Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 LAccepted-AOC | ₹4.2 L | L1 | Accepted-AOC L1 |
| 2 | L2₹4.2 LSame as L1Rejected-Finance | ₹4.2 LSame as L1 | L2 | Rejected-Finance L2 |
Tender Value
₹5.0 L
EMD Value
₹49,926
Closing Date
5 Jun 2026, 3:00 pmClosed
C.E.3
Zone 3
imp. C.C. Nali With Sarvices lane from Juhi Peli Colony Block No 7/2 and Block No 8/2 Peeli conlony in ward 84 Zone 3
2026_NNKAN_1145747_2
690/A.A.3/25-26
Open Tender
Civil Works
Fixed-rate
imp. C.C. Nali With Sarvices lane from Juhi Peli
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
₹49,926
18 Sept 2026
27 May 2026
5 Jun 2026
27 May 2026
5 Jun 2026
27 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Desliting/cleaning of open service lane under foul position and liquid mud etc all comp. | - | Cum | 200 | - |
| 2 | Earth Work in excavation in trenches for foundation pipe cable etc all comp | - | Cum | 170 | - |
| 3 | Earth Work in Cutting in Ordinary soil lead 30 mt & lift 1.5 mtincl lab T&P etc all comp | 1 | Cum | 115 | ₹114.89 |
| 4 | Class-150 birck work in 1:4 cement & coarse sand mortar in foundation and plinth including supply of all materials etc all comp | - | Cum | 6,600 | - |
| 5 | Providing and laying in position cement concrete of specified grade exing the cost of centering and shuttering 1:6:12 (1 cement:6 coars sand:12 graded brick etc all comp. | 1 | Cum | 4,380 | ₹4,375.62 |
| 6 | 12 mm thick plaster in single coat on fair side of single or half brick wall for interior plastering up to floor two level including etc all comp. | - | Cum | 257 | - |
| 7 | centering and shuttering inculding strutting propping etc all comp. | - | Sqm | 390 | - |
| 8 | R.C.C. Slab Work in open foundation 1:1.5:3 With cement C-sand & 20 mm stone grit ballast including shuttering mat lab etc all comp | - | Cum | 8,600 | - |
| 9 | M.S or tor steel (12-16) mm dia iron work in renforcement cutting Bending and binding including etc all comp. | - | qtl | 7,200 | - |
| 10 | Providing and laying in cement concrete 4:2:1 of not less than strength of m 150 ( stone ballast 4(20 mm normal size) etc all comp | - | Cum | 6,750 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_2162795.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 14.30 MB
BOQ_2162795.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .