Loading…
Loading…
Tender Value
₹6.8 L
EMD Value
₹13,700
Closing Date
28 Aug 2026, 10:30 am5d left
Executive Engineer Haroli Division HPPWD Haroli
Executive Engineer Haroli Division HPPWD Haroli
Restoration of rain damage on Tahliwal to Bathri road Km 0/0 to 8/00 SH C/o drain between RD 1/320 to 1/420 and C/o R/wall etc
2026_PWD_141423_1
J5 Restoration of rain damage on Tahliwal to Bathri road Km 0/0 to 8/00 SH C/o drain between RD 1/32
Open Tender
Civil Works
Percentage
Haroli
Please refer to bidding document
13 documents required · 13 mandatory
₹350
₹13,700
22 Aug 2026
22 Aug 2026
28 Aug 2026
22 Aug 2026
28 Aug 2026
22 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing cement concrete mannually/ mechanical means including disposal of material within all lead and lift as per the direction by the Engineer-in-charge .The rates are inclusive octroi, royality,malkana ,toll tax,sale tax,GST,labour cess or other taxes imposed by the Government. | 9.7 | Per cubic metre | 800 | ₹7,760 |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains including dressing of sides and ramming of bottoms, lift upto any height including getting out the excavated soil and disposal of surplus excavated soil as directed, within any all kind of soil including entire carriage of material within all leads and lifts and other incidentials and as per the direction by the Engineer-in-charge .The rates are inclusive octroi, royality,malkana ,toll tax,sale tax,GST,labour cess or other taxes imposed by the Government. | 7 | Per cubic metre | 160 | ₹1,120 |
| 3 | Providing and laying mechanically mixed and vibrated concrete for plain/ reinforced concrete in open foundation/ for all type structure complete of plain cement concrete grade M-10 (M-Ten) with cement contents not less than 250kg(Two hundred fifty kilogram) per cubic metre in or under water and curing complete including pumping or bailing out water,dewatering removal of slush as required at site which may arise at the time of laying under water complete for all heights/ depths including the cost of form work as per drawings and technical specification Clause 802.803.1202 and 1203 as per the direction of the Engineer-in- charge including carriage of material with in all leads and lifts and other incidentals .The rate includes sale tax octori, royality,malkhana ,toll tax,GST,labour cess or other taxes imposed by the Government.. | 67.35 | Per cubic metre | 3,900 | ₹2,62,665 |
| 4 | Steel (Tata/Sail)work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required In gratings, frames, guard bar, ladder, railings, brackets, gates and similar worksincluding entire carriage of material within all leads and lifts and other incidentials as per the direction by the Engineer-in-charge .The rates are inclusive octroi, royality,malkana ,toll tax,sale tax,GST,labour cess or other taxes imposed by the Government. | 4,050 | Per Kilogramme | 102 | ₹4,13,100 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.34 MB
BOQ_209929.xls
BOQ • 0.32 MB
sbd.pdf
Tender Documents • 6.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].