Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹9.6 LAccepted-AOC N A | ₹9.6 L | 1 | Accepted-AOC AOC |
| 2 | 2₹10.4 LRejected-Finance VPO DUMERKHA KALAN TEH NARWANA 126116 | DUMERKHA KALAN | JIND | HARYANA | 126116 | ₹10.4 L | 2 | Rejected-Finance 2 |
| 3 | 3₹10.8 LRejected-Finance PLOT 411 GALI NO 9 GANDHI NAGAR GANDHI NAGAR 122001 | GANDHI NAGAR | GURUGRAM | HARYANA | 122001 | ₹10.8 L | 3 | Rejected-Finance 3 |
| Sl No | Description | Qty | Unit | THE ROHINI COOP L&C SOCIETY LTD. L1 | The V.K. Co-Operative Labour & Construction Society Limited L2 | THE JIYA CO-OPERATIVE LABOUR & CONSTRUCTION SOCIETY LIMITED L3 |
|---|---|---|---|---|---|---|
| 2.00Annual Maintenance/Servicing and Operation of AC (Split, Window and Cassette) .Servicing and Repaing of DG Set 125 KVA, Supply Erecrtion of indoor Lights Panels other contingent there on at MCG Office Building Sector 39 and Sector 42 MCG for the year of 2025-26 | ||||||
| 3.00 | Supply and Erection of Extension Board 16A ( Havells, Anchor) | 20 | Each | 325 ₹6,500 | 350 ₹7,000 | 360 ₹7,200 |
| 4.00 | Supply and Erection of Combined Switch Socket with Gang Box 16A (Anchor, Grish) | 20 | Each | 233 ₹4,660 | 250 ₹5,000 | 270 ₹5,400 |
| 5.00 | Supply and Erection of Electric Bell Havells | 20 | Each | 123 ₹2,460 | 132 ₹2,640 | 135 ₹2,700 |
| 6.00 | Supply and Erection of Electronic Remote Bell ( Havells, GM) | 20 | Each | 288 ₹5,760 | 310 ₹6,200 | 315 ₹6,300 |
| 7.00 | Supply and Erection of Extension Board 6 A (3 plus 1) ( Havells, anchor) | 25 | Each | 205 ₹5,125 | 220 ₹5,500 | 225 ₹5,625 |
| 8.00 | Supply and Erection of Wall fan (Havells, Orient, Bajaj) | 30 | Each | 1,470 ₹44,100 | 1,580 ₹47,400 | 1,600 ₹48,000 |
| 9.00 | Supply and erection of 2.5 sqmm 3 core unard FRLS PVC insulated ISI Marked copper conductor cable complete as per entire satisfication of engineer in charge.Make RR / Havells / Polycab/Grandley. 2.5 Sq. mm 3 Core Cable. | 1,000 | Metre | 104 ₹1,04,000 | 112 ₹1,12,000 | 113 ₹1,13,000 |
| 10.00 | S/E of LED Bulb 9 watt Make Bajaj/Philips/G.E./ Halonix/ Crompton and accessories required to complete the job in all respect the entire satisfaction of Engineer-In-charge | 30 | Each | 76 ₹2,280 | 82 ₹2,460 | 85 ₹2,550 |
| 11.00 | S/E of T-5 energy efficient LED light fitting 1x20 watt, with 20 watt LED tube fit on wall/ceiling including necessary connections in all respect Make:- Bajaj/Philips/G.E./Halonix /Crompton | 50 | Each | 270 ₹13,500 | 290 ₹14,500 | 300 ₹15,000 |
Tender Value
₹10.4 L
EMD Value
₹20,725
Closing Date
30 Apr 2026, 12:00 pmClosed
SACHIN YADAV
Municipal Corporation Gurugram
Annual Maintenance/Servicing and Operation of AC (Split, Window and Cassette) .Servicing and Repaing of DG Set 125 KVA, Supply Erecrtion of indoor Lights Panels other contingent there on at MCG Office Building Sector 39 and Sector 42 MCG for the ye
2026_HRY_516720_1
202631574BB5 14A3 4835 A0E5 4F39E0775986285ULB
Open Tender
Civil Works
90 days
Gurugram
Annual Maintenance/Servicing and Operation of AC (Split, Window and Cassette) .Servicing and Repaing of DG Set 125 KVA, Supply Erecrtion of indoor Lights Panels other contingent there on at MCG Office Building Sector 39 and Sector 42 MCG for the ye
2 documents required · 2 mandatory
₹1,180
Yes
₹20,725
Yes
11 May 2026
22 Apr 2026
30 Apr 2026
22 Apr 2026
30 Apr 2026
22 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2 | Annual Maintenance/Servicing and Operation of AC (Split, Window and Cassette) .Servicing and Repaing of DG Set 125 KVA, Supply Erecrtion of indoor Lights Panels other contingent there on at MCG Office Building Sector 39 and Sector 42 MCG for the year of 2025-26 | - | - | - | - |
| 3 | Supply and Erection of Extension Board 16A ( Havells, Anchor) | - | Each | - | - |
| 4 | Supply and Erection of Combined Switch Socket with Gang Box 16A (Anchor, Grish) | - | Each | - | - |
| 5 | Supply and Erection of Electric Bell Havells | - | Each | - | - |
| 6 | Supply and Erection of Electronic Remote Bell ( Havells, GM) | - | Each | - | - |
| 7 | Supply and Erection of Extension Board 6 A (3 plus 1) ( Havells, anchor) | - | Each | - | - |
| 8 | Supply and Erection of Wall fan (Havells, Orient, Bajaj) | - | Each | - | - |
| 9 | Supply and erection of 2.5 sqmm 3 core unard FRLS PVC insulated ISI Marked copper conductor cable complete as per entire satisfication of engineer in charge.Make RR / Havells / Polycab/Grandley. 2.5 Sq. mm 3 Core Cable. | - | Metre | - | - |
| 10 | S/E of LED Bulb 9 watt Make Bajaj/Philips/G.E./ Halonix/ Crompton and accessories required to complete the job in all respect the entire satisfaction of Engineer-In-charge | - | Each | - | - |
| 11 | S/E of T-5 energy efficient LED light fitting 1x20 watt, with 20 watt LED tube fit on wall/ceiling including necessary connections in all respect Make:- Bajaj/Philips/G.E./Halonix /Crompton | - | Each | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.90 MB
BOQ_595586.xls
BOQ • 0.28 MB
AD0160586.pdf
Additional Documents • 0.90 MB
OT0160586.pdf
Other Document • 0.90 MB
Download all tender documents and submit your bid