Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.0 LAccepted-AOC 1 SADHANA SOCIETY DEV BAUG DEVBAUG BHAVNAGAR GUJARAT 364001 | BHAVNAGAR | GUJARAT | 364001 | L1 | Accepted-AOC AOC | |
| 2 | L2₹9.8 L+₹1.7 L (21.0%)Rejected-Finance | L2 | Rejected-Finance Other than lowest | |
| 3 | L3₹10.9 L+₹2.7 L (33.8%)Rejected-Finance | L3 | Rejected-Finance Other than lowest | |
| 4 | L4₹11.2 L+₹3.1 L (37.6%)Rejected-Finance 205 IIND PHASE INDUSTRIAL AREA BARMER 344001 | BARMER | BARMER | RAJASTHAN | 344001 | L4 | Rejected-Finance Other than lowest |
| Sl No | Description | Qty | Unit | KRISHNA CONSTRUCTION COMPANY L1 | National Rewinding Works L4 | M.D. CONSTRUCTION CO. L2 | Devi Engineeing L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Comprehensive maintenance/ repair for RO Plant of capacity 5000 Ltrs per hour - 02 Nos as under : (i) Contractor has to provide one service each month by qualified technician (ii) Any complaint shall be attended within 24 Hrs. (iii) Periodical maintenance of cleaning the membrane/ cartridge/ filters with citric acid, washing with high pressure water pump, servicing of chemical dozing systems, calibration of level indicator, valves, greasing of raw water pump, high pressure feed pump, decarburizing of control panel/ LT Panel etc. (iv) Replacement of other major spares as per existing size and capacity shall be measured and paid separately. (v) During dismantling and reassembling, testing of the equipment safety measures shoud be followed and safety equipments like mask, gloves etc shall be provided by contractor and cost of the same shall be deemed to be included in the quoted rates Note: Rate of labour cost for dismantling the spares and assembling the new parts/ system is deemed to be included in the quoted rated of comprehensive maintenance.
Note:Spare parts shall be measured and paid as under as “Supply only” | 6 | Per Month | 7,000 ₹42,000 | 2,000 ₹12,000 Lowest | 4,000 ₹24,000 | 3,000 ₹18,000 |
| 1.01Supply only the following under mentioned spares/ parts in repair for RO Plant 5000 LPH | |||||||
| 1.02 | (i) Cartridge jumbo filter 20"(Micro filter) 5 micron | 16 | Each | 1,100 ₹17,600 | 600 ₹9,600 Lowest | 900 ₹14,400 | 650 ₹10,400 |
| 1.03 | (ii) 80/40 membrane 2 core line as existing size/ capacity | 10 | Each | 45,000 ₹4,50,000 | 55,000 ₹5,50,000 | 40,000 ₹4,00,000 Lowest | 57,000 ₹5,70,000 |
| 1.04 | (iii) PVC rotameter of 40 mm dia range 1500 to 15000 LPH | 4 | Each | 5,500 ₹22,000 | 6,000 ₹24,000 | 5,000 ₹20,000 | 3,500 ₹14,000 Lowest |
| 1.05 | (iv) Multiport valve | 2 | Each | 3,100 ₹6,200 Lowest | 10,000 ₹20,000 | 5,000 ₹10,000 | 5,500 ₹11,000 |
| 1.06 | (v) Anti scaling chemical | 100 | Ltr | 300 ₹30,000 Lowest | 600 ₹60,000 | 450 ₹45,000 | 465 ₹46,500 |
| 2.00 | Repair to ACF by opening the chamber, remove all the materials like activated carbon, media upto bottom of the chamber, cleaning the inner walls by using suiatble cleaning agent, remove the fine deposits, cutting the supporting base by welding, fabricate the supporting base as per existing size and shape, fix to the chamber as before by welding, preparing the surface, painting with two coats enamel paint over one coat of red oxide, replacing the gasket of the opening way, filling the ACFwith media pebbles upto the top by laying in layers as before, close the opening and testing should be carried out upto satisfatcion of Engr-in-Charge. Note: Replacement of ACF 600 and various size of media shall be measured and paid separately | 2 | Each Job | 7,100 ₹14,200 | 10,000 ₹20,000 | 10,000 ₹20,000 | 5,500 ₹11,000 Lowest |
| 2.01 | (i) Activated Carbon 600 | 200 | kg | 70 ₹14,000 Lowest | 350 ₹70,000 | 125 ₹25,000 | 175 ₹35,000 |
| 2.02 | (ii) Media 1 to5 mm | 120 | kg | 35 ₹4,200 Lowest | 120 ₹14,400 | 50 ₹6,000 | 60 ₹7,200 |
Tender Value
₹12 L
EMD Value
₹24,000
Closing Date
16 Jul 2026, 6:00 pmClosed
GE (AF) UTARLAI
GE (AF) UTARLAI PB No. 11 Barmer 344001 (Raj)
REPAIR MAINT OF PUMP, RO PLANT AND CONNECTED ITEMS AT AF STN UTARLAI
2026_MES_771510_1
8114/E8
Open Tender
Civil Works
Item Rate
180 days
Utarlai
As per NIT
9 documents required · 9 mandatory
₹500
GE (AF) UTARLAI
₹24,000
Yes
14 Aug 2026
11 Jun 2026
18 Jul 2026
11 Jun 2026
16 Jul 2026
2 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Comprehensive maintenance/ repair for RO Plant of capacity 5000 Ltrs per hour - 02 Nos as under : (i) Contractor has to provide one service each month by qualified technician (ii) Any complaint shall be attended within 24 Hrs. (iii) Periodical maintenance of cleaning the membrane/ cartridge/ filters with citric acid, washing with high pressure water pump, servicing of chemical dozing systems, calibration of level indicator, valves, greasing of raw water pump, high pressure feed pump, decarburizing of control panel/ LT Panel etc. (iv) Replacement of other major spares as per existing size and capacity shall be measured and paid separately. (v) During dismantling and reassembling, testing of the equipment safety measures shoud be followed and safety equipments like mask, gloves etc shall be provided by contractor and cost of the same shall be deemed to be included in the quoted rates Note: Rate of labour cost for dismantling the spares and assembling the new parts/ system is deemed to be included in the quoted rated of comprehensive maintenance.
Note:Spare parts shall be measured and paid as under as “Supply only” | 6 | Per Month | 10 | ₹60 |
| 1.01 | Supply only the following under mentioned spares/ parts in repair for RO Plant 5000 LPH | - | - | - | - |
| 1.02 | (i) Cartridge jumbo filter 20"(Micro filter) 5 micron | 16 | Each | 10 | ₹160 |
| 1.03 | (ii) 80/40 membrane 2 core line as existing size/ capacity | 10 | Each | 10 | ₹100 |
| 1.04 | (iii) PVC rotameter of 40 mm dia range 1500 to 15000 LPH | 4 | Each | 10 | ₹40 |
| 1.05 | (iv) Multiport valve | 2 | Each | 10 | ₹20 |
| 1.06 | (v) Anti scaling chemical | 100 | Ltr | 10 | ₹1,000 |
| 2 | Repair to ACF by opening the chamber, remove all the materials like activated carbon, media upto bottom of the chamber, cleaning the inner walls by using suiatble cleaning agent, remove the fine deposits, cutting the supporting base by welding, fabricate the supporting base as per existing size and shape, fix to the chamber as before by welding, preparing the surface, painting with two coats enamel paint over one coat of red oxide, replacing the gasket of the opening way, filling the ACFwith media pebbles upto the top by laying in layers as before, close the opening and testing should be carried out upto satisfatcion of Engr-in-Charge. Note: Replacement of ACF 600 and various size of media shall be measured and paid separately | 2 | Each Job | 10 | ₹20 |
| 2.01 | (i) Activated Carbon 600 | 200 | kg | 10 | ₹2,000 |
| 2.02 | (ii) Media 1 to5 mm | 120 | kg | 10 | ₹1,200 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.20 MB
BOQ_863943.xls
BOQ • 1.43 MB
Tenderdocument.pdf
Tender Documents • 0.62 MB
AMD8114.pdf
PDF • 0.55 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .