Loading…
Loading…
Tender Value
₹1.8 Cr
EMD Value
₹3.6 L
Closing Date
1 May 2026, 3:00 pmClosed
BHANU PARKASH SHARMA
Jind PHED No. 1
JITGARH ESTIMATE FOR CONSTRUCTION OF INDEPENDENT CANAL BASED WATER WORKS AND LAYING THE DI PIPE LINES IN VILLAGE JITGARH DISTRICT JIND.
2026_HRY_516352_1
2026FEA8A723 DF93 4A0B 9D71 BECE8EF98C24568PUH
Open Tender
Civil Works
Works
450 days
JITGARH
4 documents required · 4 mandatory
₹15,000
₹3.6 L
Yes
20 Apr 2026
20 Apr 2026
1 May 2026
20 Apr 2026
1 May 2026
20 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | COPPER CABLE: Supply, erection, testing and commissioning of IS marked 3 core Copper Cables, Solid Copper conductor up to 6sqmm and balance Stranded Copper, XLPE Insulated, cores laid up, PVC Inner sheathed, Armoured (Glavanised wire for cables up to 10x1.5sqmm, 8x2.5sqmm, 2x10sqmm, 3x10sqmm, 4x6sqmm and balance all galvanized steel strip), extruded PVC type ST2 Outer Sheathed, /1100 V grade as per IS 7098 (Part 1) 1988 with up to date amendments along with all accessories like thimble lugs etc for motors as per entire satisfaction of Engineer-in-charge complete in all respect. Make:Finolex / Havells / RR Cables. (16 Sqmm size) | - | Per Metre | - | - |
| - | Providing, fixing, lointing, testing of Mechanical joints complete with rubber gaskit, Galvanized nuts and bolts including labor, tranportaion ets up to the site
100 mm nominal diameter | - | NO. | - | - |
| - | `RAW WATER PUMP: Supplying, erection, testing and commissioning of Horizontal motor pumping set for Raw water having head as per the indicated requirements of discharge in LPM and power capacity in BHP as per IS marked ` 500 LPM x 12 m head | - | Each | - | - |
| - | Operation and maintenance of all the proposed structure of both water works and completes cope of the work taken in DNIT(disinfection material supplied by the agency) and complete existing distribution system of the schemes (as per schedule–IV) for a period 5year after 12 Month defect liability period after 3 months trial run period (will be changed to the A/mtc estimate) Operation and maintenance during defect liability period after 3 month trial run period(operation only) | - | Job | - | - |
| - | 1st year Operation and maintenance after defect liability period | - | Job | - | - |
| - | 2nd year Operation and maintenance after defect liability period | - | Job | - | - |
| - | 3rd year Operation and maintenance after defect liability period | - | Job | - | - |
| - | 4th year Operation and maintenance after defect liability period | - | Job | - | - |
| - | 5th year Operation and maintenance after defect liability period | - | Job | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.94 MB
BOQ_595204.xls
BOQ • 0.30 MB
1F4BOQZ154564.pdf
Additional Documents • 1.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .