Loading…
Loading…
Tender Value
₹33.9 L
EMD Value
₹33,910
Closing Date
30 Jun 2026, 5:30 pmClosed
Divisional Officer
RURAL WORKS DIVISION NO.II, MALKANGIRI
Bhubanpalli - Tamanpalli_Road_Boxcell culvert-1X6X3-_At 2.100 km
2026_CERWI_132272_1
02/2026-27
Open Tender
Civil Works - Roads
Percentage
60 days
Malkangiri
2 documents required · 2 mandatory
₹6,000
₹33,910
Yes
18 Jun 2026
18 Jun 2026
1 Jul 2026
18 Jun 2026
30 Jun 2026
18 Jun 2026
18 Jun 2026 - 29 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling PCC M-15 and M-20 grade work including T & P and scafolding where ever necessary including stacking the useful materials for reuse and removing the debris within all lifts and leads of 1000mtrs | 157.6 | cum | 508.3 | ₹80,108.08 |
| 2 | Earth work in cutting in hard soil within the initial lead and lift including rough dressing and breaking the clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3 Mtr. In depth etc. complete as per direction of the Engineer-in-charge. | 337.31 | cum | 282.88 | ₹95,418.25 |
| 3 | Providing andlaying mannually with sand in regular layers not exceeding 150mm thick including all labour materials T&P royalty etc. | 92.06 | cum | 738.69 | ₹68,003.8 |
| 4 | Cement concrete of M-15 grade with 40mm and down grade black hard granite (crusher broken) stone chips including hoisting and laying etc complete. | 137.19 | cum | 5,637.64 | ₹7,73,439.11 |
| 5 | Cement concrete of M-15 grade with 40mm and down grade black hard granite (crusher broken) stone chips including hoisting and laying etc complete. Above Bed level Sub structure | 69.69 | cum | 5,740.78 | ₹4,00,074.96 |
| 6 | R.C.C. work of M-25 using 20mm and down graded chips including cost of all materials labour T&P etc complete. Below bed level in foundation RAFT | 29.25 | cum | 6,900.37 | ₹2,01,835.82 |
| 7 | R.C.C. work of M-25 using 20mm and down graded chips including cost of all materials labour T&P etc complete.Above bed level Sub Structure Hunch | 27.15 | cum | 8,943.22 | ₹2,42,808.42 |
| 8 | R.C.C. work of M-25 using 20mm and down graded chips including cost of all materials labour T&P etc complete.Deck Slab Super Structure | 35.1 | cum | 9,851.83 | ₹3,45,799.23 |
| 9 | R.C.C. work of M-25 using 20mm and down graded chips including cost of all materials labour T&P etc complete.wearing coat | 4.39 | cum | 6,898.92 | ₹30,265.56 |
| 10 | R.C.C. work of M-25 using 20mm and down graded chips including cost of all materials labour T&P etc complete.Hand Rain | 15.6 | sqm | 2,396.6 | ₹37,386.96 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 4.69 MB
Tendernotice_1.pdf
PDF • 0.81 MB
BOQ_596811.xls
BOQ • 0.33 MB
Corrigendum.pdf
PDF • 1.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .