Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹898.8 CrAccepted-AOC | ₹898.8 Cr | L1 | Accepted-AOC RMN INFRASTRUCTURES LIMITED L1 |
| 2 | L2₹1559 CrRejected-Finance | ₹1559 Cr | L2 | Rejected-Finance L2 |
| 3 | Not Admitted-PreQual/Technical | - | - | Not Admitted-PreQual/Technical Not Complied with technical specification |
Tender Value
₹980.9 Cr
EMD Value
₹50 L
Closing Date
30 Aug 2022, 5:30 pmClosed
Chief Engineer
Chief Engineer Rani Avanti Bai Lodhi Sagar Project, Bargi Hills, Jabalpur
Construction of Upper Narmada Project on Narmada River on Turnkey Basis including construction of dam and 45600 Ha. CCA pressurized pipes micro irrigation system upto 2.5 Ha. Chak of 0.35 lps/ha. as per detail scope of work.
2022_NVDA_201922_1
13/G/CE/2022-23
Open Tender
Civil Works - Lift Irrigation Schemes
1825 days
Dindori
Please refer Tender documents.
5 documents required · 5 mandatory
₹50,000
₹50 L
Bhopal
28 Dec 2022
7 May 2022
1 Sept 2022
7 May 2022
30 Aug 2022
7 May 2022
26 May 2022
Amount
Construction of Upper Narmada Project on Narmada River on Turnkey Basis including construction of dam and 45600 Ha. CCA pressurized pipes micro irrigation system upto 2.5 Ha. Chak of 0.35 lps/ha. In districti Dindori and Anuppur including SCADA work as per detail scope of work.
Construction of Upper Narmada Project on Narmada River on Turnkey Basis including construction of dam and 45600 Ha. CCA pressurized pipes micro irrigation system upto 2.5 Ha. Chak of 0.35 lps/ha. In districti Dindori and Anuppur including SCADA work as per detail scope of work.
Shapoorji Pallonji And Company Private Limited
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid