| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAdmitted-Finance | ₹1.4 Cr | L1 | Admitted-Finance |
| 2 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 3 | Not Admitted-Fee/PreQual/Technical FH 1 A BLOCK VARDHAMAN GRAND PLAZA MANGALAM PLACE SECTOR 3 ROHINI DELHI 110085 | DELHI | NORTH WEST DELHI | DELHI | 110085 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | Lalparmawia L1 |
|---|---|---|---|---|
| 1.00Excavation of Drift on the Right and Left Abutment of Dam Portion of Tlawng Hydro-Electric Project | ||||
| 1.01 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. | 3,600 | Sqm | 60 ₹2,16,000 Lowest |
| 1.02 | Surface dressing of the ground including removing vegitation and in-equalities not exceedng 15cm deep and disposal of rubbish , lead upto 50m and lift upto 1.5m | 14,000 | Sqm | 63 ₹8,82,000 Lowest |
| 1.03 | Earthwork in excavation by mechanical means( Hydraulic excavator)/ manual means over areas(exceeding 30cm in depth, 1.5m in width as well as 10 sq mtr on plan) including getting out and disposal of excavated earth lead upto 50m and lift upto 1.5m as directed by engineer in charge - Ordinary rock | 3,123 | Cum | 1,350 ₹42,16,050 Lowest |
| 1.04 | Centering and shuttering including strutting, propping etc. and removal of form for
Foundations, footings, bases of columns, etc. for mass concrete | 15.68 | Sqm | 713 ₹11,179.84 Lowest |
| 1.05 | Centering and shuttering including strutting, propping etc. and removal of form for
-Columns, Pillars, Piers, Abutments, Posts and Struts | 24 | Sqm | 882 ₹21,168 Lowest |
| 1.06 | Centering and shuttering including strutting, propping etc. and removal of form for
-Arches, domes, vaults up to 6 m span | 23.55 | Sqm | 1,765 ₹41,565.75 Lowest |
| 1.07 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
-Thermo-Mechanically Treated bars of grade Fe-500D or more. | 116.04 | Kg | 180 ₹20,887.2 Lowest |
| 1.08 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level.
-Thermo-Mechanically Treated bars of grade Fe-500D or more. | 577.12 | Kg | 180 ₹1,03,881.6 Lowest |
| 1.09 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :
:1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 2.74 | Cum | 11,512 ₹31,588.93 Lowest |
Tender Value
₹1.3 Cr
EMD Value
₹3.9 L
Closing Date
15 Jul 2024, 9:00 amClosed
Executive Enginee
O/o Executive Engineer, NEID-II, CWC, Aizawl.
Procurement of Excavation of Drift on the Right and left Abutment of Dam Portion of Tlawng Hydro-Electric Project near Lungleng village, Distt. Aizawl under North Eastern Investigation Division-II, CWC, Aizawl(Mizoram)
2024_CWC_811403_1
02/2024-25/NEID-II/AIZAWL
Open Tender
Civil Works
Item Rate
150 days
Aizawl
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹3.9 L
Yes
Aizawl
3 Oct 2025
12 Jun 2024
15 Jul 2024
12 Jun 2024
15 Jul 2024
13 Jun 2024
13 Jun 2024 - 24 Jun 2024
15 Jun 2024
Amount
Excavation of Drift on the Right and Left Abutment of Dam Portion of Tlawng Hydro-Electric Project
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared.
Surface dressing of the ground including removing vegitation and in-equalities not exceedng 15cm deep and disposal of rubbish , lead upto 50m and lift upto 1.5m
Earthwork in excavation by mechanical means( Hydraulic excavator)/ manual means over areas(exceeding 30cm in depth, 1.5m in width as well as 10 sq mtr on plan) including getting out and disposal of excavated earth lead upto 50m and lift upto 1.5m as directed by engineer in charge - Ordinary rock
Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete
Centering and shuttering including strutting, propping etc. and removal of form for -Columns, Pillars, Piers, Abutments, Posts and Struts
Centering and shuttering including strutting, propping etc. and removal of form for -Arches, domes, vaults up to 6 m span
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. -Thermo-Mechanically Treated bars of grade Fe-500D or more.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. -Thermo-Mechanically Treated bars of grade Fe-500D or more.
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Reinforced cement concrete work in arches, archribs, domes, vaults, shells, folded plate and roofs having slope more than 15° up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources).
Excavation of drift in different formation with cost of all labour, T&P and POL, excluding cost of explosive materials, wooden/steel supports complete and as per directions of engineer-in-charge. - In Hard Rock formation: up to 30 m length
Excavation of drift in different formation with cost of all labour, T&P and POL, excluding cost of explosive materials, wooden/steel supports complete and as per directions of engineer-in-charge. - In Hard Rock formation:from 30 m to 100 m long
Erection of Wooden Supports in drifts including cost of materials fitting and fixing in position complete with cost of all labour , T&P and transport as per directions of Engineer-in-charge
Carriage of excavated rocks by manual transport including loading and un loading and stacking etc. (20% extra qauntity has been considered for over fallen muck due to natural causes such as geological faults etc.) (For 1st 50meters)
Carriage of excavated rocks by Mechanical Transport up to 1 Km including loading and un loading and stacking etc. (20% extra qauntity has been considered for over fallen muck due to natural causes such as geological faults etc.)
Purchase and supply of explosives for blasting
Small dia explosive
Delay detonators
Electric detonators
Detonating fuse coil
Carriege Charges of Explossive materials
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .