Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical ok |
Tender Value
₹2.3 L
EMD Value
₹4,636
Closing Date
19 Dec 2025, 9:00 amClosed
Prodhan Baroghoria GP
Baroghoria Dhupguri
CONSTRUCTI ON OF CC ROAD FROM MURSHEDUL HAQUE TOWARDS HABIBUL ISLAM HOUSE VI
2025_ZPHD_956369_1
BAROGHORIA/GP/NIT-003(4th call)/2025-26
Open Tender
CIVIL WORKS
Percentage
30 days
Baroghoria GP area
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
149030133567 WBSC0JCCB02
₹4,636
31 Dec 2025
22 Nov 2025
22 Dec 2025
22 Nov 2025
19 Dec 2025
22 Nov 2025
Surface Dressing of the ground in any kind of soil including removing vegetation inequalities not exceeding 15 cm depth and disposal of the rubbish within a lead upto 75 m as directed.
Earthwork in excavation from borrow pits (land owned/arranged by the Department) and depositing in layers of 250 mm. including breaking clods in embankment works and to fill up back of abutments, depressions and ruts with an initial lead up to 50 m and initial lift up to 1.5 m making bunds at top as directed dressing complete. (Borrow pit measurement)
Construction of Sub Base using Local Materials, spreading in uniform layers with Motor grader on prepared surface, including screening the metal as necessary, mixing by mix in place method with Rotavator at OMC, and compacting with vibratory roller to achieve the desired density, lighting, guarding and barricading including cost and carriage of all materials and making necessary earthen bundh of one metre wide on each side to protect the edges complete as per Clause 401 of specifications for Road & Bridge Works of MoRT&H (5th Revision). For Construction of Sub Base by compacting river bed materials.
Cement concrete with 30 mm down graded shingles excluding shuttering. 1:3:6 proportion
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. River Bazree
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) 25 mm to 30 mm shuttering without staging in foundation
Supplyying,Fitting,Fixing Information Board
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.59 MB
BOQ_2296450.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .