Tender Value
₹4.8 L
EMD Value
₹9,700
Closing Date
5 Sept 2026, 6:00 pm
Executive engineer rew jammu
TALAB TILLO JAMMU
Skill Development Hub Rural Co working space at community hall NS Pura Panchayat Pargwal Upper Block Pargwal Civil Part under DDC
2026_RDPR_321958_2
e-NIT No. 476 REWJ of 2026-27 dated 22-08-2026
Open Tender
Civil Works
Percentage
30 days
jammu
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
GOVERNMENT TREASURY
₹9,700
22 Aug 2026
22 Aug 2026
7 Sept 2026
22 Aug 2026
5 Sept 2026
22 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Labour Engaged for general site clearnace | 5 | Lab | 553 | ₹2,765 |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides andramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed | 10.58 | cum | 479.3 | ₹5,070.99 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 11.07 | cum | 4,826.5 | ₹53,429.36 |
| 4 | Providing and laying water proofing treatment on roofs of slabs byapplying cement slurry mixed with water proofing cement compound consisting of applying : (a) after surface preparation, first layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound@ 0.253 kg/sqm. (b) laying second layer of Fibre glass cloth when the first layer is still green. Overlaps of joints of fibre cloth should not be less than 10 cm. (c) third layer of 1.5 mm thickness consisting of slurry of cement @
1.289 kg/sqm mixed with water proofing cement compound @ 0.670 kg./sqm. and coarse sand @1.289 kg/sqm. This will be allowed to air cure for 4 hours followed by water curing for 48 hours. The entire treatment will be taken upto 30cm on parapet wall and tucked into groove in parapet all around.(d) fourth and final layer of brick tiling with cement mortar (which will be paid for separately) For the purpose of measurement the entire treated surface will be measured. | 93.05 | sqm | 556.2 | ₹51,754.41 |
| 5 | Repairs to plaster of thickness 12mm to 20 mm in patches of area 2.5 sq. meters and under, including cutting the patch in proper shape raking out joints and preparing and plastering the surface of the walls complete including disposal of rubbish to the dumping ground within 50 meters lead 14.1.1 With cement mortar 1:4 (1 cement : 4 fine sand) | 62.73 | sqm | 441.4 | ₹27,689.02 |
| 6 | Providing and laying in position cement concrete of specified grade including curing but
excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 | 3.95 | cum | 6,591.25 | ₹26,035.44 |
| 7 | Providing and laying in position cement concrete of specified grade including curing but
excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 | 21.16 | cum | 5,733.45 | ₹1,21,319.8 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form work for:
4.6.1 Foundations, footings, bases for columns | 46.28 | sqm | 286.35 | ₹13,252.28 |
| 9 | Removing white or colour wash by scrapping and sand papering and
preparing the surface smooth including necessary repairs to scratches etc.
complete | 156.83 | sqm | 14.5 | ₹2,274.04 |
| 10 | Finishing walls with water proofing cement paint of required shade:
13.117.1 Old work (one or more coats applied @ 2.20 kg/10sqm) over Old work (one or more coats applied @ 2.20 kg/10sqm)
complet | 126.79 | sqm | 64.45 | ₹8,171.62 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.52 MB
BOQ_1076714.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].