Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹27.6 LAccepted-Finance | 1 | Accepted-Finance As per Comparative statement | |
| 2 | 2₹28.2 L+₹67,300 (2.44%)Accepted-Finance | 2 | Accepted-Finance As per Comparative statement | |
| 3 | 3₹29.1 L+₹1.5 L (5.36%)Accepted-Finance | 3 | Accepted-Finance As per Comparative statement | |
| 4 | Rejected-Technical | - | Rejected-Technical As per TEC |
Tender Value
₹28.5 L
EMD Value
₹57,000
Closing Date
4 Sept 2023, 3:00 pmClosed
Director IISER Pune
IISER PASHAN PUNE
RENOVATION OF COMPOUND WALL AT IITM SIDE AT IISER PUNE.
2023_IISRP_768373_1
2/IISER/Pune/2023-24
Open Tender
Civil Works
Works
90 days
IISER PASHAN PUNE
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,180
Director IISER Pune
₹57,000
31 Oct 2023
25 Aug 2023
5 Sept 2023
25 Aug 2023
4 Sept 2023
26 Aug 2023
Amount
Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) Quoted rate shall be including GST , transportation , lead , lift , scaffolding etc complete. Nothing extra shall be paid separately.
Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge.Quoted rate shall be including GST , transportation , lead , lift , scaffolding etc complete. Nothing extra shall be paid separately.
Extra for cutting reinforcement bars manually/ by mechanical means in R.C.C. or R.B. work (Payment shall be made on the cross sectional area of R.C.C. or R.B. work) as per direction of Engineer In-charge.
Extra for scrapping, cleaning and straightening reinforcement from R.C.C. or R.B. work.Quoted rate shall be including GST , transportation , lead , lift , scaffolding etc complete. Nothing extra shall be paid separately.
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar. Quoted rate shall be including GST , transportation , lead , lift , scaffolding etc complete. Nothing extra shall be paid separately.
Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge : In cement mortar.Quoted rate shall be including GST , transportation , lead , lift , scaffolding etc complete. Nothing extra shall be paid separately.
Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 metres lead. Quoted rate shall be including GST , transportation , lead , lift , scaffolding etc complete. Nothing extra shall be paid separately.
Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead within 1KM lead , for all leads including all lifts involved. Quoted rate shall be including GST , transportation , lead , lift , scaffolding etc complete. Nothing extra shall be paid separately.
Providing and laying in position ready mixed plain cement concrete, with cement content as per approved design mix and manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for plain cement concrete work, including pumping of R.M.C. from transit mixer to site of laying and curing, including the cost of centring, shuttering and finishing, including cost of curing, admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineering- charge. Note : 1) Excess/less cement used than specified in this item is payable/recoverable separately. 1 All works up to plinth level : M-30 grade plain cement concrete (cement content considered @ 240 kg/cum). Quoted rate shall be including GST , transportation , lead , lift , scaffolding etc complete. Nothing extra shall be paid separately.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to/above plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. Quoted rate shall be including GST , transportation , lead , lift , scaffolding etc complete. Nothing extra shall be paid separately.
Brick work with non modular fly ash bricks conforming to IS:12894, class designation 6 average compressive strength 60kg/sqcm in below plinth level.Quoted rate shall be including GST , transportation , lead , lift , scaffolding etc complete. Nothing extra shall be paid separately.
Internal Plastering with 12 mm cement plaster 1:2 (1 cement : 2 stone dust). Quoted rate shall be including all taxes , duties , material and labour cost , GST, etc complete. Nothing extra shall be paid separately.
Earth work in excavation and backfilling by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. All kinds of soil.Quoted rate shall be including GST , transportation , lead , lift , scaffolding etc complete. Nothing extra shall be paid separately.
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead within/excavated within the campus in borrow pits.Quoted rate shall be including GST , transportation , lead , lift , scaffolding etc complete. Nothing extra shall be paid separately.
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.Quoted rate shall be including GST , transportation , lead , lift , scaffolding etc complete. Nothing extra shall be paid separately.
Providing and fixing carbon steel galvanised ( minimum coating 5 micron) dash fastener of 10 mm dia double threaded 6.8 grade (yield strength 480 N/mm2), counter sunk head, comprising of 10 mm dia polyamide PA 6 grade sleeve, including drilling of hole in frame , concrete/ masonry, etc. as per direction of Engineer-in-charge. 10 x 120 mm.Quoted rate shall be including GST , transportation , lead , lift , scaffolding etc complete. Nothing extra shall be paid separately.
Providing and fixing GI fence razor wall spikes of height 110mm, sharps heighted spikes at 80mm intervals width 80mm, thickness of the spikes 3mm. Spikes to be fixed on existing chain-link fencing as per director of Engineer In-charge, IISER Pune etc complete. Quoted rate shall be including material, labour, GST , transportation , lead , lift , scaffolding etc complete within IISER Pune campus. Nothing extra shall be paid separately. Actual length of spikes fixed at site shall be measured for payments.Quoted rate shall be including GST , transportation , lead , lift , scaffolding etc complete. Nothing extra shall be paid separately.
Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete.Quoted rate shall be including GST , transportation , lead , lift , scaffolding etc complete. Nothing extra shall be paid separately.
Finishing walls with Acrylic Smooth exterior paint of required shade : Old work (Two or more coat applied @ 1.67 ltr/ 10 sqm) on existing cement paint surface.Approved Make: Dulux Weathershild Flexx Exterior / Asian Duralife / NEROLAC Top Guard . .Quoted rate shall be including GST , transportation , lead , lift , scaffolding etc complete. Nothing extra shall be paid separately.
Panchratna Decorator
DIVYA SURESH DESHMUKH
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .