| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.3 LAccepted-Finance 56 LAXMANPURI COLONY ALLAHABAD ROAD SULTANPUR | SULTANPUR | SULTANPUR | UTTAR PRADESH | ₹12.3 L | L1 | Accepted-Finance L1 |
| 2 | L2₹12.5 L+₹18,666.50 (1.52%)Accepted-Finance | ₹12.5 L+₹18,666.50 (1.52%) | L2 | Accepted-Finance L2 |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹12.3 L
EMD Value
₹25,000
Closing Date
30 Sept 2019, 3:00 pmClosed
EXECUTIVE ENGINEER SSK 49 SULTANPUR
EXECUTIVE ENGINEER SSK 49 SULTANPUR
Construction of V.R.B. at Km 10.383 in place of foot bridge on Amethi Dy.
2019_UPIDC_384997_1
05/EE/SSK49/2019-20
Open Tender
Civil Works
Item Rate
90 days
AMETHI
Please refer Tender documents.
2 documents required · 2 mandatory
₹266
EXECUTIVE ENIGNEER SSK 49 SULTANPUR
₹25,000
Yes
6 Jan 2020
25 Sept 2019
30 Sept 2019
25 Sept 2019
30 Sept 2019
25 Sept 2019
{kfrxzLr dne iqfy;k ds LFkku ij oh0vkj0ch0 fuekZ.k dk dk;Z
Dismentaling of old Existing Foot bridge including disposal of dimentaled material as directed by Engineer in-charge.
E/W in Foundation of masonary work including all lead lift proper disposal labour & T&P etc.
Laying C.C. 1:3:6 in foundation with coarse sand & stone ballast 20 to 40 mm. size including cost of all material abour T&P etc.
Laying C.C. 1:2:4 M-15 with greded metal of maximum size 20 mm including cost of all material abour T&P etc.
1st class brick work in 1:4 cm making abutment, toe wall & side toe wall including cost of all material labour T&P etc.
1st class brick work in 1:3 cm in Piers including cost of all material labour T&P etc.
Providing & fixing centering & shuttering for RCC slab including cost of all labour T&P etc.
Laying & placing reinforcement of steel in position including bending binding cutting with cost of binding wire etc. Including cost of steel
Laying C.C. 1:1.5:3 in R.C.C. slab with coarse sand & stone grit 12 to 20 mm size including cost of all material labour T&P etc.
Providing 150 mm dia AC pipe for water spots @ 3.00 C/c both side of slab including cost of all material labour T&P etc.
Dewatering by 5.0 H.P. diesel pump , including hiring incharge of pump with operator & P.O.L. for running hours etc. all required for completion of works.
Stuck deep cement pointing in 1:2 Cm with coarse sand including cost of al material labour T&P etc.
Providing and Fixing Joined filler board including all cost of Labour, Material T & P etc.
M/S JAGDISH CONSTRUCTION AND SUPPLIERS
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .