with Good Quality Filling Sand including Watering, Cumpacting all Cost of labour and Material etc Complete. | |||||
| 4Providing Fitting & Fixing precast concrete pipe of class NP-3 suitable for socket joint with all cost of labour & material etc complete 300mm dia. | |||||
| 5C.C (1:3:6) with 40mm size crusher broken metal with wel watering and comoacting with all cost etc complete. | |||||
| 6Cement Concrete (1:2:4) with 12mm size Crusher broken hard granite metal including centering & Shuttering with cost of all labour, materials with all taxes, lead, T&P etc all complete. | |||||
| 7Supply all Material Labour and T&P Construct of Sluice Valve Chamber with Earth work, Sand filling, C.C (1:3:6) Flyash brick work & Plastering with FRC S.V Chamber cover as per PH Specification and design Chamber with precast RCC Main hole Cover. | |||||
| 8Removal of excavate earth and dismantle material away from work site to out site by mechanical means up to 5 km lead etc complete as per the direction of the Engineer-in-charge. | |||||
stage.html
html • 0.07 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_586661.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.33 MB
BOQ_586661.xls
BOQ • 0.29 MB
corr.pdf
Tender Documents • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .