| 1.00Construction of Horizantal SoakPit at near Madurai Road in Ayanbommaiahpuram Village and Panchayat | |||||
| 2.00 | Earth work Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10m and lift 2m ( For roads, supply channels, desiliting of MI Tanks, Pond & Kulam) - upto 0.30m depth | 91.84 | cum | 135 ₹12,398.40 | 130 ₹11,939.20 |
| 3.00 | Cement Mortal 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum. | 11.38 | cum | 5,750 ₹65,435 | 5,712 ₹65,002.56 |
| 4.00 | Supplying and erecting water tight steel shuttering to centering including necessary supports for plane surface in Foundation and Basement for RCC Columns, Footings, Plinth beams, bed blocks, staircase steps etc., using suitable mild stee | 100.98 | sqm | 551 ₹55,639.98 | 547 ₹55,236.06 |
| 5.00 | Cement concrete 1:3:6(one cement,Three sand and six hard broken stone jally)m using 20mm ISS HBG metal including cost and conveyance of all materials to work site etc., complete as per standard specification. | 9.32 | cum | 6,502 ₹60,598.64 | 6,496 ₹60,542.72 |
| 6.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) | 0.17 | MT | 91,900 ₹15,623 | 91,885 ₹15,620.45 |
| 7.00 | RCC 1:1.5:3 ,using 20MM. gauge machine broken hard granite stone jelly for all RCC items of works excluding cost of reinforcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs wherever necessaryand bearing surfaces of walls, sides and bottom of the slabs, beams etc. shall be finished smooth with cement mortar 1:3 (One cement and three M-Sand) 12MM thick and with Kraft paper without claiming extra etc. as directed by the departmental officers complete complying with standard specification. The rate is including vibration charges: | 2.23 | sqm | 9,620 ₹21,452.60 | 9,602 ₹21,412.46 |
| 8.00 | Brick work in cement mortar 1:5 mix using country bricks 83/4"x41/4"x23/4" and conveyance of all materials to site and all labour charges etc., complete. | 11.25 | cum | 6,210 ₹69,862.50 | 6,185 ₹69,581.25 |
| 9.00 | Plastering with cement mortar 1:5 mix using 12mm thick including cost and conveyance of all materials to site and all labour charges etc., | 87.36 | sqm | 300 ₹26,208 | 285 ₹24,897.60 |
| 10.00 | Plastering with cement mortar 1:4 mix using 20mm thick including cost and conveyance of all materials to site and all labour charges etc., | 56.35 | sqm | 590 ₹33,246.50 | 585 ₹32,964.75 |
Tender Value
₹4.9 L
EMD Value
₹4,900
Closing Date
9 Dec 2025, 3:00 pmClosed
Block Development Officer (BP), Vilathikulam
Block Development Office, Vilathikulam
Construction of Horizantal SoakPit at near Madurai Road in Ayanbommaiahpuram Village and Panchayat in Vilathikulam Panchayat Union of Thoothukudi District under PGF 2025-26
2025_RDTN_628050_1
Construction of Horizantal SoakPit at near Madurai Road in Ayanbommaiahpuram Village and Panchayat i
Open Tender
Civil Works
Vilathikulam Block
Please Refer Tender Document
3 documents required · 3 mandatory
₹0
₹4,900
9 Feb 2026
2 Dec 2025
9 Dec 2025
2 Dec 2025
9 Dec 2025
2 Dec 2025
Construction of Horizantal SoakPit at near Madurai Road in Ayanbommaiahpuram Village and Panchayat
Earth work Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10m and lift 2m ( For roads, supply channels, desiliting of MI Tanks, Pond & Kulam) - upto 0.30m depth
Cement Mortal 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Supplying and erecting water tight steel shuttering to centering including necessary supports for plane surface in Foundation and Basement for RCC Columns, Footings, Plinth beams, bed blocks, staircase steps etc., using suitable mild stee
Cement concrete 1:3:6(one cement,Three sand and six hard broken stone jally)m using 20mm ISS HBG metal including cost and conveyance of all materials to work site etc., complete as per standard specification.
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
RCC 1:1.5:3 ,using 20MM. gauge machine broken hard granite stone jelly for all RCC items of works excluding cost of reinforcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs wherever necessaryand bearing surfaces of walls, sides and bottom of the slabs, beams etc. shall be finished smooth with cement mortar 1:3 (One cement and three M-Sand) 12MM thick and with Kraft paper without claiming extra etc. as directed by the departmental officers complete complying with standard specification. The rate is including vibration charges:
Brick work in cement mortar 1:5 mix using country bricks 83/4"x41/4"x23/4" and conveyance of all materials to site and all labour charges etc., complete.
Plastering with cement mortar 1:5 mix using 12mm thick including cost and conveyance of all materials to site and all labour charges etc.,
Plastering with cement mortar 1:4 mix using 20mm thick including cost and conveyance of all materials to site and all labour charges etc.,
Supply and filling of ISS HBG 20mm metal including cost and conveyance of all materials etc., complete.
Supply and filling of 4 to 8 mm metal including cost and conveyance of all materials etc., complete.
Supply and fixing of Cuddapah slab 50mm thick cost and conveyance of all materials etc., complete.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.44 MB
TechnicalBid.pdf
Tender Documents • 0.64 MB
BOQ_750868.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid