Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.2 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹14.7 L+₹48,642 (3.43%)Rejected-Finance | L2 | Rejected-Finance Other than L1 | |
| 3 | L3₹15.7 L+₹1.5 L (10.4%)Rejected-Finance | L3 | Rejected-Finance Other than L1 | |
| 4 | L4₹16.5 L+₹2.3 L (16.3%)Rejected-Finance | L4 | Rejected-Finance Other than L1 | |
| 5 | L5₹17.8 L+₹3.6 L (25.3%)Rejected-Finance C O OPPOSITE MH MANDA POONCH ROAD AKHNOOR 181201 J K | JAMMU | JAMMU AND KASHMIR | 181201 | L5 | Rejected-Finance Other than L1 |
Tender Value
₹22 L
EMD Value
₹44,000
Closing Date
13 Jun 2020, 6:00 pmClosed
G E North Akhnoor
G E North Akhnoor
MAINTENANCE AND OPERATION OF WATER SUPPLY INSTALLATION AT AKHNOOR UNDER GE NORTH AKHNOOR
2020_MES_325435_2
GE(N)/AKH-59/2019-20
Open Tender
Civil Works
Item Rate
330 days
Akhnoor
E Class Cat d v
8 documents required · 8 mandatory
₹500
G E North Akhnoor
₹44,000
Yes
19 Oct 2020
27 May 2020
15 Jun 2020
27 May 2020
13 Jun 2020
1 Jun 2020
Amount
The rate to be quoted by the contractor shall not be less than minimum wages as fixed under Central Govt Min of labour and Employment vide their latest notification or the rate fixed by the state Govt/Local body under any statutory order whichever is higher, including GST, LWC, EPF, ESI Insurence as applicable on the bid submission end date.
Maintenance and operation including controlling of valves of RCC over head tanks of capacity 25000 gallons at Ridge Area and PVC over head tank of capacity 4500 gallons at ASC Buttchery (The jobs includes daily cleaning of valve pits replacing of gland packing wherever required) for One shift (08 Hours Per shift) including Sunday and holidays by engaging one semi skilled labour per shift for smooth and efficient functioning of the installation including maintenance of documents as applicable.
Maintenance and operation for Tubewell No. 05 (The jobs includes daily cleaning of panels, stabilizer, DG set, replacing of gland packing wherever required) for Two shifts (08 Hours Per shift) including Sunday and holidays by engaging one semi skilled labour per shift for smooth and efficient functioning of the installation including maintenance of documents as applicable.
Maintenance and operation for Stage III pump house (The jobs includes daily cleaning of panels, stabilizer, DG set, replacing of gland packing wherever required) for Two shifts (08 Hours Per shift) including Sunday and holidays by engaging one semi skilled labour per shift for smooth and efficient functioning of the installation including maintenance of documents as applicable.
Maintenance and operation for Pump house 6 (The jobs includes daily cleaning of panels, stabilizer, DG set, replacing of gland packing wherever required) for One shift (08 Hours Per shift) including Sunday and holidays by engaging one semi skilled labour per shift for smooth and efficient functioning of the installation including maintenance of documents as applicable.
Maintenance and operation for comprehansive maintenance and repair to external water supply pipe line of area of Ridge line, Feild Park, MH , FD Hosp, and water supply installation as stage I/II, Tube Well No 3/5/6/7 upto stage II pump house area consisting of pumping, supply and distribution system, by engaging one team of one skilled labour as fitter pipe and one helper unskilled requisite manpower for One shift (08 Hours Per shift) excluding sundays and holidays complete all as directed by Engineer in charge.
Maintenance and operation for comprehansive maintenance and repair to external water supply pipe lines of area of total Tanda area (except the area mentioned at Srl No 05) from GM Vihar up to SATA Battery including Stage III Pump House consisting pumping, supply and distribution system, in complete by engaging one team of one skilled labour as fitter pipe and one helper unskilled requisite manpower for One shift (08 Hours Per shift) excluding sundays and holidays complete all as directed by Engineer in charge.
M/S SAHNI CONSTRUCTION CO
ASIA ENTERPRISES
ARORA ENTERPRISES
Usha Engineering Co.
m/s vaid contractor and builders
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .