Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance 54 PON NAGAR ARAVAKURICHI KARUR | ARAVAKURICHI | KARUR | TAMIL NADU | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹42,300
Closing Date
13 Jul 2023, 5:45 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Block Development Officer(V.P)
Block Development Office, Aravakurichi Block
Construction of CC Road and Threshing floor 8 Nos of work in Modakkur West Panchayat Package No.02
2023_RDTN_333570_2
Aravakurichi Block -AGAMT-II-2023-24
Open Tender
Civil Works
Item Rate
90 days
Aravakurichi Block
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹42,300
Yes
17 Jul 2023
30 Jun 2023
14 Jul 2023
30 Jun 2023
13 Jul 2023
30 Jun 2023
Amount
Name of the Work : Providing CC road from BT road to Perumal kovil & branch (145m) at Rengapalayam in Modakkur West Panchayat
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stuff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Cement concrete 1:3:6 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc..
Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc..
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Name of the Work : Providing CC road from Jayaraj House to Manivel house and Branch road (76m) at Manarpatty in Modakkur West Panchayat
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stuff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc..
Cement concrete 1:3:6 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc..
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Towards the cost for Supply of PVC pipe and specials
Towards the cost for Supply of Rcc pipe including all charges etc complete
Name of the Work : Provding CC road from Sivaraj House to Tamilselvan House (50m) at Rengapalayam in Modakkur West Panchayat
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stuff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc..
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Name of the Work : Providing CC road from BT road to Temple (120m) at Palanigoundanpudhur in Modakkur West Panchayat
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stuff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Cement concrete 1:3:6 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc..
Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc..
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Name of the Work : Provding CC road from Kovilur road to Gengusamy house (75m) at M.Alamarathupatty in Modakkur West Panchayat
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stuff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc..
Cement concrete 1:3:6 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc..
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Name of the Work : Providing CC road from BT road to Subramani House (96m) at Palanigoundanpudhur in Modakkur West Panchayat
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stuff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc..
Supplying and erecting for centering for sides soffits including Supports and Strutting upto 3.00m height for plane surfaces and all labour charges etc.,
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Name of the Work : Construction of Waiting hall at Manarpatty Burial Ground in Modakkur West Panchayat
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stuff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Refilling the foundation and basement with excavated earth including watering wherever necessary and laid in layers of not more than 15cm thick, compacting etc., complete complying with standard specifications and as directed.
Brickwork in cm 1:5 (one cement and five sand) using countrybricks groundmoulded of size 23x11x7cm. For the following including curing, etc., complete complying with standard specification.
R.C.C. 1:1 1/2:3 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Supplying and fabricating, placing in position m.s. or R.T.S for all Reinforced cement concrete works as per the design given including the cost of steel and bindingwire in all floors etc., complete complying with standard specification.
Supplying ertecting and shuttering including necessary supports for plan surface in foundation and basement and in all floors for slabs and beams complying with standard specifications (Footing sides)
Plastering with C.M 1:3, mix 10mm thick including cost and conveyance of all materials to site and all labour charges etc., complete.
Plastering with C.M 1:5, mix 12mm thick including cost and conveyance of all materials to site and all labour charges etc., complete.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Finishing the top one course of ornamental decorative tiles of size 20x15 cm in cement mortar 1:3 to 12mm thick including cost and conveyance of all meterials to site and labour charges etc complete
Painting two coats with approved oil bound distember over new cement plastered wall surface and ceiling including cleaning preparing the surface and curing etc., complete.
Painting two coats with ready mixed Exterior Emulsion paint of approved qualityand colour over a priming coat, including through scrapping,clean removel of dirt etc complete
Sub Estimate-Compound wall
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stuff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Brickwork in cm 1:5 (one cement and five sand) using countrybricks groundmoulded of size 23x11x7cm. For the following including curing, etc., complete complying with standard specification.
Plastering with C.M 1:5, mix 12mm thick including cost and conveyance of all materials to site and all labour charges etc., complete.
Painting two coats with ready mixed Exterior Emulsion paint of approved qualityand colour over a priming coat, including through scrapping,clean removel of dirt etc complete
Sub Estimate - CC road
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stuff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc..
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Name of the Work : Construction of Threshing Floor at Manapatty in Modakkur West Panchayat
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stuff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Refilling the foundation and basement with excavated earth including watering wherever necessary and laid in layers of not more than 15cm thick, compacting etc., complete complying with standard specifications and as directed.
Supplying ertecting and shuttering including necessary supports for plan surface in foundation and basement and in all floors for slabs and beams complying with standard specifications (Outer wall & Wearing coat)
Supplying ertecting and shuttering including necessary supports for plan surface in foundation and basement and in all floors for slabs and beams complying with standard specifications (Footing sides)
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Painting two coats with ready mixed Exterior Emulsion paint of approved qualityand colour over a priming coat, including through scrapping,clean removel of dirt etc complete
GST Amount for providing Service to Government Contract Works for the above ConstructionWorks. GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
SELVAKUMAR CONSTRUCTIONS
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .