Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹2,000
Closing Date
2 Dec 2026, 12:00 pm6d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer
Office of the Executive Engineer, Electricity Transmission Division, UPPTCL, Hussainganj, Sitapur.
work
2026_UPTCL_1212213_1
Very Short Term E-Tender No.09/ETD(S)/2026-27
Open Tender
Electrical Works
Item Rate
15 days
Sitapur
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
Acc. No. 10906917956 IFSC-SBIN0000720
₹2,000
25 Nov 2026
25 Nov 2026
2 Dec 2026
25 Nov 2026
2 Dec 2026
25 Nov 2026
25 Nov 2026 - 2 Dec 2026
180 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 11. Online Testing to be conducted on Transformer:- (A) 1- On line Partial Discharge Measurement. 2. Thermographic Measurement. 3. Noise Level Measurement. 4. Vibration Level Measurement. 5. Oil Test (NABL Approved Lab): (i)- General oil test as per IS 1866:2000 (Resistivity, Tan delta, BDV, Water PPM, IFT, Acidity, Flash point & Sludge content). (ii)- DGA as per relevent IEC (iii)- Furan analysis. | |||||
| 1.01 | 2. Offline Testing to be conducted on Transformer:- (i)- Capacitance & ten Delta of Bushing & Winding. (ii)-Turn Ratio at each taps. (iii)- Vector Group test. (iv)- Short Circuit Impedence test. (v)- Megnetizing current on each tap. (vi)- Magnetic balance test. (vii)- Winding resistance at all taps. (Viii)- IR & PI Test. (ix)- Sweep Frequency response analysis test & Mechanical Assessment. (x)- Frequency response on stray loss test (FRSL) (xi)- Leakage Reactance & Impendance measurement. (xii)- Dynamic Contact resistance test for OLTC performance check. (xiii)- Moisture assessment & Dielectric analysis of winding insulatioin (FDS measurement). Note:-1. All testing equipment (with latest calibration from NABL Lab) will be provided by the contractor. 2. Cost of transportation for oil sample & shifting of all testing equipment will be in the scope of the contractor. No extra payment will not be allowed. 3. Petty or sub-contracting will not be allowed. 4. Contractor should have own NABL Approved Lab. | - | - | - | - |
| 1.02 | 220/132KV, 100 MVA T/F (Alstome make, mfg.year 2000) installed at 220/132KV Sub-Station, Sitapur. | 1 | Job | 1,64,820 | ₹1,64,820 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.03 MB
Tenderdocument.pdf
Tender Documents • 0.17 MB
BOQ_2305094.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .