Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.6 LAccepted-Finance | L1 | Accepted-Finance Rate quoted is lowest | |
| 2 | L2₹16.3 L+₹2.8 L (20.3%)Accepted-Finance 01 KATYANI CONSTRUCTION COMPANY H NO 1 SHOP NO 1 RATAN LAL NAGAR KANPUR NAGAR UTTAR PRADESH 208022 | KANPUR NAGAR | UTTAR PRADESH | 208022 | L2 | Accepted-Finance Rate quoted is second lowest | |
| 3 | L3₹17.2 L+₹3.6 L (26.8%)Accepted-Finance | L3 | Accepted-Finance Rate quoted is third lowest | |
| 4 | L4₹19.9 L+₹6.3 L (46.7%)Accepted-Finance | L4 | Accepted-Finance Rate quoted is second highest | |
| 5 | L5₹20.1 L+₹6.5 L (48.2%)Accepted-Finance | L5 | Accepted-Finance Rate quoted is highest |
Tender Value
Refer Docs
EMD Value
₹21,000
Closing Date
15 Jan 2021, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
SE ETC Sultanpur 400KV S/S Campus Payagipur Sultanpur
Installation, erection and commissioning of 100MVA T/F and other associated works at 220KV S/S New Tanda Under ETD, Ayodhya
2020_UPTCL_541909_1
S.T. T.No. 98/ETCS/2020-21
Open Tender
Electrical Works
Item Wise
30 days
Sultanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,478
SE ETC Sultanpur
₹21,000
16 Jan 2021
30 Dec 2020
16 Jan 2021
30 Dec 2020
15 Jan 2021
30 Dec 2020
30 Dec 2020 - 15 Jan 2021
180 days
Amount
Following Works are to be carried out for installation, Gasket replacement, erection, testing & commissioning of 100 MVA 220 / 132 KV T/F (BHEL make) including carriage from 400 K.V. S/S Unnao to 220 K.V. S/S New Tanda, Ambedkar Nagar along with loading & unloading on Carriage Vehicle ,Dismantling & Shifting of defective 160 MVA 220/132 KV (BBL MAKE) T/Fand other associated works at 220 K.V. S/S New Tanda, Ambedkar Nagar with all cost of men & CFM Operator, misc. consumables, T&P, Crane, Centrifuging Machine, Carriage Vehicle / Trailer etc. to complete the job satisfactorily :
Draining of complete oil from conservator, radiator and pipe lines, from 160 MVA Transformer at 220 KV S/S New Tanda into 209 Litre drums and again fill in main tank after shifting of T/F. Remaining oil storage at proper safe place as directed by engineer in charge.
Dismantling of 160 MVA T/F and accessories removing the Radiator, Conservator Tank, A Frame, Header, Bushing, Pipe line, Pump, Cooling Fan including packing of HV/LV bushing and shifting and Stacking.
Dismantling of mulsifire pipe lines, Q.B Detector, Spray nozzles of 160MVA Transformer including its shifting and Stacking.
Shifting of 160 MVA T/F main tank from plinth to near 20 Mtrs.
Additional Shifting of T/F Tank upto 50 Meter distance (1 Job. for every 5 Meter)
Dismantling of RTCC Panel of 160 MVA T/F storage at proper safe place as directed by engineer in charge.
Dismantling & re erection of 132 KV LA upon Structure and proper tightening
Draining of complete oil from Main Tank of 100 MVA T/F at 400 K.V. S/S Unnao into 209 Ltr. capacity Oil Drums to be provided by Department.
Creating complete vacuum in empty Main Tank of 100 MVA T/F and filling of dry Nitrogen Gas having minimum 500C DEW point upto 0.25 Kg / cm2 pressure and maintaining during transportation upto 220 K.V. Sub Station New Tanda by mounting pressurised N2 Cylinder.
Shifting / Dragging of Main Tank of 100 MVA, 220 / 132 KV T/F (BHEL make) upto 20 Meter distance including turning of the T/F Tank, as required alongwith associated accessories from existing place to near open space / safe loading place at 400 K.V. S/S Unnao with all due care of safety & precautions.
Additional Shifting of T/F Tank upto 30 Meter distance (1 Job. for every 5 Meter)
Loading of Tank of above 100 MVA T/F on Trailer and other all accessories on Truck at 400 K.V. S/S Unnao including jacking the T/F Tank for placing of Wooden Sleepers / Planks under the T/F Tank and lifting the T/F Tank by continuous jacking & placing the Wooden Sleepers / Planks, till the Wooden Platform comes upto height of the Trailer's bed, then placing of Rails over Wooden Sleepers / Planks & Trailer's bed for shifting the T/F Tank from Wooden Platform to Trailer's bed and removal of Rails after proper placing of T/F Tank on Trailer's bed and finally, proper tightening / anchoring of the T/F Tank on Trailer with the help of Steel Wire Rope & Heavy Turn Buckle for safe transportation including loading of other accessories of the T/F on Trailer / Trucks, with all due care of safety & precautions.
Safe carriage of Main Tank of above 100 MVA T/F alongwith all accessories after necessary packing as needed including T/F Oil in drums of the T/F by suitable Trailer & Trucks to be arranged by the Contractor from 400 K.V. S/S Unnao to 220 K.V. S/S New Tanda (approx. travel distance 285 Km), with all due care of safety & precautions including arranging of Transit Insurance.
Unloading of Main Tank & other all accessories of above 100 MVA T/F from Trailer/Truck after opening of lashing of Main Tank, jacking the T/F Tank for placing the Rails under the Tank for shifting of same to Wooden Platform, removing the Rails after shifting of the Tank on Wooden Platform, lowering the T/F Tank towards ground by slowly jacking & removing the Wooden Sleepers / Planks from under the Tank including all accessories from the Trailer / Trucks at safe unloading place at 220 K.V. S/S New Tanda, with all due care of safety & precautions.
Shifting of Main Tank of above 100 MVA T/F upto 20 Meter distance from unloading place towards Plinth including turning of the T/F Tank, as required alongwith all associated accessories at 220 K.V. S/S New Tanda, with all due care of safety & precautions, with all cost of men, T&P and other associated works required to complete the job satisfactorily.
Additional Shifting of T/F Tank upto 30 Meter distance (1 Job. for every 5 Meter)
Replacement of old & damaged 'O' Ring type top cover Gasket size 12 mm / 16 mm including dismantling / required lifting of top cover after opening of Nut & Bolts, removal of old 'O' Ring Gasket, cleaning of surface, providing, making & fixing of good quality neoprine rubber 'O' Ring top cover Gasket and fitting back of the top cover plate after completion of the work.
Replacement of old Erection Gaskets of Radiators / Bushings / Pipelines of the T/F by Providing & Fixing of new Rubberized Cork Sheet Gaskets of standard make, with all cost of men, material, T&P and other associated works required to complete the job satisfactorily.
Overhauling of the Diverter Switch including removal of the Diverter Switch Assembly after opening of the top cover of OLTC Tank, cleaning by hot oil, attending of Diverter Switch trouble if any and finally reassembly of the complete Diverter Switch using new Gaskets / 'O' Rings as per requirement.
Complete Erection of the 100 MVA 220 / 132 KV T/F including its Bushings, Headers, Radiators, Conservator Tank, Turrets, Oil Pipe Lines, Buchholz Relay, Motor Drive Mechanism of OLTC, Cooling Fans, Oil Pump etc. complete in all respect to complete the job satisfactorily as per technical specifications.
Complete evacuation of 100 MVA T/F Main Tank and filling of dry air of DEW Point - 400C or better in vacuum up to pressure of 0.25 Kg / cm2 and the again evacuating the T/F Tank after required time interval (approx. 12 / 24 Hrs.) using centrifuging machine. The work shall including connecting pipe of machine as required measuring DEW Point values of dry air after every cycle till the required value is achieved (01 Job for each cycle).
Safe Carriage of 20 KL Transformer Oil Tank for Centrifuging of the Transformer Oil from other Sub Stations including Loading & Unloading (approx. distance 30 Km).
Transformer Oil preparation before filling into Transformer including transfer of fresh Transformer Oil from 209 Ltr. Oil Drums into 20 KL Tanks then dehydration of the Transformer Oil by Ultra High Vacuum Oil Filtration Plant after connecting the Centrifuging Pipes between Oil Tanker & Oil Filtration Plant including taking the BDV Values of Oil periodically till the required value is achieved and then Filling & Topping up of the Transformer Oil in Main Tank, Radiator, Conservator Tank etc. with all cost of Centrifuging Machine, CFM Operator, Lubricants etc.
Dehydration of 100 MVA T/F by centrifuging of the complete T/F Oil duly filled in T/F using Ultra High Vacuum Oil Filtration Plant after connecting the Centrifuging Pipes between T/F Tank & Oil Filtration Plant including taking the BDV Values of Oil and Meggering of T/F Bushings periodically till the required values are achieved including Oil in Radiators, OLTC & Conservator.
Complete Earthing of the 100 MVA T/F using 50x6 mm / 75x10 mm size M.S. Flats as per standard practice as detailed below :
Earthing of Main Tank of the Transformer, RTCC Panel, Marshalling Box, Drive Mechanism of the Cooling Fans etc. and its connection with already laid Earthmat as per standard practice.
Making of Delta for Neutral Earthing (HV & IV) by due fabrication of 3 No. 3.5 Meter long Electrodes of 36 / 40 mm dia. M.S. Round Bar, its piercing under the ground at equal distance of 1 Meter at 700 mm depth by digging of earth and connecting all the 3 No. Electrodes with 75 mm x 10 mm size M.S. Flat & connecting with existing Earthmat and taking out Riser by due cutting, bending, welding etc. as per Technical Specifications. M.S. Round Bar / Flat shall be provided by Department. (1 Job for each Delta for Earthing)
Erection of RTCC Panel of 100 MVA T/F in control Room including its earthing as per standard practice.
New Jumpering of the 100 MVA Transformer with associated Terminal Connector & PG Clamps etc. to connect the HV & LV Bushings with 220 K.V. & 132 K.V. Jack Bus Bar / CTs by fabricating new Jumper using 'Moose' / 'Zebra' Conductor as per requirement.
Termination with proper ferruling as per drawing of above laid cables in between Turrets, WTI, OTI, Bucholz Relays PRV, Coolling Fans, Pumps, OLTC, Marshalling Box, RTCC Panel etc. including laying of cables for 100 MVA Transformer mountings upto Marshelling Box.
Conducting test by arranging appropriate equipment for following testing- 1-. WRM 2- Tan Delta 3- SFRA
Conducting testing by arranging appropriate equipment for following testing- DGA,BDV,PPM by approved Lab.
Katyani Construction Co.
SHIVAM ENGINEERS
Omurmila Constructions
Ajanta Engineering works
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .