Tender Value
₹6.9 Cr
EMD Value
₹13.8 L
Closing Date
30 Sept 2026, 12:00 pm
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Revenue
Above/Below/Par
TRD
14 conditions · 3 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from CharteredAccountant duly supported by Audited Balance Sheet.
The tenderer must have successfully completed or substantiallycompleted any one of the following categories of work(s) during last 07(seven) years, ending last day of month previous to the one in whichtender is invited: (i)Three similar works each costing not less than theamount equal to 30% of advertised value of the tender, or (ii)Two similarworks each costing not less than the amount equal to 40% of advertisedvalue of the tender, or (iii)One similar work costing not less than theamount equal to 60% of advertised value of the tender. *Similar Work means - (i) Erection and commissioning/ modification/ Augmentation/AMC/Replacement of equipment on 25 kV and /or 2x25 kV Traction Sub-station/Sectioning and Paralleling Post/Sub- sectioning and Paralleling Post OR (ii) Erection and Commissioning / Modification/ Augmentation/ Operation/Maintenance / AMC/Replacement of equipment on Sub-station of 66 kV or above"
The Tenderer/Firm must have valid Electrical Contractor License (ECL) and copy of license must be uploaded in IREPS site during bid. In case Tenderers submitted with ECL issued in the name of other firms/ tenderers will be summarily rejected. In case the ECL is not valid on the date of opening of tender, details of renewal should be submitted.
16 conditions · 10 needing a document upload
I/ We have read the check list and furnish the documents as per check list.
Goods & Services Tax (GST) registration certificate copy should be attached.
In case of Sole Proprietorship Concern firm has to submit Affidavit certifying the sole Proprietorship of the firm. This affidavit shall be notarized. Or In case of a Partnership Firm, Firm has to submit (a) Notary certified copy of the Partnership Deed. (b) A copy of power of Attorney firm has to submit (duly registered as per prevailing Law) in favour of an individual to tender for the work, sign the agreement etc., and create liability against the Firm. Or In case Tenderer is a Company registered under Companies Act-2013. The tenderer shall submit: (a)The copies of MOA (Memorandum of Association)/AOA (Articles of Association) of the company.(b) A copy of Certificate of Incorporation. (c) A copy of authorization/ Power of Attorney issued by the Company (backed by the resolution of board of Directors) in favour of the individual to sign the tender on behalf of company and create liability against the company. Or In case Tenderer is LLP (Limited Liability Partnership); If the tender is submitted on behalf of a LLP registered under LLP Act-2008, the Tenderer shall submit along with tender: (a) A copy of LLP Agreement (b) A copy of Certificate of Incorporation (c) A copy of Power of Attorney/Authorization issued by the LLP in favour of the individual to sign the tender on behalf of the LLP and create liability against the LLP. Or In case of a tenderer is registered Society and Registered trust. The tenderer shall submit: (a) A copy of certificate of registration. (b) A copy of Memorandum of Association of Society/Trust Deed (c)A copy of Power of Attorney in favour of the individual to sign the tender documents and create liability against the society/ Trust.
PAN Card copy should be attached.
EPFO registration certificate copy should be attached.
ESI registration certificate copy should be attached.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
OutSourcing of maintenance activities of Power Supply Installation (PSI) assets over Raipur Division for 2 Years.
TRD-R-2026-E07~SECR
TRD-R-2026-E07
Open
Works - General
24 Months
Raipur, Chhattisgarh
₹0
₹13.8 L
31 Aug 2026
31 Aug 2026
16 Sept 2026
460 items across 2 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 3,60,09,444.1 | ||
| — | 160.00 | — | — | ||
| Monthly Maintenance of Power Transformer | — | — | — | 3,69,600 | |
| — | 16.00 | — | — | ||
| Half yearly Maintenance of Power Transformer | — | — | — | 46,096 | |
| — | 16.00 | — | — | ||
| Yearly Maintenance of Power Transformer | — | — | — | 72,064 | |
| — | 160.00 | — | — | ||
| Monthly Maintenance of HV CB | — | — | — | 87,360 | |
| — | 16.00 | — | — | ||
| Half yearly Maintenance of HV CB | — | — | — | 44,352 | |
| — | 16.00 | — | — | ||
| Yearly Maintenance of HV CB | — | — | — | 54,208 | |
| — | 34.00 | — | — | ||
| Yearly Maintenance of HV Double pole Isolator | — | — | — | 55,148 | |
| — | 96.00 | — | — | ||
| Quarterly Maintenance of HV CT | — | — | — | 68,448 | |
| — | 96.00 | — | — | ||
| Yearly Maintenance of HV CT | — | — | — | 1,38,336 | |
| — | 32.00 | — | — | ||
| Yearly Maintenance of HV Lightening Arrestor | — | — | — | 46,112 | |
| — | 640.00 | — | — | ||
| Monthly Maintenance of LV CB | — | — | — | 3,49,440 | |
| — | 64.00 | — | — | ||
| Half yearly Maintenance of LV CB | — | — | — | 78,848 | |
| — | 64.00 | — | — | ||
| Yearly Maintenance of LV CB | — | — | — | 1,77,408 | |
| — | 252.00 | — | — | ||
| Quarterly Maintenance of LV CT | — | — | — | 1,94,040 | |
| — | 252.00 | — | — | ||
| Yearly Maintenance of LV CT | — | — | — | 3,63,132 | |
| — | 264.00 | — | — | ||
| Yearly Maintenance of LV Lightening Arrestor | — | — | — | 2,36,016 | |
| — | 376.00 | — | — | ||
| Yearly Maintenance of 25 kV Single/Double Pole Isolator | — | — | — | 6,58,000 | |
| — | 180.00 | — | — | ||
| Quarterly Maintenance of Feeder PT-(Type-II) | — | — | — | 1,28,340 | |
| — | 60.00 | — | — | ||
| Yearly Maintenance of Feeder PT-(Type-II) | — | — | — | 86,460 | |
| — | 2500.00 | — | — | ||
| Monthly Maintenance of Interruptor (BM/BX) | — | — | — | 13,67,500 | |
| — | 250.00 | — | — | ||
| Half yearly Maintenance of Interruptor (BM/BX) | — | — | — | 3,08,000 | |
| — | 250.00 | — | — | ||
| Yearly Maintenance of Interruptor (BM/BX) | — | — | — | 6,93,000 | |
| — | 522.00 | — | — | ||
| Quarterly Maintenance of Feeder PT-(Type-I) | — | — | — | 3,72,186 | |
| — | 174.00 | — | — | ||
| Yearly Maintenance of Feeder PT-(Type-I) | — | — | — | 2,50,734 | |
| — | 36.00 | — | — | ||
| Quarterly Maintenance of Capacitor Bank including series reactors | — | — | — | 24,768 | |
| — | 12.00 | — | — | ||
| Yearly Maintenance of Capacitor Bank including series reactors | — | — | — | 51,864 | |
| — | 968.00 | — | — | ||
| Fortnightly Maintenance of 110V, 40Ah/150 Ah/200Ah/250AH Lead Acid Battery & Battery charger including DC distribution box | — | — | — | 6,90,184 | |
| — | 44.00 | — | — | ||
| Half Yearly Maintenance of 110V, 40Ah/150 Ah/200Ah/250AH Lead Acid Battery & Battery charger including DC distribution box | — | — | — | 1,19,768 | |
| — | 44.00 | — | — | ||
| Yearly Maintenance of 110V, 40Ah/150 Ah/200Ah/250AH Lead Acid Battery & Battery charger including DC distribution box | — | — | — | 8,93,200 | |
| — | 1068.00 | — | — | ||
| Yearly maintenance of Earthing Stations | — | — | — | 2,92,632 | |
| — | 6.00 | — | — | ||
| Yearly maintenance of Burried Rail | — | — | — | 1,72,776 | |
| — | 50.00 | — | — | ||
| Yearly maintenance of Earth Screen Conductor | — | — | — | 1,34,950 | |
| — | 38.00 | — | — | ||
| Yearly maintenance of Cable Trench Cleaning | — | — | — | 3,28,434 | |
| — | 168.00 | — | — | ||
| Thermal Imaging of Equipment Connector on Quarterly basis | — | — | — | 1,44,144 | |
| — | 6.00 | — | — | ||
| Yearly Gantry Maintenance of TSS | — | — | — | 1,00,800 | |
| — | 36.00 | — | — | ||
| Yearly Gantry Maintenance of SP/SSP | — | — | — | 6,04,800 | |
| — | 16.00 | — | — | ||
| Transformer oil testing by accredited agency - | — | — | — | 5,26,752 | |
| — | 32.00 | — | — | ||
| Tan Delta & Capacitance testing of transformer | — | — | — | 16,41,408 | |
| — | 2.00 | — | — | ||
| Power Frequency Test of Vaccum CB/BM | — | — | — | 41,035.2 | |
| — | 6570.00 | — | — | ||
| "Operation & Manning of TSS, (Deployment of skilled staff)" | — | — | — | 88,36,650 | |
| — | 1920.00 | — | — | ||
| Manning of Switching Stations (SP & SSP) in case of failure of SCADA, OFC block or as per requirement (Deployment of skilled staff) | — | — | — | 24,13,440 | |
| — | 2190.00 | — | — | ||
| "Housekeeping of TSS,(Deployment of unskilled staff)" | — | — | — | 20,87,070 | |
| — | 432.00 | — | — | ||
| "Housekeeping of SP/SSP, (Deployment of unskilled staff)" | — | — | — | 3,84,912 | |
| — | 2880.00 | Man-Days | — | ||
| PSI depot General work/Upkeep of stores /Un-skilled Manpower deployment at Raipur & Bhatapara | — | — | — | 23,47,200 | |
| — | 1020.00 | — | — | ||
| Quarterly maintenance of 25kV/240V Auxiliary Transformer | — | — | — | 14,28,000 | |
| — | 340.00 | — | — | ||
| Yearly maintenance of 25kV/240V Auxiliary Transformer | — | — | — | 11,77,080 | |
| — | 20.00 | — | — | ||
| Removal and re-erection of PSI all Equipments except Power Transformer | — | — | — | 1,83,140 | |
| — | 20.00 | — | — | ||
| Reinforce concrete for cable trench | — | — | — | 56,100 | |
| — | 50.00 | — | — | ||
| Reinforce concrete for cable trench cover/ Earth pit box & cover | — | — | — | 1,80,900 | |
| — | 500.00 | — | — | ||
| Supply of paint and repainting parameter writing of PSI equipments like Traction Transformer, CB, BM, PT, AT etc as per site requirement with water proof enameled paint from any of paint confirming to IS:2932 or latest. | — | — | — | 41,500 | |
| — | 500.00 | — | — | ||
| Supply of paint and repainting of PSI assets i.e. Fencing Panels, Fencing uprights, barbed wires, TSS / Switching posts and Tubular Poles at TSS in electrified section from any of paint confirming to IS:2339 or latest. | — | — | — | 38,000 | |
| — | 200.00 | — | — | ||
| Supply and spreading of ballast (20mm-40mm) in Switching Stations / TSS yard.as per requirement | — | — | — | 5,95,600 | |
| — | 20.00 | — | — | ||
| Concrete for foundation & plinth | — | — | — | 1,84,180 | |
| — | 100.00 | — | — | ||
| Murum spreading (depth 100 mm) | — | — | — | 1,24,400 | |
| — | 20.00 | — | — | ||
| Supply of 25 KV caution boards/danger boards | — | — | — | 15,140 | |
| — | 20.00 | — | — | ||
| Erection of 25 KV caution boards/danger boards | — | — | — | 3,120 | |
| — | 20.00 | — | — | ||
| Reclamation of DCP (5kg, 10kg & 25kg), CO2 (9kg) & Foam type Fire extinguisher | — | — | — | 2,060 | |
| — | 100.00 | — | — | ||
| Tree trimming to maintain a minium clearance of 5 to 6 mtrs from OHE big branch consisting upto 5 small sub branches | — | — | — | 10,000 | |
| — | 20.00 | — | — | ||
| Drilling of holes mast/rails with contractor's own labour and T & P complete | — | — | — | 1,000 | |
| — | 42.00 | — | — | ||
| Supply of Single Earth Electrode | — | — | — | 93,156 | |
| — | 42.00 | — | — | ||
| Erection of Single Earth Electrode | — | — | — | 67,242 | |
| — | 400.00 | — | — | ||
| Rectification of 25 KV dropout fuse | — | — | — | 8,18,800 | |
| — | 50.00 | — | — | ||
| Breakdown call of TSS (upto 8 Hrs working) | — | — | — | 3,65,100 | |
| — | 100.00 | — | — | ||
| Breakdown call of SP/SSP (upto 8Hrs working) | — | — | — | 5,07,100 | |
| — | 100.00 | — | — | ||
| Breakdown call of AT (upto 8 Hrs working) at stations & LC gates | — | — | — | 5,07,100 | |
| — | 20.00 | — | — | ||
| Supply of Dungry cloth blue | — | — | — | 2,100 | |
| — | 20.00 | — | — | ||
| Supply of Oil Kerosene | — | — | — | 1,900 | |
| — | 10.00 | — | — | ||
| Supply of Brush Paint 75 mm | — | — | — | 860 | |
| — | 20.00 | — | — | ||
| Supply of Cotton waste | — | — | — | 1,240 | |
| — | 10.00 | — | — | ||
| Supply of PVC insulation Tape (set consisting of 4 items: 1 Red colour 1 no., Yellow 1 no., Blue colour 1 no., Black colour 1 no.) | — | — | — | 510 | |
| — | 20.00 | — | — | ||
| Supply of Hacksaw blade 12.5 | — | — | — | 920 | |
| — | 50.00 | — | — | ||
| Supply of Brush hair 25 mm | — | — | — | 20,900 | |
| — | 50.00 | — | — | ||
| Supply of Brush hair 50 mm | — | — | — | 11,050 | |
| — | 50.00 | — | — | ||
| Supply of Emery cloth paper | — | — | — | 800 | |
| — | 100.00 | — | — | ||
| Supply of Broom coco | — | — | — | 4,000 | |
| — | 10.00 | — | — | ||
| Supply of Petroleum jelly | — | — | — | 4,100 | |
| — | 200.00 | — | — | ||
| Supply of Duster cloth white khadi (size 61cmx61cm) | — | — | — | 29,000 | |
| — | 100.00 | — | — | ||
| Supply of Napthalene ball | — | — | — | 18,800 | |
| — | 0.10 | — | — | ||
| Supply of Solder soft/ wire resine core @40<47@40 ) 18-20 SWG | — | — | — | 276.9 | |
| — | 40.00 | — | — | ||
| Supply of CRC/WD-40 spray | — | — | — | 6,560 | |
| — | 10.00 | — | — | ||
| Supply of Anabond 666 (in 100 gm tube) | — | — | — | 1,320 | |
| — | 10.00 | — | — | ||
| Supply of Servogem grease | — | — | — | 4,690 | |
| — | 20.00 | — | — | ||
| Supply of Mobil oil SAE 40 | — | — | — | 12,220 | |
| — | 1000.00 | — | — | ||
| Supply of Silica gel/Alumina | — | — | — | 2,63,000 | |
| — | 600.00 | — | — | ||
| Supply of DO fuse link 1 amp | — | — | — | 48,600 | |
| — | 50.00 | — | — | ||
| Supply of DO barrel 33 mm with top and bottom attachment | — | — | — | 1,80,900 | |
| — | 100.00 | — | — | ||
| Supply of Cloth cotton | — | — | — | 4,900 | |
| — | 50.00 | — | — | ||
| Supply of Phenyle | — | — | — | 2,400 | |
| — | 50.00 | — | — | ||
| Supply of Broom | — | — | — | 3,500 | |
| — | 20.00 | — | — | ||
| Supply of Wiper for room cleaning | — | — | — | 2,640 | |
| — | 100.00 | — | — | ||
| Supply of Harpic/Lyzol/Domex/ Coline /Detergent Solid or liquid | — | — | — | 15,500 | |
| — | 100.00 | — | — | ||
| Supply of Nuvan (1 litre Packet)/ Chloroprophos (1 litre Packet)/ Finit/Began (2 litrePacket)/ Malathene(300 ml Packet) | — | — | — | 49,200 | |
| — | 10.00 | — | — | ||
| Supply of sprayer for spraying of antiweed chemical of reputed make | — | — | — | 19,650 | |
| — | 200.00 | — | — | ||
| Supply of Anti slip door mat of width 120 cm (PVC Plastic jali door mat good quality)suitable to 33kV minimum. | — | — | — | 15,600 | |
| — | 100.00 | — | — | ||
| Supply of Silical Gel Breather of 500gm with glass window, gaskets & oil cap suitable to auxiliary transformers | — | — | — | 45,200 | |
| — | 500.00 | — | — | ||
| Supply of Distilled Water (5 ltr can) | — | — | — | 1,03,000 | |
| — | 200.00 | — | — | ||
| Supply of HRC fuse 10A/16A | — | — | — | 7,000 | |
| — | 540.00 | — | — | ||
| Supply of Electrolyte | — | — | — | 16,200 | |
| — | 200.00 | — | — | ||
| Supply of Hydrometer | — | — | — | 20,800 | |
| — | 4.00 | — | — | ||
| Insulation tester 2.5 kV | — | — | — | 66,068 | |
| — | 4.00 | — | — | ||
| Earth Tester | — | — | — | 51,872 | |
| — | 4.00 | — | — | ||
| Insulation tester 500 V | — | — | — | 37,468 | |
| — | 1.00 | — | — | ||
| Crimping tool for TSS Cable | — | — | — | 1,902 | |
| — | 1.00 | — | — | ||
| Blower for cleaning switch gears and control panel (portable) | — | — | — | 5,310 | |
| — | 6.00 | — | — | ||
| Hacksaw frame Adj. 12 inch | — | — | — | 1,854 | |
| — | 42.00 | — | — | ||
| Thermometers | — | — | — | 6,300 | |
| — | 200.00 | — | — | ||
| Hiring of 15T crane on hourly basis | — | — | — | 4,07,400 | |
| — | 40.00 | — | — | ||
| Painting of rail pole with supply of red Oxide( primer) | — | — | — | 7,840 | |
| — | 40.00 | — | — | ||
| Painting of rail pole with supply of Aluminium Paint | — | — | — | 7,960 | |
| — | 4.00 | — | — | ||
| Supply of street light junction box 200x150x80mm size with 1 no 6A HRC fuse with base and 1 no. TPN terminal block stud type suitable for 25 sqmm cable | — | — | — | 4,088 | |
| — | 4.00 | — | — | ||
| Fixing & connection of Junction boxes as supplied above | — | — | — | 712 | |
| — | 50.00 | — | — | ||
| Laying of cable with semicircular RCC pipe in cable trench along the road | — | — | — | 1,200 | |
| — | 50.00 | — | — | ||
| Laying of cable in GI pipe including supply of all materials | — | — | — | 7,150 | |
| — | 50.00 | — | — | ||
| Laying of cable in open air/on wall/GI pipe/etc with supply of all materials except GI pipe as per the details given in explanatory notes enclosed | — | — | — | 2,650 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
TDPSIOutsourcingpdf.pdf
ATTACHMENT
GCC 2022
ATTACHMENT
GCC2022correctionslipnp1to12_compressed.pdf GCC Correction slip 1 to 12
ATTACHMENT
GCC_April-2022_2022_CE-I_CT_GCC-2022_POLICY_27.04.22.pdf
ATTACHMENT
GCC2022correctionslipnp1to12_compressed.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .