Loading…
Loading…
| # | Company | Amount |
|---|---|---|
| 1 | ₹1.7 Cr | ₹1.7 Cr |
Tender Value
Refer Docs
EMD Value
₹3.1 L
Closing Date
20 Apr 2026, 2:15 pmClosed
UNDER FRAME (EMU B BT)
02261336
02261336
Open - Indigenous
Chennai, Unknown (Unspecified Location)
₹0
₹3.1 L
25 Mar 2026
25 Mar 2026
Description :UNDERFRAME ARRGT FOR MOTOR COACH WITH BT ELEC TO DRG NO (574)ICF/MRVC/M/ BT-1-1-001, COL.I, Alt 'm' THE SCHEDULE OF TECHNICAL REQUIREMENT ASPER ICF/MD/SPECN.147, ISS UE STATUS-01, REV-02 WITH AMENDMENT-02. Special Condition : 1) THE UNDERFRAME SHOULD BE S UPPLIED AS NORMAL SIDE UP AND SIDE BEARER SIDE DOWN. PACKING DRAWING ICFJ&T/MISC-2487, Alt 'b'. STAGE INSPECTION DETAIL ADDED. (a) Raw Material Stage # Ensure the raw material used usin g portable spectrometer (b) Jig stage # Assembly of front part with sole bar. # Assembly of modular fr ame arrangement. # Weld parameters to be checked & recorded (c) Trestle stage # Marking, Drilling & Tapping of holes wherever necessary. # Marking & placing of detail items. # Complete welding whe rever necessary. # Weld parameters to be checked & recorded # Assembly & Welding of trough sheet s. # Dimensional & Visual checks. # Punching of Serial No & ensuring proper traceability. (d) Surface p reparation and painting stage. # Short/Sand blast to the requirements. # Painting process as per the s pecification. # Visual inspection. # Final product Inspection. Note: Application of Aluminium welding co at to RCF spec MDTS-28272 latest revision on top surface of cross members shall be ensured before w elding the trough floor with cross members to avoid bi-metallic corrossion. [SAFETY ITEM] [ Warranty Period: 30 Months after the date of delivery ] [Quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total PO value variation Permitt ed: Max 8 lacs ] ] Consignee Shell Depot/ICF,Chennai, ICF Tamil Nadu 9.00 Numbers UVAM Item ref. ( Item Id :- 2400018 - Under Frame Complete for LHB Coaches , Sub Item Id:-2400018001 - Under Frame Complete for LHB Coaches ) Product Inspection:Stage 1: Raw Material Stage (Ref: Description) (100% of PO Qty ), Inspection Stage 2: Jig Stage (Ref: Description) (100% of PO Qty ), Stage 3: Trestle Stage (Ref: Details Description) (100% of PO Qty ), Stage 4: Surface Preparation & Painting Stage (Ref: Desc) (100% of PO Qty )
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
5720987.pdf
ATTACHMENT
5720988.pdf
ATTACHMENT
5721153.pdf
ATTACHMENT
5720991.pdf
ATTACHMENT
5720992.pdf
ATTACHMENT
5720993.pdf
ATTACHMENT
5721005.pdf
ATTACHMENT
5720997.pdf
ATTACHMENT
5720998.pdf
ATTACHMENT
5720999.pdf
ATTACHMENT
5721001.pdf
ATTACHMENT
5721004.pdf
ATTACHMENT
5720996.pdf
ATTACHMENT
Download all tender documents and submit your bid