Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.7 LAccepted-AOC | ₹15.7 L | L1 | Accepted-AOC AWARDED |
| 2 | L2₹15.7 LSame as L1Rejected-Finance PLOT NO 2 VIMPUR MAUZA WARD NO 52 P O P S AIRPORT DIST KHORDHA PIN 751020 | KHORDHA | ODISHA | 751020 | ₹15.7 LSame as L1 | L2 | Rejected-Finance NON RESPONSIVE |
| 3 | L2₹15.7 LSame as L1Rejected-Finance NOT AVAILABLE | NA | NA | 121004 | ₹15.7 LSame as L1 | L2 | Rejected-Finance NON RESPONSIVE |
| 4 | L2₹15.7 LSame as L1Rejected-Finance | ₹15.7 LSame as L1 | L2 | Rejected-Finance NON RESPONSIVE |
| 5 | L2₹15.7 LSame as L1Rejected-Finance | ₹15.7 LSame as L1 | L2 | Rejected-Finance NON RESPONSIVE |
Tender Value
₹24.5 L
EMD Value
₹24,509
Closing Date
2 Mar 2026, 5:00 pmClosed
Superintending Engineer BBSR R and B Divn No II
Office of S E BBSR R and B Divn No II Surya nagar Unit-7
SR to LT Qtr No. IVR-160,224,300,153 at unit-6 (Civil and EI)
2026_EICCL_126290_1
ETCN-47
Open Tender
Civil Works - Buildings
Percentage
90 days
Khordha
2 documents required · 2 mandatory
₹6,000
₹24,509
Yes
15 Jul 2026
19 Feb 2026
5 Mar 2026
19 Feb 2026
2 Mar 2026
19 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Concrete Hallow Block Masonary in C M (1:6) in Superstructure | 9.78 | cum | 4,804.04 | ₹46,983.51 |
| 2 | Dismantling & removing doors, windows, & ventilator including removal of frame, hinges, fastening & stacking the same for reuse and removing the debris with in 50. m Lead. (per 1 Sqm.) (Consider a Door of 1.22 X 2.13 = 2.60 Sqm.) | 9.66 | sqm | 446.37 | ₹4,311.93 |
| 3 | Dressed seasoned Sal wood work framed and fixed ( wrought & put up) in tresses, purlins, frames of doors, windows, ventilators & beams (per 1 Cum.) (Data for 0.028 Cum.) | 0.22 | cum | 1,04,702.67 | ₹23,034.59 |
| 4 | Supplying fitting and fixing of Piasal wood 32 mm panneled shutters with moulded pannels with hard ware fittings including cost of all materials labour,T&P etc complete | 16.06 | sqm | 4,097.16 | ₹65,800.39 |
| 5 | Dismantling & removing of old tile on floor including cost of all labour,T&P required for the work etc complete. | 55.8 | sqm | 141.13 | ₹7,875.05 |
| 6 | Supplying fitting and fixing Virtified Tile Flooring 600x600mm with 20mm CM(1:4) Colour including cost of all materials, labour,T&P required for the work etc complete. | 152.03 | sqm | 1,129.57 | ₹1,71,728.53 |
| 7 | Fixing tiles in dados skirting and risers of steps on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the tiles including rubbing and polishing complete excluding cost of precast tiles. per 1 sqm (Data for 10 sq.mt.) WALL SURFACE | 20.91 | sqm | 1,270.88 | ₹26,574.1 |
| 8 | Labour for scrapping out of old paint from the wall & ceiling surface including cost of all labour,T&P required for the work etc complete | 1,346.6 | sqm | 5.2 | ₹7,002.32 |
| 9 | Distempering two coats over wall surface including cost of all materials labour,T&P required for the work etc complete | 1,019.08 | sqm | 89.26 | ₹90,963.08 |
| 10 | Enamel painting two coats over the wooden & iron surface including cost of all materials labour,T&P required for the work etc complete | 248.76 | sqm | 185.89 | ₹46,242 |
stage.html
html • 0.06 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 0.74 MB
Tendernotice_1.pdf
PDF • 0.04 MB
BOQ_581965.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .