| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.9 LAdmitted-Fee/PreQual/Technical/Finance NO 150 ASHOK STREET UDAYAMPALAYAM COIMBATORE 641045 | COIMBATORE | TAMIL NADU | 641045 | ₹10.9 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹11.0 L+₹4,665.41 (0.43%)Admitted-Fee/PreQual/Technical/Finance | ₹11.0 L+₹4,665.41 (0.43%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹11.0 L+₹4,666 (0.43%)Admitted-Fee/PreQual/Technical/Finance | ₹11.0 L+₹4,666 (0.43%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹11.0 L+₹4,677.70 (0.43%)Admitted-Fee/PreQual/Technical/Finance | ₹11.0 L+₹4,677.70 (0.43%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹11.0 L+₹4,784 (0.44%)Admitted-Fee/PreQual/Technical/Finance | ₹11.0 L+₹4,784 (0.44%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | S MUTHURAJA L7 | Sri Sowparnika Associates L11 | A VIJAYAKUMAR L8 | NMS ENGINEERS L9 | ABBI ASSOCIATES L10 | OMSAKTHI CONSTRUCTION L3 | S M BUILDERS L4 | K SELVARAJ L2 | MANOHAR L6 | SRI KRISHNA INFRA TECH L5 | Dhandapani L1 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling the existing damaged brick work in cement mortar walls as per the departmental officer etc complete | 17 | M3 | 300.1 ₹5,101.7 | 316.63 ₹5,382.71 | 300 ₹5,100 | 133 ₹2,261 | 300 ₹5,100 | 250 ₹4,250 | 250 ₹4,250 | 283.27 ₹4,815.59 | 230 ₹3,910 | 333 ₹5,661 | 100 ₹1,700 Lowest |
| 2.00 | Removing the existing damaged grill as per the direction of departmetnal officers etc complete | 110 | M3 | 147.96 ₹16,275.6 | 156.12 ₹17,173.2 | 160 ₹17,600 | 64 ₹7,040 | 50 ₹5,500 Lowest | 130 ₹14,300 | 130 ₹14,300 | 139.66 ₹15,362.6 | 120 ₹13,200 | 80 ₹8,800 | 50 ₹5,500 Lowest |
| 3.00 | Dismantling the existing damaged PCC as per the direction of departmetnal officers etc complete | 10 | M3 | 515.31 ₹5,153.1 | 543.69 ₹5,436.9 | 570 ₹5,700 | 172 ₹1,720 Lowest | 300 ₹3,000 | 486 ₹4,860 | 486.47 ₹4,864.7 | 486.41 ₹4,864.1 | 400 ₹4,000 | 250 ₹2,500 | 300 ₹3,000 |
| 4.00 | Providing pile foundation using 30mm dia aguar etc as per officers etc completed | 99 | M3 | 277.35 ₹27,457.65 | 292 ₹28,908 | 300 ₹29,700 | 300 ₹29,700 | 250 ₹24,750 | 250 ₹24,750 | 250 ₹24,750 | 261.8 ₹25,918.2 | 250 ₹24,750 | 220 ₹21,780 Lowest | 285 ₹28,215 |
| 5.00 | Earth work excavation in all kinds of soil including sand, silt, wet sand under water, black cotton, stiff black cotton, clay, hard stiff clay, hard red earth, murram, stoney earth, gravel and shales etc. excepting all kinds of rock and boulders exceeding 0.014 c.u.m. in volume including rough dressing and dumping the excavated materials away from work site manually within 50m initial lead and 2m initial lift as per the direction of Engineer-in charge departmental officers etc complete | 12 | M3 | 198.11 ₹2,377.32 | 209 ₹2,508 | 210 ₹2,520 | 200 ₹2,400 | 200 ₹2,400 | 187 ₹2,244 | 187 ₹2,244 | 187 ₹2,244 | 140 ₹1,680 Lowest | 220 ₹2,640 | 150 ₹1,800 |
| 6.00 | Cement concrete 1:4:8 Cone cement, four sand and eight aggregate) using 40mm hardbroken granite stone jelly for foundationincluding dewatering if found necessary andiaid in layers of not more than 15 cm thick and compacted etc.,complete | 13 | M3 | 5,369.16 ₹69,799.08 | 5,664 ₹73,632 | 5,700 ₹74,100 | 5,000 ₹65,000 | 5,500 ₹71,500 | 5,200 ₹67,600 | 5,200 ₹67,600 | 5,068.06 ₹65,884.78 | 5,000 ₹65,000 | 4,700 ₹61,100 Lowest | 5,300 ₹68,900 |
| 7.00 | Supplying and erecting SHUTTTERING including necessary supports for plane surfaces such as RCC COLUMN, FOOTING, PLINTH BEAM, STAIRCASE STEPS etc., in all floors using mild steel sheets of size 90cm X 60Cm and BG 10 stiffened with welded mild steel angles for boarding supported by Casuarinas props at suitable intervals etc., complete complying with standard Specification and as directed. | 100 | M2 | 1,063.49 ₹1,06,349 | 1,122 ₹1,12,200 | 1,000 ₹1,00,000 | 1,000 ₹1,00,000 | 1,000 ₹1,00,000 | 1,003.9 ₹1,00,390 | 1,003.97 ₹1,00,397 | 1,003.85 ₹1,00,385 | 800 ₹80,000 Lowest | 880 ₹88,000 | 950 ₹95,000 |
| 8.00 | Supplying, fabricating and placing in position TMT/CTD rods for all RCC works including cost of steel and binding wire also in all floors complete complying with standard Specification | 22 | Qtl | 8,592.71 ₹1,89,039.62 | 9,065 ₹1,99,430 | 9,300 ₹2,04,600 | 9,000 ₹1,98,000 | 9,500 ₹2,09,000 | 8,500 ₹1,87,000 | 8,500 ₹1,87,000 | 8,110.83 ₹1,78,438.26 Lowest | 8,900 ₹1,95,800 | 8,500 ₹1,87,000 | 8,600 ₹1,89,200 |
| 9.00 | Reinforced Cement concrete 1:1.5 :3 (one cement, one and half sand & three course aggregate) using 20mm gauge hand broken/ and broken granite stone for all RCC items of works excluding centering shuttering and cost of reinforcement but including curing etc.,complete and also including fixing fan clamps and fixtures in rcc works wherever necessary as directed by departmental officer | 22 | m3 | 8,774.96 ₹1,93,049.12 | 9,258 ₹2,03,676 | 9,000 ₹1,98,000 | 9,000 ₹1,98,000 | 9,500 ₹2,09,000 | 8,200 ₹1,80,400 Lowest | 8,200 ₹1,80,400 Lowest | 8,282.86 ₹1,82,222.92 | 8,500 ₹1,87,000 | 8,500 ₹1,87,000 | 8,500 ₹1,87,000 |
| 10.00 | BRICK WORK in cement mortar 1:5 (one cement and five sand) using best quality of second class (Table molded chamber burnt ) bricks of size 9"x4 '4"x3” for the following including curing etc., complete complying with standard specifications. (Masonry projections wherever necessary for obtaining the required elevation shall be done without extra cost. | 41 | m3 | 6,959.04 ₹2,85,320.64 | 7,340 ₹3,00,940 | 7,300 ₹2,99,300 | 7,500 ₹3,07,500 | 7,500 ₹3,07,500 | 6,500 ₹2,66,500 Lowest | 6,500 ₹2,66,500 Lowest | 6,568.77 ₹2,69,319.57 | 6,900 ₹2,82,900 | 7,158 ₹2,93,478 | 6,500 ₹2,66,500 Lowest |
Tender Value
₹15.6 L
EMD Value
₹15,600
Closing Date
21 Jul 2026, 3:00 pmClosed
The Commissioner, Coimbatore Corporation
Coimbatore Corporation, Main Office, Big bazaar street, Town hall, Coimbatore-1
Constructin of Compound Wall at Sungam Nehru Park in Ward No 83 Central Zone.
2026_MAWS_684748_7
E39/2026
Open Tender
Civil Works
Works
150 days
Coimbatore corporation
AS PER TENDER DOCUMENTS
5 documents required · 5 mandatory
₹0
₹15,600
22 Jul 2026
9 Jul 2026
22 Jul 2026
9 Jul 2026
21 Jul 2026
9 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling the existing damaged brick work in cement mortar walls as per the departmental officer etc complete | 17 | M3 | - | - |
| 2 | Removing the existing damaged grill as per the direction of departmetnal officers etc complete | 110 | M3 | - | - |
| 3 | Dismantling the existing damaged PCC as per the direction of departmetnal officers etc complete | 10 | M3 | - | - |
| 4 | Providing pile foundation using 30mm dia aguar etc as per officers etc completed | 99 | M3 | - | - |
| 5 | Earth work excavation in all kinds of soil including sand, silt, wet sand under water, black cotton, stiff black cotton, clay, hard stiff clay, hard red earth, murram, stoney earth, gravel and shales etc. excepting all kinds of rock and boulders exceeding 0.014 c.u.m. in volume including rough dressing and dumping the excavated materials away from work site manually within 50m initial lead and 2m initial lift as per the direction of Engineer-in charge departmental officers etc complete | 12 | M3 | - | - |
| 6 | Cement concrete 1:4:8 Cone cement, four sand and eight aggregate) using 40mm hardbroken granite stone jelly for foundationincluding dewatering if found necessary andiaid in layers of not more than 15 cm thick and compacted etc.,complete | 13 | M3 | - | - |
| 7 | Supplying and erecting SHUTTTERING including necessary supports for plane surfaces such as RCC COLUMN, FOOTING, PLINTH BEAM, STAIRCASE STEPS etc., in all floors using mild steel sheets of size 90cm X 60Cm and BG 10 stiffened with welded mild steel angles for boarding supported by Casuarinas props at suitable intervals etc., complete complying with standard Specification and as directed. | 100 | M2 | - | - |
| 8 | Supplying, fabricating and placing in position TMT/CTD rods for all RCC works including cost of steel and binding wire also in all floors complete complying with standard Specification | 22 | Qtl | - | - |
| 9 | Reinforced Cement concrete 1:1.5 :3 (one cement, one and half sand & three course aggregate) using 20mm gauge hand broken/ and broken granite stone for all RCC items of works excluding centering shuttering and cost of reinforcement but including curing etc.,complete and also including fixing fan clamps and fixtures in rcc works wherever necessary as directed by departmental officer | 22 | m3 | - | - |
| 10 | BRICK WORK in cement mortar 1:5 (one cement and five sand) using best quality of second class (Table molded chamber burnt ) bricks of size 9"x4 '4"x3” for the following including curing etc., complete complying with standard specifications. (Masonry projections wherever necessary for obtaining the required elevation shall be done without extra cost. | 41 | m3 | - | - |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
BuildingSingleCover.pdf
Tender Documents • 0.95 MB
ITB.pdf
Additional Documents • 0.19 MB
BOQ_823195.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .