| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹72.7 LAccepted-AOC 1 49 MELEGOUNDANPALAYAM METTUPALAYAM KINATHUKADAVU 642110 | COIMBATORE | TAMIL NADU | 642110 | L1 | Accepted-AOC Accepted | |
| 2 | L2₹73.1 L+₹44,770.70 (0.62%)Rejected-Finance 2 1 MIN NAGAR KOTTUR ROAD SULEESWARANPATTI POLLACHI 624006 | 624006 | L2 | Rejected-Finance Rejected |
Tender Value
₹73.7 L
EMD Value
₹74,000
Closing Date
12 Jul 2024, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Additional Collector (Dev)
DRDA, Coimbatore
Strengthening the 3 nos of road in Pollachi (North) Block - Package No TN 02-23 inPollachi (North) Block of Coimbatore District under MGSMT 2024-2025
2024_RDTN_459332_1
DIPR/2074/Tender/2024 Dated 26.06.2024
Open Tender
Civil Works - Roads
Item Rate
180 days
DRDA Coimbatore
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹74,000
DRDA, Coimbatore
26 Sept 2024
2 Jul 2024
12 Jul 2024
2 Jul 2024
12 Jul 2024
4 Jul 2024
4 Jul 2024
Amount
1.Strengthening the road from Pollachi - Palakkadu main road to Ponnayur Paraimeedu ( R462) K/M 0/0 - 0/750
Clearing the scrub jungle by uprooting including all cutting charges and disposing of the products and clearing as directed by departmental officers including all incidental charges etc. complete.
picking 5cm to 10cm old metalled surface and sectioning -1sqm
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
Road marking by providingand laying of hot applied Thermoplastic compound 2.5mm thick including reflectorising glass beads @250mm etc complete.,
Supplying and fixing of Hecta Metre stones including painting and lettering as directed by the departmental officers etc., complete
Cautionary Sign Board-Provoiding and erecting of retro-reflectrised mandatory and informatory sings(without definition sign) including all charges etc .,
90cm equlateral triangle(WOD)
60cm equlateral triangle(WOD)
60cm equlateralcircular(W0D)
60cm equlateral triangle(WD)
Providing and fixing of reflective road studs of categoryA raised pavement makers made out ofpolycarbonate/methyl /ABSmoulded body confirming to ASTM d
Provision of 5 nos. Rumble strips covered with premix bituminous carpet, 15-20 mm high at centre,250mm wide placed at 1m c/c at approval locations to control speed, marked with white strips of road marking paint.
Provision for Name Board
2.Strengthening to the road from Orakaliyur to Ponnayur-Singanallur Road ( R158) K/M0/0-0/940
Clearing the scrub jungle by uprooting including all cutting charges and disposing of the products and clearing as directed by departmental officers including all incidental charges etc. complete.
picking 5cm to 10cm old metalled surface and sectioning -1sqm
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
Road marking by providingand laying of hot applied Thermoplastic compound 2.5mm thick including reflectorising glass beads @250mm etc complete.,
Supplying and fixing of Hecta Metre stones including painting and lettering as directed by the departmental officers etc., complete
Provision for Name Board
Cautionary Sign Board-Provoiding and erecting of retro-reflectrised mandatory and informatory sings(without definition sign) including all charges etc .,
90cm equlateral triangle(WOD)
60cm equlateral triangle(WOD)
60cm equlateralcircular(W0D)
60cm equlateral triangle(WD)
Providing and fixing of reflective road studs of categoryA raised pavement makers made out ofpolycarbonate/methyl /ABSmoulded body confirming to ASTM d
Provision of 5 nos. Rumble strips covered with premix bituminous carpet, 15-20 mm high at centre,250mm wide placed at 1m c/c at approval locations to control speed, marked with white strips of road marking paint.
3.Strengthening the road from Pollachi - Naduppuni road (Mappillaigoundenpudur) to Thangappa Thottam (R134) K/M0/0-0/760
Clearing the scrub jungle by uprooting including all cutting charges and disposing of the products and clearing as directed by departmental officers including all incidental charges etc. complete.
picking 5cm to 10cm old metalled surface and sectioning -1sqm
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
Road marking by providingand laying of hot applied Thermoplastic compound 2.5mm thick including reflectorising glass beads @250mm etc complete.,
Supplying and fixing of Hecta Metre stones including painting and lettering as directed by the departmental officers etc., complete
Cautionary Sign Board-Provoiding and erecting of retro-reflectrised mandatory and informatory sings(without definition sign) including all charges etc .,
90cm equlateral triangle(WOD)
60cm equlateral triangle(WOD)
60cm equlateralcircular(W0D)
60cm equlateral triangle(WD)
Providing and fixing of reflective road studs of categoryA raised pavement makers made out ofpolycarbonate/methyl /ABSmoulded body confirming to ASTM d
Provision of 5 nos. Rumble strips covered with premix bituminous carpet, 15-20 mm high at centre,250mm wide placed at 1m c/c at approval locations to control speed, marked with white strips of road marking paint.
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
M/S THANGARAJ & CO (BID ID -1079066)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .