| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹81.4 LAccepted-AOC | L1 | Accepted-AOC Lowest Bidder | |
| 2 | L2₹81.8 L+₹40,161.47 (0.49%)Rejected-AOC DOOR NO 7 345 SURVEY NO 7 345 P P COLONY | PONDICHERRY | PUDUCHERRY | 605001 | L2 | Rejected-AOC Highest Bidder |
Tender Value
₹82.5 L
EMD Value
₹83,000
Closing Date
3 May 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Project Director DRDA
The Project Director DRDA
Upgradation / Strengthening/ Renewal of 3 roads including 5 years routine maintenance after completion under Package no. 40/MGSMT/2022-23 in Tirupathur Block of Tirupathur District under MGSMT 2022-23.
2023_RDTN_303584_1
E1/0802/2023
Open Tender
Civil Works
Item Rate
180 days
DRDA
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹83,000
13 Jul 2023
18 Apr 2023
3 May 2023
18 Apr 2023
3 May 2023
18 Apr 2023
Amount
Clearing the scrub jungles including cutting the scrubs and removing away from site etc complete
Earthwork excavation in all classes of soils and including shoring and strutting with initial lead and lift subsoils etc complte, as per MOST specification asper SS20 A.
Picking 5 cm to 10 cm old metalled surface and sectioning etc complete.
Collection and supply gravel from appd quarry including cost and conveyance of all materials to site including all labour charges etc
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel
Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in Central Hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix
Road marking with hot applied Thermoplastic compound with reflecting glass beads on bituminous surface including cost and all labour charges etc.,
Provision of 15 No's rumble strips covered with premix bitumnous carpet 15-20 mm height at centre, 250 mm wide placed at 1 m centre to centre at approved locations to control speed,marked with white strips of road marking Pint
Provision for H.M. stone
Construction of Retaining Wall at Ch.15 to 35 m R.
Earth work excavation and depositing on bank with initial lead of 10m initial lift of 2m in Hard stiff clay soil etc complete for open foundation as per SS
Supply and Filling with river Sand including cost and conveyance of sand and labour charges charges for filling raming andete. Complete
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.20 m height for plane surface in all floors with all cross bracing using mild steel of size 0.90 cm x 60 cm and 10 guage stilfaned welded with mild steel angles of size 25 min x 25 mm x 3 mm for boarding laid over silver oak (c-word) joint of size 10 cm x 6.50 cm dia spaced about enter to center and supported by casuarinas propels of 10 cm to 13 cm dia spaced at 75 cm center to center etc., complete complying with std. specification and as directed for the following items
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and 5 conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Supply and fixing of weep holes using 90mm PVC Pipes including cost of all
Filter media behind abutments, wing or retaining wall complete as per drawing
Construction of 1.5m Span Culvert at Ch.365m
Dismantling of existing structures like culverts, bridges, retaining walls and Breath Depth other structure comprising of masonry, cement concrete, wood work.
Dismantling of existing structures like culverts, bridges, retaining walls other structures comprising of brick masonry, including disposal
Dismantling of existing structures like pipe culverts, Cutstone culverts,slab culverts, bridges, retaining walls and other structure Abutment
Earth work excavation and depositing on bank with initial lead of 10m initial lift of 2m in Hard stiff clay soil etc complete for open foundation as per SS
Supply and Filling with river Sand including cost and conveyance of sand and labour charges charges for filling raming andete. complete Foundation
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc, complete
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.20 m height for plane surface in all floors with all cross bracing using mild steel of size 0.90 cm x 60 cm and 10 guage stilfaned welded with mild steel angles of size 25
Slab Centring
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and First Footing
Plain Cement Concrete 1:2:4 mix using 20 mm ISS sine HBG metal including cost and conveyace of all materials and all labour charges,etc Complete,
Supply and fabrication of steel for RCC items including cost and conveyance of binding wire, etc., complete
RCC 1:1.53 mix using 20 mm ISS sine HBG metal including cost and conveyace of all materials and all labour charges,etc.
Provision for Sign Board
Providing Name board cum Citizen Board
Routine Maintenance
For the First Year from the date of completion of work
For the Second Year from the date of cpmpletion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
Clearing the scrub jungles including cutting the scrubs and removing away from site etc complete
Earthwork excavation in all classes of soils and including shoring and strutting with initial lead and lift subsoils etc complte, as per MOST specification asper SS20 A.
Picking 5 cm to 10 cm old metalled surface and sectioning etc complete.
Collection and supply gravel from appd quarry including cost and conveyance of all materials to site including all labour charges etc
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel
Providing and laying Premix Carpet with Seal Coat Type -A to 20mm thick using 0.18cum of 13.2mm, 0.09 cum of 11.20mm and .09cum of 6.70mm with 23.232 Kgs of VG 30 Bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in Central Hot Mix Plant 20-30T capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 20mm with mechanical paver to the specified grades and cross section and consolidated by 8-10T vibratory/pneumatic roller to the required density etc., including labour for attending to paver to site, hire & fuel charges for 20-30T CMP with bitumen boiler, tipper trucks, paver finisher, vibratory/pneumatic roller and all other tools and plants required, including fuel and other incidental charges etc., complete .
Road marking with hot applied Thermoplastic compound with reflecting glass beads on bituminous surface including cost and all labour charges etc.,
Provision of 15 No's rumble strips covered with premix bitumnous carpet 15-20 mm height at centre, 250 mm wide placed at 1 m centre to centre at approved locations to control speed,marked with white strips of road marking Pint
Provision for H.M. stone
Provision for K.M. stone
Provision for Guard Stone.
Provision for Hard Bed Ch 60-80 m
Earth work excavation and depositing on bank with in initial lead and inits litter 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth his small sired boulders and hard gravelly soil as per SS 201
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.20 m height for plane surface in all floors with all cross bracing using mild steel of size 0.90 cm x 60 cm and 10 guage stilfaned welded with mild steel angles of size 25 mm x 25
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance fell materials and all labour charges for mixing laying and compacting ele, complete
Un reinforced cement concrete 1:1.5:3 mix using 20 mm ISS sine HG metal including cost and conveyace of all materials and all labour charges,etc,
Provision for Sign Board
Providing Name board cum Citizen Board
Routine Maintenance
For the First Year from the date of completion of work
For the Second Year from the date of cpmpletion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
Clearing the scrub jungles including cutting the scrubs and removing away from site etc complete
Earthwork excavation in all classes of soils and including shoring and strutting with initial lead and lift subsoils etc complte, as per MOST specification asper SS20 A.
Picking 5 cm to 10 cm old metalled surface and sectioning etc complete.
Collection and supply gravel from appd quarry including cost and conveyance of all materials to site including all labour charges etc
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel
Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in Central Hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix
Road marking with hot applied Thermoplastic compound with reflecting glass beads on bituminous surface including cost and all labour charges etc.,
Provision of 15 No's rumble strips covered with premix bitumnous carpet 15-20 mm height at centre, 250 mm wide placed at 1 m centre to centre at approved locations to control speed,marked with white strips of road marking Pint
Provision for H.M. stone
Provision forGuardstone
Construction of 1.50 m Span Culvert at Ch 320 m
Dismantling of existing structures like culverts, bridges, retaining walls and Breath Depth other structure comprising of masonry, cement concrete, wood work.
Dismantling of existing structures like culverts, bridges, retaining walls other structures comprising of brick masonry, including disposal
Dismantling of existing structures like pipe culverts, Cutstone culverts,slab culverts, bridges, retaining walls and other structure Abutment
Earth work excavation and depositing on bank with initial lead of 10m initial lift of 2m in Hard stiff clay soil etc complete for open foundation as per SS
Supply and Filling with river Sand including cost and conveyance of sand and labour charges charges for filling raming andete. complete Foundation
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc, complete
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.20 m height for plane surface in all floors with all cross bracing using mild steel of size 0.90 cm x 60 cm and 10 guage stilfaned welded with mild steel angles of size 25
Slab Centring
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and First Footing
Plain Cement Concrete 1:2:4 mix using 20 mm ISS sine HBG metal including cost and conveyace of all materials and all labour charges,etc Complete,
Supply and fabrication of steel for RCC items including cost and conveyance of binding wire, etc., complete
RCC 1:1.53 mix using 20 mm ISS sine HBG metal including cost and conveyace of all materials and all labour charges,etc.
Provision Sign board
Providing Name board cum Citizen Board
Routine Maintenance
For the First Year from the date of completion of work
For the Second Year from the date of cpmpletion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .