Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹83.3 L
EMD Value
₹1.7 L
Closing Date
2 Aug 2024, 10:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Minor Irrigation Department
T N RAMACHANDRA
Package-18-Providing electrification to the borewells drilled in the lands of 1) Totaiah s/o Eraiah of Muttathi Village 2) Kariyaiah s/o Maridyavaiah of Muttathi Village 3) Rajaiah s/o Giddaiah of Melagodu (Chowrikoppalu) Village 4) Giddaiah s/o Chikkaiah of Melagodu (Chowrikoppalu) Village 5) Jayamma w/o Javaraiah of Melagodu Village 6) Dyavamma w/o Dyavaiah of Mayasamudra Village 7) Tammappa s/o Kariyaiah of Melagodu Village 8) Kalyanamma w/o Puttaiah of Yogihalli Village 9) Kumara s/o Rangaiah of Yogihalli Village 10) Rangaiah s/o Eraiah of Arasihalli Village 11) Manjula w/o Sannamariyaiah of AttavaraHosahalli Village 12) Dyavamma w/o SannaDyavaiah of AttavaraHosahalli Village 13) Lakshmisha s/o Hombaligaiah of Jodikrishnapura Village 14) Manjaiah s/o Rajaiah of Jodikrishnapura Village 15) Chikkamma w/o Late.Papaiah of Jodikrishnapura Village 16) Javaraiah s/o Late.Dasaiah of Jodikrishnapura Village 17) Jayanna s/o Kariyaiah of Jodikrishnapura Village 18) Prakash s/o Papaiah of Jodikrishnapura Village 19) Ramaiah s/o Malaiah of Jodikrishnapura (Gowripura Somanahalli Kalvalu) Village 20) Timmaiah s/o Bootaiah of G.Mylanahalli (Chattanahalli) Village 21) Sannarangaiah (Mataiah) of Nilagiddaiah of G.Mylanahalli ( Chattanahalli) Village 22) Devamma w/o Dasaiah of Hampanahalli Village 23) Nagamma w/o Rangaiah of Hariharapura Village Dudda Hobli, Hassan Taluk , Hassan Dist.
MI/2024-25/EL/WORK_INDENT2272
MI/2024-25/EL/WORK_INDENT2272
Open
Electrical
Two Tender Document System(Two Cover)
Minor Irrigation Division Hassan
8 documents required · 8 mandatory
List of works for which tenders already submitted
Banker Details for reference
Construction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awarded
Reports on the financial standing of the tenderer, such as profit and loss statements and auditor’s reports for the last five years
Qualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awarded
List of Financial Resources with Certificates
ITT (3.2(b) To qualify for award of this contract , Mandating satisfactory completion as a prime contractor, at least one similar nature of work as providing Electrification of 11kv line using Rabbit ACSR conductor (in the last five years periodi.e.,2019-20, 2020-21, 2021-22, 2022-23 and 2023-24) to an extent of 50% of the costof the work for all works costing up toRs.41.70 Lakhs.
ITT 3.2(c) To qualify for award of this contract each tenderer in its name should Execute in any one year (for a continuous period of 12 months) the minimum quantities of work (usually 80% of annual requirement) for works costing up to Rs.100.00 lakhs. 1. 11kv line using Rabbit ACSR: 42.00 km 2. Erection of 25 KVA, 11KV Transformer: 24.00 NUMBERS 3. Erection of 9/8 Mts Long RCC/PSCC Poles: 373.00 NUMBERS 4. Providing Guy Sets: 247.00 Set
IIT 3.2(a) To qualify for award of this contracteach tenderer in his name should have in thelast five years period (i.e., 2019-20,2020-21, 2021-22, 2022-23 and 2023-24) achieved inat least two financial years an average annual financial turnover of Rs.83.40Lakhs(in all classes of civil engineering construction works only)
IIT 3.3(b)liquid assets and /or availability ofcredit facilities of not less than Rs.25.00 Lakhs (Credit lines/ letter of credit/ certifcates from banks for meeting the fundrequirement etc. (usually 30% of the amount of contract) for works costing up toRs.100.00 lakhs
Contractor Registration Certifcate
Contractor shall have one Graduate Engineerwith 5 years Experience for work Supervision
List of existing commitments and ongoing works
Valid GST, ESI & EPF certifcate
Works for which Tenders already submitted
₹2,090
₹1.7 L
24 Jul 2024
24 Jul 2024
3 Aug 2024
1 Aug 2024
Package-18-Providing electrification to the borewells driled in the lands of 23 beneficiaries in Dudda Hobli, Hassan Taluk , Hassan Dist.
RCC Pole 9 mtr long 145 KG WL-Material cost ---- etc., complete with all leads and lifts as per standard specifications and directions of the Engineer in-charge of the work
RCC Pole 9 mtr long 145 KG WL-Labour Charge ---- etc., complete with all leads and lifts as per standard specifications and directions of the Engineer in-charge of the work
Loading and unloading of Pole (loading of Pole to vehicles at stores and unloading at workspot) NOTE:- Consolidated amount for both loading and unloading.-9 Mtr RCC/PSCC Pole ---- etc., complete with ...
Transporation by Head Load where ever there is no accessability for transporation by vechicle-25 to 105 Mtr ---- etc., complete with all leads and lifts as per standard specifications and directions o...
PSCC Pole 9 mtr long 200 Kg WL-Material cost ---- etc., complete with all leads and lifts as per standard specifications and directions of the Engineer in-charge of the work
PSCC Pole 9 mtr long 200 Kg WL -Labour Charge ---- etc., complete with all leads and lifts as per standard specifications and directions of the Engineer in-charge of the work
Loading and unloading of Pole (loading of Pole to vehicles at stores and unloading at workspot) NOTE:- Consolidated amount for both loading and unloading.-9 Mtr RCC/PSCC Pole ---- etc., complete with ...
Transporation by Head Load where ever there is no accessability for transporation by vechicle-25 to 105 Mtr ---- etc., complete with all leads and lifts as per standard specifications and directions o...
Spiral earth electrode-Material cost ---- etc., complete with all leads and lifts as per standard specifications and directions of the Engineer in-charge of the work
Providing Spiral Earth Electrode type earthing (without charcoal, salt etc.,)-Labour cost ---- etc., complete with all leads and lifts as per standard specifications and directions of the Engineer in-...
11 kV, Horizontal Cross Arm with HT Single Top supports, clamps, bolts, nuts & washers - MS-For RCC Pole -Material cost ---- etc., complete with all leads and lifts as per standard specifications and ...
11 kV, Horizontal Cross Arm with HT Single Top supports, clamps, bolts, nuts & washers - MS-For RCC Pole-Labour charges ---- etc., complete with all leads and lifts as per standard specifications and ...
11 kV, 45 kN Polymeric Insulator-Material cost ---- etc., complete with all leads and lifts as per standard specifications and directions of the Engineer in-charge of the work
11 kV, 5 kN Composite/Polymeric Pin Insulator (24 mm dia FRP Rod) -Material cost ---- etc., complete with all leads and lifts as per standard specifications and directions of the Engineer in-charge of...
Guy set with No. 15 Strain Insulator & Concreting materials as per Dwg No. BESCOM/GM/CP/7 Dt: 24.10.07-
Material cost ---- etc., complete with all leads and lifts as per standard specifications and di...
Guy set with No. 15 Strain Insulator & Concreting materials as per Dwg No. BESCOM/GM/CP/7 Dt: 24.10.07-Labour charges ---- etc., complete with all leads and lifts as per standard specifications and di...
ACSR Conductor as per IS-398 (Part - 2/1996) -Rabbit ACSR(6/3.35 mm Al + 1/3.35 mm St), Std Wt: 214 Kg/KM -Material cost ---- etc., complete with all leads and lifts as per standard specifications and...
Stringing of conductor Rabbit ACSR binding of conductor on each insulator and dead ending on strain or disc/strain insulator by means of clamps.-Labour Charges (Per Km Per Wire) ---- etc., complete wi...
PG Clamp - Rabbit to Rabbit-Material cost ---- etc., complete with all leads and lifts as per standard specifications and directions of the Engineer in-charge of the work
Erection of 3 Phase, 11kV/433V,25 kVA BEE-4/5 Star Rated Distribution Transformer Centre using 9 mtr RCC Pole DPTC-i) Using 4 star Rated Transformer-Material Charges ---- etc., complete with all leads...
Erection of 3 Phase, 11kV/433V,25 kVA BEE-4/5 Star Rated Distribution Transformer Centre using 9 mtr RCC Pole DPTC-i) Using 4 star Rated Transformer-Labour charges ---- etc., complete with all leads a...
Loading & Unloading of Transformer - 25 kVA- Loading ---- etc., complete with all leads and lifts as per standard specifications and directions of the Engineer in-charge of the work
Loading & Unloading of Transformer - 25 kVA- Un loading ---- etc., complete with all leads and lifts as per standard specifications and directions of the Engineer in-charge of the work
Transporation by Head Load where ever there is no accessability for transporation by vechicle -Distribution Transformer 25 kVA-25 to 105 Mtr (Per Transformer) ---- etc., complete with all leads and li...
RCC Pole - 8 M Long, 115 Kg WL -Material cost ---- etc., complete with all leads and lifts as per standard specifications and directions of the Engineer in-charge of the work
RCC Pole 8 mtr long,115 kg WL -Labour cost ---- etc., complete with all leads and lifts as per standard specifications and directions of the Engineer in-charge of the work
Loading and unloading of Pole (loading of Pole to vehicles at stores and unloading at workspot) NOTE:- Consolidated amount for both loading and unloading.-8 Mtr RCC/PSCC Pole ---- etc., complete with ...
Transporation by Head Load where ever there is no accessability for transporation by vechicle-25 to 105 Mtr ---- etc., complete with all leads and lifts as per standard specifications and directions o...
PSCC Pole - 8 M Long 200 Kg WL -Material cost ---- etc., complete with all leads and lifts as per standard specifications and directions of the Engineer in-charge of the work
PSCC Pole 8 mtr long 200 KG WL -Labour cost ---- etc., complete with all leads and lifts as per standard specifications and directions of the Engineer in-charge of the work
Loading and unloading of Pole (loading of Pole to vehicles at stores and unloading at workspot) NOTE:- Consolidated amount for both loading and unloading.-8 Mtr RCC/PSCC Pole ---- etc., complete with ...
Transporation by Head Load where ever there is no accessability for transporation by vechicle-25 to 105 Mtr ---- etc., complete with all leads and lifts as per standard specifications and directions o...
LT 4 Pin Cross Arm with clamps, bolts, nuts & washers with brace - MS-For RCC Pole- Material cost ---- etc., complete with all leads and lifts as per standard specifications and directions of the Eng...
LT 4 Pin Cross Arm with clamps, bolts, nuts & washers with brace - MS-For RCC Pole- Labour cost ---- etc., complete with all leads and lifts as per standard specifications and directions of the Engine...
1.1 kV Ceramic Pin Insulator With GI pin -Material cost ---- etc., complete with all leads and lifts as per standard specifications and directions of the Engineer in-charge of the work
No. 8 Strain insulator-Material cost ---- etc., complete with all leads and lifts as per standard specifications and directions of the Engineer in-charge of the work
Guy set with No. 8 Strain Insulator & Concreting materials as per Dwg No. BESCOM/GM/CP/7 Dt: 24.10.07-
Material cost ---- etc., complete with all leads and lifts as per standard specifications and dir...
Guy set with No. 8 Strain Insulator & Concreting materials as per Dwg No. BESCOM/GM/CP/7 Dt: 24.10.07-Labour charges ---- etc., complete with all leads and lifts as per standard specifications and dir...
ACSR Conductor as per IS-398 (Part - 2/1996)-Rabbit ACSR(6/3.35 mm Al + 1/3.35 mm St), Std Wt: 214 Kg/KM -Material cost ---- etc., complete with all leads and lifts as per standard specifications and ...
Stringing of conductor Rabbit ACSR binding of conductor on each insulator and dead ending on strain or disc/strain insulator by means of clamps.-Labour Charges (Per Km Per Wire) ---- etc., complete wi...
Supervision Charges over the Estimated Cost ---- etc., complete with all leads and lifts as per standard specifications and directions of the Engineer in-charge of the work
Estimate Supervision Charges ---- etc., complete with all leads and lifts as per standard specifications and directions of the Engineer in-charge of the work
Transformer Inspection Charges ---- etc., complete with all leads and lifts as per standard specifications and directions of the Engineer in-charge of the work
D11- LT AC 3 Phase 4 Wire, 5-30 Amps DLMS Complaint Energy Meter, 1.0 Accuracy Class (Used for LT-2, LT-3 & LT-5 Installations up to 25HP/18KW) ---- etc., complete with all leads and lifts as per stan...
Security Deposit-LT-4(a)-Applicable to IP-Sets upto and inclusive of 10HP-Rs.1480.00/HP (Per HP) ---- etc., complete with all leads and lifts as per standard specifications and directions of the Engin...
Electrical Inspectrate Charges Scale of Inspection Fees of Electrical Inspector Rate Schedules: Fees for Initial inspections. ---- etc., complete with all leads and lifts as per standard specification...
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
labour.docx
Others - labour • 0.98 MB
royalty_new.pdf
Others - ROYALTY • 0.23 MB
kw-3_bid document KPPP FORMAT-ele-18.doc
Tender Document • 2.00 MB
e_payment _new.doc
Others - e payment • 0.22 MB
new loc format.pdf
Others - Line of credit • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .