| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹7.5 CrAccepted-Finance 142 | ₹7.5 Cr | 1 | Accepted-Finance L1 |
| 2 | 2₹7.9 Cr+₹39.6 L (5.25%)Rejected-Finance NAN | ₹7.9 Cr+₹39.6 L (5.25%) | 2 | Rejected-Finance L2 |
| 3 | 3₹8.4 Cr+₹88.6 L (11.8%)Rejected-Finance | ₹8.4 Cr+₹88.6 L (11.8%) | 3 | Rejected-Finance L3 |
| 4 | 4₹9.3 Cr+₹1.8 Cr (23.7%)Rejected-Finance | ₹9.3 Cr+₹1.8 Cr (23.7%) | 4 | Rejected-Finance L4 |
| 5 | Rejected-Technical FARIDPUR PACHKHORA BALLIA U P | BALLIA | BALLIA | UTTAR PRADESH | - | - | Rejected-Technical Uploaded Bid Capacity Certificate/Document was generated before the date of issuance of the tender, so not Qualify with the eligibility criteria. |
| Sl No | Description | Qty | Unit | R.B.S. CONSTRUCTION L4 | M/S SHIV SHAKTI CONSTRUCTION L1 | M/s Bajrang Construction & Suppliars L2 | M/s Hari Construction L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation of foundation in Mar, Rankar and kankar mixed soils including lift up to 1.5 meter and lead upto 30 meter including filling, watering, ramming, of excavated earth into the trenches or upto the space and sides of the foundation trenches or into the plinth and removal and disposal of surplus earth as directed by Engineer-in charge upto a distance of 30 meter from the foundation trenches. | 6,387.06 | M3 | 97.38 ₹6,21,971.9 | 79 ₹5,04,577.74 | 137.78 ₹8,80,009.13 | 50 ₹3,19,353 Lowest |
| 2.00 | Supply and laying of coarse sand in foundation/floor including all cost of material labour T&P etc with proper completion of work. | 9,206.68 | M3 | 1,444 ₹1,32,94,445.92 | 1,313 ₹1,20,88,370.84 Lowest | 1,323 ₹1,21,80,437.64 | 1,600 ₹1,47,30,688 |
| 3.00 | C.C. 1:3:6 With cement, coarse sand and Stone Ballast 20 to 40 mm size with cement course sand and stone grit 10 to 20 mm including all cost of material, labour, T&P and proper completion of work. | 1,824.7 | M3 | 4,556 ₹83,13,333.2 | 3,518 ₹64,19,294.6 | 3,684.91 ₹67,23,855.28 | 3,500 ₹63,86,450 Lowest |
| 4.00 | khanda stone masonary work in 1:4 (1 cement 4 sand) including all cost of material labour t&p complete required for proper copmlition of work | 2,787.13 | M3 | 5,150 ₹1,43,53,719.5 | 3,986 ₹1,11,09,500.18 Lowest | 4,175.09 ₹1,16,36,518.59 | 5,000 ₹1,39,35,650 |
| 5.00 | Dismantling and relaying stone boulder pitching including all cost of labour T&P labour cess etc. complete but excluding cost of materials. | 17,245.26 | M3 | 274.5 ₹47,33,823.87 | 222 ₹38,28,447.72 Lowest | 233.2 ₹40,21,594.63 | 300 ₹51,73,578 |
| 6.00 | Supply and laying dry stone boulder pitching including cost of all labour material and T&P. | 3,596.65 | M3 | 1,451.49 ₹52,20,501.51 | 1,177 ₹42,33,257.05 Lowest | 1,233.12 ₹44,35,101.05 | 1,500 ₹53,94,975 |
| 7.00 | Centering and Shuttering of P.C.C. Work including all material, labour T&P etc with proper completion of work. | 5,153.46 | M2 | 281 ₹14,48,122.26 | 228 ₹11,74,988.88 Lowest | 239.16 ₹12,32,501.49 | 300 ₹15,46,038 |
| 8.00 | Laying C.C. work 1:2:4 with cement course sand and stone grit 10 to 20 mm including all cost of material, labour, T&P etc with proper completion of work. | 191.1 | M3 | 4,753 ₹9,08,298.3 | 3,813 ₹7,28,664.3 Lowest | 3,993.63 ₹7,63,182.69 | 5,000 ₹9,55,500 |
| 9.00 | Laying R.C.C. work 1:1.5:3 for slab with cement course sand and stone grit 10 to 20 mm including all cost of material, labour, T&P and proper completion of work. | 250.79 | M3 | 5,666 ₹14,20,976.14 | 4,594 ₹11,52,129.26 Lowest | 4,811.38 ₹12,06,645.99 | 5,500 ₹13,79,345 |
| 10.00 | Centering and Shuttering of R.C.C. Work including all material, labour T&P etc with proper completion of work. | 1,774.5 | M3 | 855 ₹15,17,197.5 | 686 ₹12,17,307 Lowest | 718.41 ₹12,74,818.55 | 850 ₹15,08,325 |
Tender Value
₹10.3 Cr
EMD Value
₹20.6 L
Closing Date
4 Aug 2026, 3:00 pmClosed
Superintending Engineer, IVth Circle Irrigation Wo
Office of the Superintending Engineer, IVth Circle Irrigation Works, Jhansi
Lot 1, Restoration Work of Saprar Dam in District Jhansi.
2026_UPIDC_1171841_1
04/SE-IV/2026-27
Open Tender
Civil Works
Item Rate
540 days
Mauranipur
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,000
₹20.6 L
8 Sept 2026
25 Jul 2026
4 Aug 2026
25 Jul 2026
4 Aug 2026
25 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation of foundation in Mar, Rankar and kankar mixed soils including lift up to 1.5 meter and lead upto 30 meter including filling, watering, ramming, of excavated earth into the trenches or upto the space and sides of the foundation trenches or into the plinth and removal and disposal of surplus earth as directed by Engineer-in charge upto a distance of 30 meter from the foundation trenches. | 6,387.06 | M3 | 108.2 | ₹6,91,079.89 |
| 2 | Supply and laying of coarse sand in foundation/floor including all cost of material labour T&P etc with proper completion of work. | 9,206.68 | M3 | 1,798.45 | ₹1,65,57,753.65 |
| 3 | C.C. 1:3:6 With cement, coarse sand and Stone Ballast 20 to 40 mm size with cement course sand and stone grit 10 to 20 mm including all cost of material, labour, T&P and proper completion of work. | 1,824.7 | M3 | 4,819.4 | ₹87,93,959.18 |
| 4 | khanda stone masonary work in 1:4 (1 cement 4 sand) including all cost of material labour t&p complete required for proper copmlition of work | 2,787.13 | M3 | 5,460.52 | ₹1,52,19,179.11 |
| 5 | Dismantling and relaying stone boulder pitching including all cost of labour T&P labour cess etc. complete but excluding cost of materials. | 17,245.26 | M3 | 305 | ₹52,59,804.3 |
| 6 | Supply and laying dry stone boulder pitching including cost of all labour material and T&P. | 3,596.65 | M3 | 1,612.77 | ₹58,00,569.22 |
| 7 | Centering and Shuttering of P.C.C. Work including all material, labour T&P etc with proper completion of work. | 5,153.46 | M2 | 312.8 | ₹16,12,002.29 |
| 8 | Laying C.C. work 1:2:4 with cement course sand and stone grit 10 to 20 mm including all cost of material, labour, T&P etc with proper completion of work. | 191.1 | M3 | 5,223.17 | ₹9,98,147.79 |
| 9 | Laying R.C.C. work 1:1.5:3 for slab with cement course sand and stone grit 10 to 20 mm including all cost of material, labour, T&P and proper completion of work. | 250.79 | M3 | 6,292.67 | ₹15,78,138.71 |
| 10 | Centering and Shuttering of R.C.C. Work including all material, labour T&P etc with proper completion of work. | 1,774.5 | M3 | 939.6 | ₹16,67,320.2 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.70 MB
04SEIVNIT2026-27.pdf
Tender Documents • 2.89 MB
BOQ_2200250.xls
BOQ • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .